Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Q A | — | |
| Site Visit Q A.doc | DOC document | |
| FA4861-08-R-A028-01.doc | DOC document | |
| Site Visit Minutes | — | |
| NV080022_Heavy_Rev07.dot | DOT file | |
| TC 25-8 Ranges 2004.pdf | ||
| LayoutHandGrenadeTrainingRange.pdf | ||
| FM3-23.30 Hand Grenade.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Construct Hand Gernade Range 6
FFP
Contractor shall furnish all labor, supervision, equipment, tools, materials and incidental work and professional design as necessary to perform all work to design and construct project RKXF 08-8010, Construct Range 6/6A Hand Grenade Training Range at the Nellis Air Force Range (R63C) near Creech AFB, NV as ordered by the Contracting Officer. All work is to be performed in strict accordance with the terms, and conditions specified herein.
DESIGN $______________
CONSTRUCT $_______________
FOB: Destination
PURCHASE REQUEST NUMBER: F3GHFA8152A003
PROJECT: RKXF 08-8010
SIGNAL CODE: A
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
RKXF 08-8010
CONSTRUCT RANGE 6/6A HAND GRENADE TRAINING RANGE, R63C
(14 July 2008)
GENERAL REQUIREMENTS
SCOPE OF SERVICES:
The design-build contract will consist of two separate segments by the Contractor. The first is the Design Segment and the second is the Construction Segment. The specific requirements for this project are detailed in the description of work. These requirements will govern the Contractor’s Design and Construction Segments of the contract. The Scope of Services will include the following.
DESCRIPTION OF WORK:
The Contractor shall furnish all labor, supervision, materials, tools, equipment, incidental work, and professional design as necessary to design and construct a Hand Grenade Training Range at the Nellis Air Force Range (R63C) near Creech Air Force Base Nevada for the 99th Ground Combat Training Squadron. The training range consists of 6 earthen berms, 5 throwing pits, 1 observation pit and 1 ready wall. A proposed layout of the training range is provided for reference. Additional guidance is also available in US Army Field Manual No. 3-23.30, dated June 2005 and Training Circular No. 25-8, dated April 2004. The contractor will be required to submit a 35%, 95% and 100% final design package to the Government for review and approval. Offeror shall be responsible for obtaining any documents not attached as part of the RFP but referenced as criteria for the project. The project shall include, but is not limited to the following major items of work:
a. Earthen Berms (6 Total). Each earthen berm shall be 6 feet high. The cross section shall be trapezoidal, measuring approximately 6 feet wide at the top and 42 feet wide at the base. The longitudinal section shall be trapezoidal, measuring approximately 128 feet at the top and 164 feet at the base. The slope on all four sides shall be a rise of 1 foot per 3 feet of run. No borrow pit is available on site; therefore, all soil necessary to construct the earthen berms will be provided by the contractor. Provide necessary clearing and grubbing along with the demolition of existing structures. Berms shall be constructed parallel to each other and with a separation distance of 164 feet center-to-center. See proposed layout for reference.
b. Throwing Pits (5 Total). Each throwing pit shall be constructed with reinforced concrete walls and footing. Three sides of the structure measure 9’ wide x 6’ high x 0.5’ thick and the fourth side (knee wall) measures 9’ wide x 2’ high x 0.5’ thick. The top of the knee wall shall be sloped inward to allow any grenade dropped on the wall to roll into the throwing pit. Install drain pipes (no more than 2 inches in diameter) in the knee wall to allow throwing pit drainage. Slope the floor of the pits in the direction of the drainage pipes. The structure shall a dirt floor and no roof. The first 12 inches in depth of the pit floor shall be excavated and backfilled with sand. Additionally, a sand pit is also required outside of the throwing pit past the knee wall. Excavate an area 9 feet wide x 9 feet long x 12 inches deep and backfill the area with sand. See proposed layout for reference.
c. Observation Pit. This 3-sided structure shall be constructed with reinforced concrete walls, footings, and floor slab with no roof. The main wall of the structure shall measure 12’ wide x 8 feet high x 0.5’ thick. The other two wing walls shall each measure 9’ wide x 8’ high x 0.5’ thick. Construct the wing walls at a 135( angle from the main wall. Provide a total of four (4) windows, each measuring 30” wide x 24” high. Install 2 windows equidistant across the main wall and 1 window centered on each of the wing walls. All the windows shall be installed approximately 46” from the finished floor elevation to the bottom of the windows. The window panes shall be 35 mm (about 1-3/8 inches) thick and constructed in accordance with paragraph C-4, page C-2, Appendix C of US Army Field Manual No. 3-23.30. The finished floor elevation shall be approximately 12” above grade. Provide concrete steps across the back side (the side without a wall) for easy access to the reinforced concrete observation deck floor. See proposed layout for reference.
d. Ready Wall. The ready wall consists of two detached reinforced concrete walls with a 6 foot separation. The total requirement is 48 LF of wall x 8’ high x 0.5’ thick along with adequate footings. The ready wall shall have a dirt floor and no roof. See proposed layout for reference.
DESIGN SEGMENT
1.
Contractor is responsible for field verifying all information given. The Design Segment shall consist of the following stages.
a. Contractor’s Proposal & Site Visit: A site visit will be scheduled after Contractor’s receipt of this RFP.
b. Notice to Proceed (NTP) with Design: After award and receipt of bonding, an NTP shall be provided to the Contractor to proceed with the Design Segment of the Contract. The contractor shall take the design to 35%, 95% and 100% design as specified below. The design segment shall be 98 calendar days, including government review as outlined below.
