Site Visit Q A.doc
DOC document 24 KB Posted
- Attached to
- Construct Hand Grenade Range
- Solicitation number
- FA4861-08-R-A028
About this file
Please review the attached answers to questions asked at the site visit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Q A | — | |
| FA4861-08-R-A028-01.doc | DOC document | |
| Site Visit Minutes | — | |
| NV080022_Heavy_Rev07.dot | DOT file | |
| Solicitation 08-R-A028.doc | DOC document | |
| TC 25-8 Ranges 2004.pdf | ||
| LayoutHandGrenadeTrainingRange.pdf | ||
| FM3-23.30 Hand Grenade.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q: “Grading is to begin at 18" below crown of road. However, we must know at what point from the road does the 18" cut begin. Is it at the ready wall location, which is 150' from edge of road, or the southern edge of the berms, which are 242' from edge road?”
A: The 18” cut will begin at the ready wall.
Q: “Should the berms follow the slope of the range or increase in height across the range to maintain a 0% slope?
A: The berm height shall be 6’ and follow the slope of the range (no increase to maintain level).
File details come from the government source that posted it. Updated .