Site Visit Q A.doc

DOC document 24 KB Posted

Attached to
Construct Hand Grenade Range
Solicitation number
FA4861-08-R-A028
Issued by

About this file

Please review the attached answers to questions asked at the site visit.

View the file

Other files

File Type Posted
Site Visit Q A —
FA4861-08-R-A028-01.doc DOC document
Site Visit Minutes —
NV080022_Heavy_Rev07.dot DOT file
Solicitation 08-R-A028.doc DOC document
TC 25-8 Ranges 2004.pdf PDF
LayoutHandGrenadeTrainingRange.pdf PDF
FM3-23.30 Hand Grenade.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q: “Grading is to begin at 18" below crown of road. However, we must know at what point from the road does the 18" cut begin. Is it at the ready wall location, which is 150' from edge of road, or the southern edge of the berms, which are 242' from edge road?”

A: The 18” cut will begin at the ready wall.

Q: “Should the berms follow the slope of the range or increase in height across the range to maintain a 0% slope?

A: The berm height shall be 6’ and follow the slope of the range (no increase to maintain level).

File details come from the government source that posted it. Updated .