(1) 35% Design: The Contractor shall provide the government with the 35% design submittal to the Contracting Officer within 35 calendar days of receipt of the Notice to Proceed (NTP). The Government will then have 14 CALENDAR DAYS after receipt to review and provide comments back to the contractor. The 35% design shall include the following items:
A. Orientation of the new facility
B. Site Plan drawing showing overall layout
C. Elevation drawing of throwing pit, observation wall and ready wall including footings
D. Specifications outline (2) 95% Pre-Final Design: The Contractor shall provide the government with the 95% design submittal to the Contracting Officer within 21 calendar days of receipt of the Notice to Proceed (NTP) which will include the Government’s 35% design comments. This submittal shall consist of the proposed final Schedule of Materials, Equipment and Finishes and four sets of the drawings and specifications for review. The Government will then have 14 CALENDAR DAYS after receipt to review and provide comments back to the contractor. The 95% design shall include the following items:
A. Complete details of the throwing pit.
B. Complete details of the observation wall and ready wall C. Material submittal schedule
(3) 100% Final Design: The Contractor shall provide the government with the 100% Design Submittal within 7 calendar days of approval of the 90% design submittal. After the specified review period, the Contractor shall incorporate all review comments received during the Final Design review. The Contractor shall submit one check set to allow the government to insure complete incorporation of the review comments. Upon approval of the check set, the Contractor shall then provide the Contracting Officer four bound sets of the final Schedule of Materials, Equipment and Finishes, and design analysis. The Contractor shall provide four sets of the specifications and full size hard copy drawings and the digitized drawings on CD media. The Government will then have 7 CALENDAR DAYS after receipt to review and provide comments back to the contractor. After final review and acceptance of the completed, 100% design, NTP will be issued to start the Construction Segment.
2.
Elements of submission are clarified below:
a.
Submittals:
(1) Specifications shall be provided using the Construction Specifications Institute (CSI) MasterFormat 2004 Edition (49 Divisions). If available, draft copies of these specifications can be provided to the contractor upon request. The contractor shall edit the specification sections that correspond with the work required in the project. All approved 100% specifications shall be submitted on Compact Discs in a file format that is compatible with Microsoft Word 2003 for Windows.
(2) Identify all the necessary submittals during design on AF Form 66, Schedule of Material Submittals. Provide AF Form 66 with the 95% design submittal.
(3) Provide twelve (12) copies (4-full size and 8-half size sets) for each interim design submittal to the Contracting Officer for review and approval.
(4) Materials submittals shall be prepared and submitted in four (4) copies on an AF Form 3000, Material Submittal, for government review and approval. The contractor shall identify and submit for review any long-lead material items. Once approved, the contractor may request these long-lead items be placed on order.
(5) All drawings and documents provided during each design phase will be clearly annotated with the current percentage of design complete.
b.
Stamped Drawings: The government requires that all drawings be wet stamped and signed by a professional engineer or architect on those pages pertaining to their disciplines. Provide wet stamped engineering design drawings and calculations for the civil, structural, and others as required.
c.
Hardcopy and Electronic Output: All documents presented by the Contractor during the submittal process shall be presented in hardcopy and both hardcopy and digitized for the final design submittal. The digitized drawings will have digitized manufacturer’s data (maintenance data, spare parts data, etc, with catalog cuts) available through hyperlinks on the appropriate AutoCAD drawings. Drawings created must be saved and provided in PDF and AutoCAD 2005. Any specifications, reports, or studies will be provided in Microsoft Word. Electronic data will be provided on compact disks (CD) media.
d.
List of required design analysis: Civil and structural analysis, as applicable.
e.
Licenses: List all permits and licenses required to be obtained prior to start of construction work. The Contractor shall obtain all necessary underground utilities clearances, permits, and authorizations prior to beginning construction.
f.
Testing: Not applicable g.
Training: Not applicable h.
Abatement Plan: Not applicable i.
List of expected warranties and guarantees: One year from the date of final acceptance.
j.
List of Government Furnished Materials (GFM): None k.
Heating, Ventilation and Air Conditioning (HVAC) requirements: Not applicable l.
Energy Management Control System (EMCS) requirements: Not applicable m.
Fire suppression system, fire detection, alarm, and notification system requirements: Not applicable n.
Communications Requirements: Not applicable o.
Force Protection Requirements: Not applicable p.
American Disabilities Act (ADA) requirements: Compliance with ADA is not required.
q.
Exterior finish requirements: Not applicable r.
Roofing requirements: Not applicable s.
Doors and windows requirements: No doors are required on this project. See US Army FM 3-23.30 paragraph C-4, page C-2 for composition of laminated window panes.
t.
Interior finish requirements: Not applicable u.
Landscaping requirements: None.
v.
Site Improvement/Development requirements: The layout of the Hand Grenade Training Range shall be in accordance with the US Army Field Manual No. 3-23.30, dated June 2005 and Training Circular No. 25-8, dated April 2004.
w.
Utility Connection requirements: Not applicable x.
Licenses and Permits: Contractor is responsible for acquiring all necessary permits and fees for the legal operation of any installed equipment, to include dust permit, etc.
CONSTRUCTION SEGMENT
1.
NTP for Construction: After approval of the Final 100% Design Submittal, the Contracting Officer will issue a NTP for the Construction Segment of the contract. Construction shall be completed and ready for final inspection within 120 calendar days after receipt of the NTP.
2.
