Building 60 Site Visit Questions_answers.docx

DOCX document 20 KB Posted

Attached to
Building 60 Renovation Federal contract opportunity
Solicitation number
FA485521B0002
Issued by
Department of the Air Force Special Operations Command

About this file

This document contains questions and answers from a site visit for the Building 60 Renovation solicitation. The solicitation seeks offers to renovate Building 60 at the Department of the Air Force Special Operations Command. The questions and answers clarify that no network drops will be installed, restroom layouts will follow the plan, existing light fixtures will largely remain or be replaced in-kind, communications lines in the lobby can be removed, and the user will handle furniture removal and replacement to coordinate with the building renovation phasing.

View the file

Other files for this federal contract opportunity

Other files attached to Building 60 Renovation, newest first.
File Type Posted
Site Visit Sign-in Sheet.pdf PDF
Questions and Answers v2.docx DOCX document
Appendix A - Drawings Rev1.pdf PDF
Asbestos Survey_B60_30March21_Signed.pdf PDF
SOW 21-0005 Renovate B60 Rev. 1.docx DOCX document
1. Contractor Base Briefing Pamphlet (March 2016).pdf PDF
7. As-Built Submittal Guidelines-2014.pdf PDF
Attachment 3 SOMS CZQZ 21-0005 Renovate B60.pdf PDF
4. CAFB Hardware Specifications Guideline- 2011.pdf PDF
5. CAFB Labeling Standards 2011.pptx PPTX presentation
Appendix C - Specifications Renovate B60.pdf PDF
Attachment 2 Wage Determination.pdf PDF
3. CANNONAFBI32 201 Fire Protection-2012.pdf PDF
6. AEC CAD Standards 6.1 Aug 2019.pdf PDF
8. ANSI D (plan sizing).pdf PDF
2. AF Form 3064 Schedule.xlsx XLSX spreadsheet
3. AF Form 3065 Progress Report.xlsx XLSX spreadsheet
4. AF Form 103 Work Clearance Request.pdf PDF
Solicitation - FA485521B0002.pdf PDF
Attachment 1 SOW 21-0005 Renovate B60.pdf PDF
Appendix A - Drawings.pdf PDF
2. CAFB Architectural Compatibilty Guide-2013.pdf PDF
1. Draft DD1354 Renovate B60.pdf PDF
5. CAFB IMT Form 3624 Facilities Outage Request.pdf PDF
6. AF Form 3000 Submittal Cover Sheet.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 60 Site Visit Questions:

1. Asbestos report? (attached)

2. Are all materials listed in base standards?

Yes, however like material needs to be replaced with like. Example – the vinyl base in the building is a 6”, not a typical 4”. Use cove corners on outside corners.

3. Customer needs to identify where they want network drops installed. Please ensure it is annotated on the building layout. – Per user requests, no network drops will be installed or needed

4. Confirm restroom layout is to be done per plan. I.E. no toilet in men’s room at main entrance. The restroom layout is to be done per plan: Men’s RR 15 has one HC toilet stall and one urinal. Men’s RR 45 is two urinals.

5. Confirm our scope of work regarding existing light fixtures. To be repaired or left in place?

All existing light fixtures are to be left in place or put back in place after installation of the new ceiling. The exception is the light fixtures in the restrooms, and the surface mounted fixtures in the office next to the Women’s RR 17 that will be reduced due to the revised Women’s RR. In this office, replace the light fixtures as new 2x2 LED fixtures into the new ceiling grid.

6. Lobby room, clarify COMM lines replacing SIPR? Answer is NO – In lobby room square conduits are dead and can be removed.

7. Who is responsible for furniture removal and replacement?

The User will be responsible for furniture removal and replacement. Coordinate with User the building phasing in order to establish timelines for removing and replacing the furniture.

File details come from the government source that posted it. Updated .