Pre-Construction Requirements: Upon acceptance of the 100% Final Submittal, the Contracting Officer will schedule a Pre-Construction Conference. It is anticipated that the NTP for construction shall be issued. As a minimum, the Contractor’s project manager and any appropriate subcontractor representatives shall attend a preconstruction conference at Nellis AFB. Upon receipt of the NTP for construction, the Contractor shall initiate all required digging permits.
3.
Pre-Final Inspection Requirements: When construction has progressed to the stage that the Contractor desires a Pre-Final Inspection, the Contractor can request one in writing to the Contracting Officer. The Contractor is responsible to continually maintain red-lined drawings during construction to reflect all changes to the project since Final Design approval. In addition to the red-lined copy of the drawings, the contractor shall provide a digitized set of the as-built drawings in AutoCAD.
4.
Contract Closeout Requirements: The contract will not be considered final or closed out until all requirements have been completed. This includes but is not limited to the correction of the inspection punch list items to the satisfaction of the Project Engineer / Architect and the Contracting Officer, the As-Built drawings in Auto CAD 2005 format have been received and accepted.
CLAUSES INCORPORATED BY FULL TEXT
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
See Section J.
(End of clause)
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| N/A |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-12 |
| Inspection of Construction |
| AUG 1996 |
Section F - Deliveries or Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 |
| 218 dys. ADC |
| 1 |
| 99 CES/CEC - F3GHFA |
ALBERTO S. VILLANO
6020 BEALE AVE, BLDG 812
NELLIS AFB NV 89191-7260
702-652-8427
FOB: Destination
F3GHFA
CLAUSES INCORPORATED BY FULL TEXT
52.211-12 Liquidated Damages -- Construction (SEPT 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract or task order, the Contractor shall pay liquidated damages to the Government in the following amounts:
(1) the sum of $189.69 for each day of unexcusable delay past the scheduled completion date until the date of beneficial occupancy (i.e., substantial completion as determined by the Contracting Officer);
(2) an additional sum of $243.48 for the first and last day of unexcusable delay exceeding the scheduled completion date; and
(3) the sum of $47.42 for each day of unexcusable delay exceeding the date of the beneficial occupancy (i.e. substantial completion as determined by the Contracting Officer) or the established completion date, whichever, occurs later, until the project is accepted by the Government, including but not limited to the completion of all punchlist items, final submittals, and cleanup.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
F-100
FEDERAL HOLIDAYS
This base observes the following Federal legal holidays:
New Year's Day
1 January
Martin Luther King's Birthday Third Monday In January
President's Day
Third Monday in February
Memorial Day
Last Monday in May
Independence Day
4 July
Labor Day
First Monday in September
Columbus Day
Second Monday in October
Veterans Day
11 November
Thanksgiving Day
Fourth Thursday in November
Christmas Day
25 December
NOTE:
Holidays falling on a Saturday will be observed on the preceding Friday.
Holidays falling on a Sunday will be observed on the following Monday.
(End of Clause)
F-101
NORMAL HOURS OF WORK
(a) Normal work hours for Base Engineering personnel are from 7:00 a.m. to 4:00 p.m., Monday through Friday, excluding Federal holidays. Access to work sites will be restricted to these hours and days, unless otherwise specified in the Statement of Work Section of the Specifications. Work that requires quality assurance during its accomplishment or that cannot be fully inspected after its completion, will normally not be allowed to be done during other than normal work hours/days without written Contracting Officer approval or as otherwise specified in the contract.
(b) Normal work hours for Contracting personnel are from 7:30 a.m. to 4:30 p.m., Monday through Friday, excluding Federal holidays. In order to ensure availability of personnel, please schedule your meetings and visits at least 24 hours in advance.
(End of Clause)
Section G - Contract Administration Data
CLAUSES INCORPORATED BY FULL TEXT
G-403
SUBMIT INVOICES ELECTRONICALLY
(a) To expedite payment, reduce lost documents, and increase visibility into the status of payments, the Department of Defense (DoD) has implemented electronic invoicing. In conformance with Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.232-7003, Electronic Submission of Payment Requests, which is incorporated herein by reference, contractors shall submit invoices ELECTRONICALLY through the Defense Finance and Accounting System (DFAS) Web Invoicing System [Wide Area Workflow – Receipt and Acceptance (WAWF-RA)] at https://wawf.eb.mil/. Additionally, contractors can also concurrently create electronic receiving reports when they create their invoices (select COMBO Invoice); with one keystroke they can ensure prompt presentation of the required data to the payment office.
(b) Applicable codes necessary for submission of invoices against this contract are as shown below.
ADMINISTERED BY:
FA4861
ISSUED BY:
CONTRACTING OFFICE:
(4)
PAYMENT OFFICIAL:
FORMDROPDOWN
(5)
INSPECT BY:
MACROBUTTON NoMacro [Click here and type BPN CODE]
(6)
LPO:
Leave BLANK
(c) Paper invoices may be rejected and returned by the DFAS Payment office and the contractor advised to invoice electronically.
(d) For assistance regarding specific electronic invoicing issues, please contact the WAWF Customer Service at 866‑618‑5988 or DFAS Electronic Commerce Division at 614‑693‑7674 . Web-based training is available at the WAWF site (http://www.wawftraining.com/).
(End of clause)
G-700
ADMINISTRATION AND PAYMENT
The resulting contract shall be administered by the following Contract Activity:
99 CONTRACTING SQUADRON/LGCA
5865 Swaab Blvd, Bldg 588
Nellis AFB NV 89191-7063
A properly prepared invoice shall be submitted electronically as identified in Clause G-701 below. Each invoice shall identify the Contract Line Item Number (CLIN) or Subcontract Line Item Number (SLIN) and its corresponding two-digit Account Contract Reference Number (ACRN).
Progress payments (NET-14) will be based on the last verified, approved progress report received. If a variance exists between the Contractor's and the Government's estimate, the contractor will be given the opportunity to support their position. If the additional information is not adequate or is not provided within one day, the invoice will be rejected and the Contractor will be provided the opportunity to resubmit at the Government's estimated percentage of work completed. A maximum amount of 90% of the contract price may be paid as progress payments.
Final payment (NET-30) will be for an amount not less than 10% of the contract amount and will be approved for payment after completion (including clean-up and submission of final warranties, as-built drawings, payrolls, and all other documents as required under the terms and conditions of this contract/task order) and final acceptance (including correction of all punchlisted items) of the project work.
With each request for payment, the contractor shall also attach a scanned copy of the following:
The most recent, signed progress report – or – daily quantity sheet for which work required by the contract has been completed and is being invoiced;
A listing of the amount included for work performed by each subcontractor under the contract, the total amount of each subcontract under the contract,. the amounts previously paid to each such subcontractor under the contract; and
For FINAL invoices, a fully executed, signed Release of Claims. NOTE: The original, signed Release of Claims shall be concurrently provided by mail or handcarried to the Contracting Office.
(End of clause)
G-701
SUBMIT INVOICES ELECTRONICALLY
(a) To expedite payment, reduce lost documents, and increase visibility into the status of payments, the Department of Defense (DoD) has implemented electronic invoicing. In conformance with Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.232-7003, Electronic Submission of Payment Requests, which is incorporated herein by reference, contractors shall submit invoices ELECTRONICALLY through the Defense Finance and Accounting System (DFAS) Web Invoicing System [Wide Area Workflow – Receipt and Acceptance (WAWF-RA)] at https://wawf.eb.mil/. Additionally, contractors concurrently create electronic receiving reports when they create their invoices (select CONSTRUCTION Payment Invoice); with one keystroke they can ensure prompt presentation of the required data to the administrative and payment offices.
Applicable codes necessary for submission of invoices against this contract are as shown below.
ADMINISTERED BY:
ISSUED BY:
CONTRACTING OFFICE:
PAYMENT OFFICIAL:
FORMDROPDOWN
INSPECT BY:
F3GHFA
LPO:
Leave BLANK
(7)
DESCRIPTION:
Project LKTC 08-8010, Construct Hand Grenade Training Range, and include percentage completed
(c) Paper invoices will be rejected and returned and the contractor advised to invoice electronically.
(d) For assistance regarding specific electronic invoicing issues, please contact the WAWF Customer Service at 866‑618‑5988 or DFAS Electronic Commerce Division at 614‑693‑7674 . Web-based training is available at the WAWF site (http://www.wawftraining.com/).
(End of Clause)
Section H - Special Contract Requirements
CLAUSES INCORPORATED BY FULL TEXT
H-100
REQUIRED INSURANCE (IAW FAR 28.306(b))
In conformance with FAR 52.228-5 clause, Insurance(Work on a Government Installation, the Contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.
Workmen's Compensation and Employers Liability Insurance as required by law (except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory). The required Workmen's Compensation insurance shall extend to cover employer's liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.
Automobile Liability Insurance. This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.
(b) An “Insurance Certificate of Compliance” form can be obtained upon request from the 99th Contracting Squadron contract administrator assigned to this requirement.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
H-101
PAYMENT AND PERFORMANCE BONDS
(a) After contract award (i.e., Notice of Award, Executed Contract or Task Order), the Contractor shall furnish two bonds, a Performance Bond (on Standard Form (SF) 25) and a Payment Bond (on Standard Form (SF) 25A), each with good and sufficient surety or sureties, acceptable to the Government. The penal sums of such bonds will be based on the awarded amount; or (if this is the initial award of an Indefinite Delivery, Indefinite Quantity (IDIQ) type contract) the guaranteed contract minimum or the amount of the first task order, whichever is larger. Each project under an IDIQ contract shall be bonded. When the award price is increased by modification, the penal sum of the bond shall be increased. The payment and performance bond amounts shall be as specified in FAR Clause 52.228-15, Performance and Payment Bonds--Construction. A Notice to Proceed (NTP) with the work awarded will not be issued by the Contracting Officer and no work shall begin until good and sufficient surety has been received and accepted by the Contracting Officer.
(b) All required bonds and bond increases shall be furnished by the Contractor to the Government within the timeframe prescribed on page 1 of this document after finalization of the award or modification document.
(c) Bonds shall be in the form of a firm commitment, supported by corporate sureties whose names appear on the list contained in Department of the Treasury’s Listing of Approved Sureties (Department Circular 570), individual sureties acceptable to the Contracting Officer, or other acceptable security such as a postal money order, certified check, cashier’s check, irrevocable letter of credit or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the U.S. Department of Treasury, Financial Management Services, Surety Bonds Branch, 401 14th St NW FL West, Washington DC 20227-1017. The listing may also be accessed electronically at the following address: http://www.fms.treas.gov/c570/index.html .
(End of Clause)
CLAUSES INCORPORATED BY FULL TEXT
H-102
DESIGNATION OF CONTRACTING OFFICER REPRESENTATIVE (COR)
The Base Civil Engineer or his/her authorized representative is designated as the representative of the Contracting Officer (COR) for the purpose of technical surveillance of workmanship and inspection of materials for work being performed under this contract. This designation in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms of the contract. The COR performs quality assurance for the government and is not authorized or required to perform the quality control for the contractor.
(End of Clause)
CLAUSES INCORPORATED BY FULL TEXT
H-104
ENVIRONMENTAL PROTECTION
(a) Solid, Liquid, and Gaseous Contaminants: The Contractor shall be responsible for the proper disposal of all solid, liquid and gaseous contaminants, including asbestos and lead based paint, in accordance with all applicable federal, state, local and Nellis Air Force Base (NAFB) laws, regulations, codes, and management plans, including NAFB Management Plan 12.
(b) Disposal of Refuse: The Contractor will be required to remove and properly dispose of all refuse from each respective installation for work performed under each task order.
(c) Covered Chutes/Receptacles: All chutes and/or receptacles used for refuse collection shall be covered at all times, or of such design as to fully confine the material to prevent the dissemination of dust.
(d) Soil Erosion: The Contractor shall provide and install protective barriers to prevent erosion on all required excavations.
Wind: County Dust Permits are required for surface disturbances greater than 1/4 acre, or 100 lineal feet of trenching. Copies of any approved dust permits must be provided to 99 CES/CEVC (Air Program Manager) through the Contracting Officer. If in the opinion of the Contracting Officer, excessive dust is generated by the construction effort, the Contractor shall, at no cost to the Government, stop all activity until adequate dust control measures are implemented. County Dust Permits are required for all projects at Nellis and Creech AFB’s. The contractor must obtain all required County Dust Permits and submit a copy to 99 CES/CEVC prior to initiating work. The typical time to obtain a dust permit is two weeks.
(2) Water: The Contractor shall comply with all applicable Federal, State, local and Nellis AFB laws, regulations, codes and management plans in preventing the discharge of sediment into any stream, river, or waterway through direct discharge or by storm water runoff.
(e) Material Safety Data Sheets (MSDS): At least fourteen (14) calendar days prior to use, the Contractor shall submit three (3) copies of MSDS for any chemical or hazardous material, as defined In Federal Acquisition Regulation clause 52.223-3, Hazardous Material Identification and Material Safety Data, to the Contracting Officer as a submittal item. The contractor shall retain a copy for on site use (see Nellis AFB Requirements for Hazardous Materials Authorization Procedures for Contractors).
(f) Contaminated Soils: Work requested of the Contractor may include the removal and/or disposal of contaminated soils. Contaminated soils are defined as soils containing non-hazardous materials such as JP-8 aircraft fuel, heating fuel oil, or other materials, as may be identified by 99 CES/CEV. All contaminated material shall be removed, transported and disposed of in accordance with all applicable laws, regulations and policies, as identified in clause (a) above. The contractor shall also submit a copy of all permits and disposal certificates to the Contracting Officer as a submittal item for review by 99 CES/CEVP. All costs incurred for the disposal of contaminated soils, as a result of the Contractors negligence, will be the Contractors responsibility.
(g) Hazardous Materials: The Contractor shall immediately notify the Contracting Officer, Quality Assurance Evaluator (QAE) or Inspector, any material used during execution of the work period, which is suspected of being hazardous, in accordance with federal, state, and local laws and regulations; . All Hazardous Materials must be authorized before being brought on or used on Nellis AFB (See attached hazardous materials authorization and usage procedural documents). All hazardous materials must be properly stored and handled per federal, state and local laws and regulations. Where applicable, the Contractor shall use environmentally safe products.
(h) Hazardous Waste: The Contractor is responsible for the proper handling and management of all hazardous waste generated from his work performed on Air Force property. The contractor must, store, document and transport hazardous waste in accordance with applicable Federal, State, local and Air Force regulations. Unless otherwise specified, in complying with NAFB Management Plan 12 requirements, the contractor must contact 99 CES/CEV for waste handling instructions and disposal coordination. Only authorized NAFB individuals are allowed to sign a Uniform Hazardous Waste Manifest for Nellis AFB. The contractor will be held fully liable for any contractor activity/ non-activity resulting in a Notice of Violation (NOV) or any other regulatory penalty. All hazardous or non-hazardous wastes generated by the Contractor will be the responsibility of the Contractor. If a NOV is issued or regulators are investigating a potential violation, the Contractor will assist Nellis in defending the investigation.
(i) Asbestos: The Contractor shall provide an asbestos demolition permit ten (10) days prior to the removal of any asbestos from any facility at NAFB or any other location specified in this contract. 99 CES/CEVC must be contacted and coordinate on any asbestos work.
(j) Spills: In addition to abating any hazardous substance spill occurring during the course of this contract, the Contractor shall:
During normal working hours, immediately report all spills > five (5) gallons to the 99 CES/CEV 652-4123.
After 4:30 p.m. or on weekends, immediately contact the Nellis Command Post at 652-2446.
Forward a written, completed spill report to the Contracting Office within 24 hours after the occurrence.
Report Forms can be obtained from 99 CES/CEV.
Abate the spill in accordance with all applicable Federal, State, local and Air Force regulations. All abatement costs incurred by the Contractor shall be the responsibility of the Contractor.
(k) Air Quality: The Contractor shall comply with Clark County Department of Air Quality and Environmental Management (DAQEM) regulations and obtain an Authority To Construct (ATC) for the installation of any emission units identified in the contract. The ATC shall be obtained prior to commencing work and coordinated through 99 CES/CEVC. The Contractor shall submit the application to 99 CES/CEVC for approval. When 99 CES/CEVC has approved the contractor’s application, 99 CES/CEVC shall submit the application for 99 ABW/CC signature . 99 CES/CEV shall then submit the application to the regulatory agency. The Contractor shall be responsible for providing additional information, as requested by the regulatory agency. The Contractor shall also be responsible for all fees associated with the application.
(l) Historical, Archeological, and Cultural Resources: The Contractor shall take precautions to preserve all existing historical, archeological, and cultural resources, as they exist immediately prior to project start. If, during the course of the project, the Contractor observes unusual items that might have historical or archeological value, such observations shall be reported, as soon as possible, to the Contracting Officer, who will contact the 99 CES/CEVN.
(m) Flora and Fauna: The Contractor shall perform all work and take such steps required to minimize interference with or disturbances to flora and fauna. The Contractor shall not alter water flows or otherwise disturb native habitat adjacent to the work area, which in the opinion of the Contracting Officer are critical to flora and fauna.
(n) Water Resources: The Contractor shall not pollute any stream, river, or waterway through direct discharge or by storm water runoff. The Contractor shall comply with all applicable Federal, State, local and Nellis AFB laws, regulations, codes and management plans.
(o) Recycling: Recycling efforts should take place whenever feasible. The contractor shall contact 99 CES/CEV about any recycling efforts.
(End of Clause)
Hazardous Materials Authorization Procedures for Contractors
Contractors using hazardous material (HAZMAT) on NAFB must comply with the authorizations procedures described below. (Reference AFI 32-7086, 2.5.5)
(a) Contractors must provide to the Nellis AFB Contracting office, as a submittal item, a list of proposed hazardous materials (HAZMAT), including Material Safety Data Sheets (MSDS) that it plans to use on the installation during the performance of the contract. The Contracting officer/administrator will then forward this information to the Quality Assurance (QA) evaluator or Inspector.
(b) This information will be forwarded to the HAZMART office (Building 811) by the Inspector. HAZMART office will review the information and determine which contractor-identified materials need to be tracked.
(c) For each contractor-identified HAZMAT that does not meet the Air Force definition of a HAZMAT, these requirements do not apply.
(d) For each contractor-identified HAZMAT that does meet the Air Force definition of a HAZMAT, the HAZMART office will notify the Inspector of the material requiring authorization and tracking. An AF‑EMIS worksheet (see below) will be completed and submitted as a submittal item to the Contracting Officer.
(e) The HAZMART office can assist the Contractor in completing the AF-EMIS worksheet if requested.
(f) The HAZMART office will enter the contractor supplied information into the HAZMAT tracking system to generate an AF Form 3952.
(g) The Contractor will be issued tracking labels (barcodes) to assist in tracking and reporting the material used during the performance of the contract. It is encouraged that the labels be affixed to the material. A Form 3952 will also be issued for the Contractors files. Copies of the AF Form 3952 must be kept on-site for the duration of the project. The contractor will be added to the authorized users list (AUL) by the HAZMART office.
(h) Contractor will be required to report to the Inspector on a monthly basis (by the 5th of the month) and at the end of the contract, within 10 working days after the completion of the project, the material used (see Contractor’s Monthly Hazmat Usage Report).
(i) QA or Inspector will forward this information to the HAZMART by the 10th of every month.
(j) HAZMART office will assist the QA, Inspector, and Contractor in any way possible and to answer any questions.
(k) Material brought on the installation, that was not originally identified by the contractor, must be authorized. MSDS and other related information, provided by the contractor, must be given to the HAZMART office.
(l) Hours of operation for the HAZMART are 0700 to 1600 hours Monday through Friday, Building 811. HAZMART phone numbers: 652-9856 or 652-4352
(m) Webpage: https://wwwmil.nellis.af.mil/units/99CES/environmental/hazmart&cap.htm
(n) HAZMAT DefinitionS: Any item or class of items covered in the Emergency Planning and Community Right-to-Know Act (EPCRA) tracking requirements, OSHA HAZCOM Standard, and all Class I, and Class II ODS (Ozone Depleting Substances). The following items are a few examples of type of products that may be required to be track in AF-EMIS:
Items with the flash-point of 141 degrees or below.
All paints, Lacquer, Enamels, and Thinners (Water-based, non-lead, non-polyurethane Latex paints are exempt from HAZMART tracking MSDS still required).
Adhesive, Sealants, Glues, some types of caulking.
Some Cleaning Supplies: Bleach, some types of glass cleaner, Drain cleaners, some floor waxes & stripers and others.
Pesticides, Insecticides, Herbicides, Fungicides. Usages of these products are to be used only if specifically specified in the contract, otherwise usage of these materials is not permitted on Nellis AFB. Usage must be reported to 99 CES/CEOUE, Building 1037. Phone number: 652-5613.
Compressed Gases.
Any type of material with a PH of 2 and below or 10.5 and above.
CONTRACTOR'S MONTHLY HAZMAT USAGE REPORT
Contractor:
AF-EMIS Shop Code:
Contract #:
Reporting Date:
The following information is required for tracking of Hazardous materials on Nellis AFB. This form is required to be filled out on a monthly basis and returned to the Government Representative (Inspector) by the 5th of the month. The Government Representative will provide a copy to the Hazmart office.
This information is required to comply with State, Federal and Air Force laws and regulations.
| Material |
| Manufacture |
| NSN# |
| Unit of Issue |
| Amount |
Name
| (can, bottle, tube) |
| Used |
| Contractor Representative: |
Date
Signature
| Government Representative: |
Date
Signature
AF-EMIS AUTHORIZATION REQUEST WORKSHEET
TYPE OF REQUEST:
END DATE:
(circle one)
LIMITED ONE-TIME RECURRING
(required for Limited & One-Time uses)
2. PROCESS CODE
SHOP INFORMATION
SHOP CODE:
SUPPLY ACCOUNT(S) (optional):
MATERIAL INFORMATION
NSN/LSN:
DRAW INFORMATION
DRAW AMOUNT:
DRAW FREQUENCY: (circle one) Greater than Yearly, Annually, Semi‑Annually, Quarterly, Monthly, Weekly, Daily, One‑Time Only
(AMOUNT ON HAND)
SOLE SOURCE INFORMATION
DOES THIS PROCESS INVOLVE A SOLE SOURCE REQUIREMENT? (circle one)
YES
NO
SOLE SOURCE MANUFACTURER NAME OR CAGE:
SOLE SOURCE PART NUMBER/TRADE NAME:
JUSTIFICATION/REQUIRING DOCUMENT
IS THERE A TECHNICAL ORDER OR OTHER DOCUMENT JUSTIFYING THE USE OF THE REQUESTED MATERIAL?
JUSTIFICATION
REQUIRING DOC
PAGE#
PARA
REVDATE
REV
WEAPON SYS
REMARKS
PROCESS INFORMATION
IS THIS REQUEST FOR A NEW WORKLOAD OR PROCESS IN THIS SHOP? (circle one)
IS THIS REQUEST FOR A NEW MATERIAL FOR THE SHOP? (circle one)
WILL THIS AUTHORIZATION REPLACE ANOTHER AUTHORIZATION (DIFFERENT PROCESS OR MATERIAL)?
IF YES, ENTER THE CONTROL ID FOR THE AUTHORIZATION BEING REPLACED:
REPLACE REASON: (optional)
AF-EMIS PROCESS CODE:
TASK INFORMATION
TASK DESCRIPTION (fully describe work activity and process in which this material is used):
DURATION OF TASK:
FREQUENCY OF TASK:
(i.e. 5 minutes, NO VARIANCES)
(i.e. 4 monthly, NO VARIANCES)
AMOUNT OF MATERIAL USED PER TASK:
(specify units if other then unit of issue)
(i.e. 2 bottles, 8 oz’s, NO VARIANCES)
APPLICATION METHOD: (circle only one)applicator, brush, cloth, dipping, hose, not applied, parts washer, Pouring, pressurized bottle, servicing unit, putty knife/spatula, spray, squeeze bottle, squeeze tube, vapor condenser
AF-EMIS AUTHORIZATION REQUEST WORKSHEET, continued
2. PROCESS CODE
PERSONNEL EXPOSURE
NUMBER OF PERSONNEL INVOLVED IN THIS TASK: (optional)
EXPOSURE TIME (in Seconds): (optional)
SHIFT TIME (If other than 8 hrs): (optional)
WOULD SKIN CONTACT OCCUR WITHOUT THE USE OF PPE? (circle one)
IF YES,WHERE WOULD SKIN CONTACT OCCUR WITHOUT PPE: (circle those that apply)
FACE
EYES
HANDS
TORSO
WHOLE BODY
PERSONAL PROTECTIVE EQUIPMENT (PPE)
WILL PERSONAL PROTECTIVE EQUIPMENT BE WORN DURING THIS PROCESS? (circle one)
RESPIRATOR
PPE TYPE
PPE
MANUFACTURER
MODEL
CARTRIDGE TYPE
TC #
BODY - FACE - FEET - HANDS
RESPIRATOR - TORSO - HEAD
LOCATION INFORMATION
WILL THE PROCESS BE PERFORMED IN: (check all that apply)
A FACILITY, AIRCRAFT, EQUIPMENT, MANHOLE OR OTHER STRUCTURE, OUTDOORS,
SMALL OR RESTRICTED SPACE, CONFINED SPACE
WILL THE PROCESS BE PERFORMED IN A LOCATION OTHER THE THAN SHOP? (circle one) YES NO
If yes, write a description of the Process Location (building number, etc.)
WHAT IS THE STORAGE LOCATION FOR UNUSED MATERIAL?
INDUSTRIAL EQUIPMENT:
WILL INDUSTRIAL EQUIPMENT BE USED?(circle one) YES NO
EQUIPMENT TYPE
EQUIPMENT NO
(optional)
TRANSFER METHOD
HANDLING INFORMATION
WILL THE MATERIAL BE MIXED WITH ANOTHER SUBSTANCE OR SUBSTANCES? (circle one) YES NO
MIXING METHOD: (circle only one)
Closed container mix, Hand, Impregnated, Open container, stirred, water/foam pump
WILL THE MATERIAL BE HEATED DURING THE PROCESS? (circle one) YES NO
HEATING METHOD:(circle one)
MIN WORKING TEMP
Heat Blanket, Oven, Soldering Iron, Torch
MAX WORKING TEMP
TEMP. UNITS ( °F/°C)
ABRASION METHOD: (sanded?) Not abraded, File, Grinder, Sander, Wire Brush
WILL THE MATERIAL BE PRESSURIZED DURING THE PROCESS? (circle one) YES NO
PRESSURIZATION METHOD:
MIN WORKING PRESS
MAX WORKING PRESS
PRESS. UNITS
ENGINEERING CONTROLS
ENGINEERING CONTROLS IN USE DURING THE PROCESS: (circle all that apply)
NONE, CANOPY HOOD, COOLING COIL, COVERED TANK, CROSS FLOW PAINT BOOTH, ENCLOSURES, EXHAUST VENTILATION SYSTEM, PAINT BOOTH, SEMI DOWN DRAFT PAINT BOOTH
WASTE GENERATED DURING PROCESS
DESCRIBE THE METHOD OF DISPOSAL FOR THE WASTE THAT IS GENERATED: (circle all that apply)
AIR EMISSION, BULK CONTAINER, CONSUMED IN USE, DRAINED TO INDUSTRIAL WASTE TREATMENT PLANT, DRAINED TO SANITARY SEWER, DRUMMED/CONTAINERIZED, RECYCLED ON SITE, RECYCLED OFF-SITE, REUSED, TRASH/MUNICIPAL WASTE, TURNED-IN TO 90 DAY SITE, TURNED-IN TO LHM
WASTE ACCUMULATION POINT: (optional)
WASTE NSN: (optional)
WASTE PROFILE: (optional)
END ITEM (If other than a weapon system: (optional)
REMARKS (provide any additional information):
REQUESTOR
CERTIFIER
REQUESTOR'S NAME:
CERTIFIER'S NAME:
I certify that the material will be used as stated above.
I certify that the material is required as stated above.
TITLE:
TITLE:
OFFICE/ORG SYMBOL:
OFFICE/ORG SYMBOL:
TELEPHONE #:
TELEPHONE #:
DATE:
DATE:
(End of clause)
H-105
SAFETY AND ACCIDENT PREVENTION
(a) General: Compliance with the current U.S. Army Corps of Engineers "Safety and Health Requirements Manual", EM 3835-1-1; Occupational Safety and Health Act (OSHA) Public Law 1910 and 1926; Air Force Occupational Safety and Health (AFOSH) standards, and current Nellis AFB safety regulations is mandatory. The prime Contractor shall be held responsible to insure that his/her workforce and any subcontractor or supplier workforce comply to the above safety requirements.
(b) Personnel Safety: Adequate protection of all persons shall be provided at all times. Work shall proceed in a manner to prevent hazard.
(c) Safety Briefings: Contractors operating on base will be responsible to brief and ensure their employees, subcontractors, and suppliers comply with all traffic rules and regulations as well as entry procedures.
(d) Nellis AFB Security Police: All instructions given by Security Police personnel will be complied with immediately.
(e) Equipment and Tools: Equipment to be used on the project shall be safe and in good operating condition. The Contracting Officer reserves the right to inspect any on-base equipment and reject such equipment if he considers it unsafe, in poor operating condition, or inappropriate for work.
(f) Explosive Operated Handtools: The Contractor shall comply with OSHA (Occupational Safety and Health Act) Standard 1910.215(c) when utilizing explosive operated handtools. Storage of explosive cartridges on the installation will be in metal containers and limited to one day’s supply. The Contractor will provide adequate controls to prevent loss/theft of cartridges used and stored on the installation.
(g) Electromagnetic Emission Devices: Electromagnetic emission devices (including but not limited to Radio/Radar Transmitters; Navigational Aids; Instrumentation’s; Signaling, Intrusion Detecting and Identification Devices; Mobile and Fixed Business Radio Communication Equipment; and MARS, CBs and Amateur Radio Stations) will be required to comply with the AFI 33-118, Electromagnetic Sprectum Management, dated 18 Jul 2005.
(h) Use of Radioactive Devices: Under no circumstances will an unlicensed radioactive device be used on Nellis Air Force Base. Prior to using a radioactive device (i.e., soil or asphalt density meter) on government property, the Contractor shall submit an application to the Contracting Officer for approval by the Base Radiation Protection Officer (99th Medical Group/SGPB). In accordance with Nellis AFB Instruction 48-101, the application shall be submitted thirty (30) to sixty (60) calendar days prior to the anticipated use and will consist of the following:
A copy of the appropriate NRC license or State Permit to operate/own the radioactive device.
A copy of the operator's qualifications and/or radiation safety training.
Radiation dosimetry results for the operator for the past calendar year.
A statement of the expected start date and the length of the contract per task order.
A statement of expected storage and security requirements or other peculiar needs of the Contractor.
Copies of the last two leak tests, if appropriate.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
H-106
FIRE PREVENTION AND PROTECTION
(a) Nellis AFB Fire Regulations: The Contractor shall comply strictly with the Base fire regulations and become thoroughly familiar with and brief employees and subcontractors on the fire safety requirements applicable to this contract.
(b) Welding Permit: No welding, cutting or open flame will be permitted without obtaining a Welding/Cutting/Burning Permit issued by the Base Fire Department. This permit shall be requested by the Contractor a minimum of one workday prior to required need. A permit must be obtained each time any welding, cutting, or open flame is required.
(c) Clean-Up: The Contractor shall at all times maintain good housekeeping practices to reduce the risk of fire damage. All scrap materials, rubbish, and trash shall be removed daily from in and about the site and shall not be permitted to be scattered on adjacent property.
(d) Fire Extinguishers: The Contractor shall provide fire extinguishers in accordance with the recommendations of the base fire regulations. Proper type fire extinguisher shall be available at each location where cutting and welding is being performed. Where electric or gas welding or cutting is done, interposed shields of incombustible material shall be used to protect against fire damage due to sparks and hot metal. No cutting, welding or open flame shall be allowed by the Contractor without first obtaining a permit from the Base Fire Department. Requests for permits must be requested a minimum of two (2) workdays prior to need.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
H-107
EMERGENCY MEDICAL TREATMENT
The Mike O’Callaghan Federal Hospital (MOFH) will provide emergency medical treatment to employees of the Contractor for injuries incurred while working at Nellis AFB NV. The Contractor will be required to reimburse the Government at an established rate for non-beneficiaries in accordance with DoD Regulation 6010.15.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .