Attachment 3 SOMS CZQZ 21-0005 Renovate B60.pdf
PDF 215 KB Posted
- Attached to
- Building 60 Renovation Federal contract opportunity
- Solicitation number
- FA485521B0002
About this file
This submittal register outlines the required submissions for a renovation project of Building 60 at an Air Force Special Operations Command facility. The contractor must provide submittals for a range of construction specifications, including safety plans, schedules, samples, shop drawings, test reports, certificates, manuals and closeout documents. Specifications cover demolition, hazardous materials abatement, structural work, interiors, mechanical and electrical systems. Sustainability requirements include recycled content, low-VOC and energy efficiency standards for many materials. The due date for the initial project schedule is two weeks after award. The government and its representatives will review all submissions, which must be approved before the contractor can procure or install the corresponding materials or equipment.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 20 PAGES
1098114
COURTHOUSE1
01 11 00 SD-01 Preconstruction Submittals
1.5 GSalvage Plan
01 14 00 SD-01 Preconstruction Submittals
Personnel List
01 30 00 SD-04 Samples
1.3 GColor Boards
01 32 01.00 10 SD-01 Preconstruction Submittals
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
1.16 GDive Operations Plan
SD-07 Certificates
1.6.1.5Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
1.7.2.4 GNaval Architecture Analysis
1.8Activity Hazard Analysis (AHA)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 20 PAGES
COURTHOUSE1
01 35 26 1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
1.14License Certificates
1.14.1 GRadiography Operation Planning
Work Sheet
1.14.1 GPortable Gauge Operations
Planning Worksheet
01 45 00.10 20 SD-01 Preconstruction Submittals
1.6 GQC Plan
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
1.6.1.4 GContractor Computer
Cybersecurity Compliance
Statements
1.6.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
SD-06 Test Reports
Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 20 PAGES
COURTHOUSE1
01 57 19 Preconstruction Survey
GEnvironmental Protection Plan
Management Overview
Environmental Manager
Qualifications
Employee Training Records
Asbestos Abatement
Lead Abatement
Regulatory Notifications and
Permits
Natural/Cultural Resources
Management Plan
Air Quality Management Plan
(Wind) Erosion Control Plan
Water Quality Management Plan
Erosion Control Plan
Notice of Intent to Discharge
Hazardous Materials
Management Plan
CAFB/MAFR Contractor
HAZMAT Worksheet
CAFB/MAFR Contractor Usage
Worksheet
POL Management Plan
CAFB/MAFR Contractor Fuel
Tank Approval Worksheet
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 20 PAGES
COURTHOUSE1
01 57 19 Spill Prevention and Control Plan
Waste Management Plan
CAFB/MAFR Contractor Solid
Waste Disposal, Diversion and Recycling Plan
Hazardous Waste Management, Storage,Transportation and Disposal Procedures
SD-06 Test Reports
GInspection Reports
GSolid Waste Management Report
GWaste Determination for all
Waste Streams
SD-07 Certificates
GContractor Certification
GEmployee Training Records
GCertificates of Competency
Erosion/Sediment Control
Inspector Qualifications
SD-11 Closeout Submittals
GRegulatory Notifications/Permits
GErosion Control Plan Compliance
Notebook
GStormwater Notice of Termination
Assembled Employee Training
Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 20 PAGES
COURTHOUSE1
01 57 19 GMonthly Hazardous Material
Usage Totals
GSolid Waste Management Report
GWaste Determination
Documentation
CAFB/MAFR Contractor Solid
Waste Disposal, Diversion, and Recycling Worksheet
Weigh Tickets/Bills of Lading for
Disposal Activities
(soil/waste/construction debris disposal, recycled material)
GDocumentation for Hazardous and Regulated Waste
Disposal
GHazardous Waste Manifests
GAs-built Topographic Survey
01 74 19 SD-01 Preconstruction Submittals
1.6 GConstruction Waste Management
Plan
SD-06 Test Reports
1.8.2Quarterly Reports
1.8.3Annual Report
SD-11 Closeout Submittals
1.9 SFinal Construction Waste
Diversion Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 20 PAGES
COURTHOUSE1
01 78 00 SD-03 Product Data
1.5.1Warranty Management Plan
1.5.4Warranty Tags
1.4Spare Parts Data
SD-08 Manufacturer’s Instructions
1.5.1Instructions
SD-10 Operation and Maintenance
Data
3.3 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
GRecord Model
1.5.1As-Built Record of Equipment and Materials
GCertification of EPA Designated
Items
2.1 GCertification Of USDA Designated
Items
01 78 23 SD-10 Operation and Maintenance
Data
1.3 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 20 PAGES
COURTHOUSE1
01 78 23 3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
02 42 51 SD-01 Preconstruction Submittals
1.4.2 GDust-Control Measures
1.4.2 GPacking and Transportation
Measures
1.4.4 GSchedule of Carpet Reclamation
Activities
1.4.3 GCarpet Reclamation Agency
Records
02 81 00 SD-03 Product Data
2.1.1Packaging Notifications
3.1 GHazardous Waste Management
Plan
3.2 GOnsite Hazardous Waste
Management
3.3Notices of Non-Compliance and
Notices of Violation
SD-06 Test Reports
3.7 GRecordkeeping
3.7 GException Report
3.8Spill Response
SD-07 Certificates
1.4.1 GTransportation and Disposal
Coordinator
1.4.2 GTraining
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 20 PAGES
COURTHOUSE1
02 81 00 1.4.3Certification
3.3.3 GShipping Documents and
Packagings Certification
3.3.4Security Plan
3.3.5Certificates of Disposal
3.6Waste Minimization
06 20 00 SD-02 Shop Drawings
1.3 GDetail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.1 GWood Products
2.2 GCountertops
GEngineered
1.4 GTreated Wood Products
GSoffits
GFascias and Trim
2.6 GHardware and Accessories
SD-04 Samples
1.5 GSamples
SD-07 Certificates
1.7.1.1 GCertificates of Grade
2.1.5 SIndoor Air Quality for Hardwood
Plywood
2.1.7 SIndoor Air Quality for MDF and
Particleboard
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 20 PAGES
COURTHOUSE1
06 20 00 2.7.1.2 SIndoor Air Quality for Non-aerosol
Adhesives
2.7.1.2 SIndoor Air Quality for Aerosol
Adhesives
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
SIndoor Air Quality For Interior
Floor Joint Sealants
SIndoor Air Quality For Interior
Acoustical Sealants
2.5 SIndoor Air Quality For Interior
Caulking
09 22 00 SD-02 Shop Drawings
2.1 GMetal Support Systems
SD-03 Product Data
2.1Metal Support Systems
2.1 SRecycled Content for Metal
Support Systems
09 23 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 20 PAGES
COURTHOUSE1
09 23 00 2.2Gypsum Base Coat Plaster
2.3Gypsum Finish Coat Plaster
SD-04 Samples
GSample Panel
GGypsum Plaster Full Size Sample
SD-08 Manufacturer’s Instructions
Ready-Mix Gypsum Plaster
09 23 82 SD-02 Shop Drawings
1.5.3Installation Drawings
SD-03 Product Data
1.5.1 GManufacturer's Catalog Data
SD-04 Samples
1.5.2Fireproofing Plaster Sample
1.5.5Mockups
SD-07 Certificates
1.5.4 GCertificates of Conformance
SD-08 Manufacturer’s Instructions
1.5.4 GManufacturer's Instructions
1.5.4Special Provisions
09 29 00 SD-03 Product Data
Cementitious Backer Units
2.1.4Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.3Water-Resistant Gypsum Backing
Board
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 20 PAGES
COURTHOUSE1
09 29 00 Glass Mat Covered or Reinforced
Gypsum Sheathing
Glass Mat Covered or Reinforced
Gypsum Sheathing Sealant
Abuse Resistant Gypsum Board
2.1.8Accessories
2.1.1Gypsum Board
2.1.1 SRecycled Content for Gypsum
Board
2.1.1 SRecycled Content for Paper
Facing and Gypsum Cores
SVOC Content of Joint Compound
SD-04 Samples
GPredecorated Gypsum Board
SD-07 Certificates
2.1 GAsbestos Free Materials
2.1.1 SIndoor Air Quality for Gypsum
Board
2.1.6 SIndoor Air Quality for Non-aerosol
Adhesives
2.1.6 SIndoor Air Quality for Aerosol
Adhesives
SD-08 Manufacturer’s Instructions
Safety Data Sheets
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 20 PAGES
COURTHOUSE1
09 29 00 Manufacturer Maintenance
Instructions
09 65 00 SD-02 Shop Drawings
2.8 GResilient Flooring and
Accessories
SD-03 Product Data
2.8 GResilient Flooring and
Accessories
2.4Adhesives
SD-04 Samples
2.8 GResilient Flooring and
Accessories
SD-06 Test Reports
3.3 GMoisture, Alkalinity and Bond
Tests
SD-07 Certificates
2.4 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SD-10 Operation and Maintenance
Data
2.8 GResilient Flooring and
Accessories
09 68 00 SD-02 Shop Drawings
3.4 GInstallation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 20 PAGES
COURTHOUSE1
09 68 00 SD-03 Product Data
2.1 GCarpet
GCarpet Cushion
2.1.1 SRecycled Content for Carpeting
SRecycled Content for Fiber
Cushion
SRecycled Content for Rubber
Cushion
SRecycled Content for
Polyurethane-Foam Cushion
2.4 GMoldings
2.3 SIndoor Air Quality for Aerosol
Adhesives
2.3 SIndoor Air Quality for Non-Aerosol
Adhesives
2.3 SIndoor Air Quality for Concrete
Primer
SD-04 Samples
2.1 GCarpet
2.4 GMoldings
GCarpet Cushion
SD-06 Test Reports
3.2 GMoisture and Alkalinity Tests
SD-07 Certificates
2.1.2 SIndoor Air Quality for Carpet
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 20 PAGES
COURTHOUSE1
09 68 00 SIndoor Air Quality for Fiber
Cushion
SIndoor Air Quality for Rubber
Cushion
SIndoor Air Quality for
Polyurethane-Foam Cushion
SD-08 Manufacturer’s Instructions
3.1Surface Preparation
SD-10 Operation and Maintenance
Data
3.5Cleaning and Protection
Maintenance Service
SD-11 Closeout Submittals
1.6Warranty
09 90 00 SD-02 Shop Drawings
3.8Piping Identification
SD-03 Product Data
2.1 GCoating
Sealant
SD-04 Samples
1.10 GColor
1.5.2 GTextured Wall Coating System
1.5.3 GSample Textured Wall Coating
System Mock-Up
SD-07 Certificates
1.4Applicator's Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 20 PAGES
COURTHOUSE1
09 90 00 1.5.1.2 GQualification Testing
2.1Indoor Air Quality for Paints and
Primers
Indoor Air Quality for
Consolidated Latex Paints
SD-08 Manufacturer’s Instructions
Application Instructions
3.4.2Mixing
1.8.2Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings
12 50 00.13 10 SD-01 Preconstruction Submittals
1.7.3 GStorage Location
SD-02 Shop Drawings
3.3.1 GInstallation Drawings
SD-03 Product Data
2.3 GProduct Data
2.3 GProduct Style Options
SD-04 Samples
2.3.3 GFabric and Finishes
SD-07 Certificates
1.6 GAuthorized Dealer
1.6 GCertified Furniture Installers
1.6 GLicensed Electrician
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 20 PAGES
COURTHOUSE1
12 50 00.13 10 1.6 GCertified Telecommunications
Installer
2.3 GManufacturer's Certification
1.8 GWarranty
SD-10 Operation and Maintenance
Data
3.5 GFurniture, Data Package 1
SD-11 Closeout Submittals
2.1.1 SEnergy Efficient Equipment
2.1.2 SReduced VOC's for Furniture
2.1.3 SRecycled Content of Furniture
2.1.4 SBio-Based Content of Furniture
22 00 00 SD-02 Shop Drawings
3.7.1 GPlumbing System
SD-03 Product Data
SRecycled Content for Steel Pipe
2.3Fixtures
2.3.2Flush Valve Water Closets
2.3.2 SWaterSense Label for Flush
Valve Water Closet
2.3.3Flush Valve Urinals
2.3.3 SWaterSense Label for Urinal
Flush Tank Water Closets
SWaterSense Label for Flush Tank
Water Closet
2.3.5Wall Hung Lavatories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 20 PAGES
COURTHOUSE1
22 00 00 2.3.6Countertop Lavatories
SWaterSense Label for Lavatory
Faucet
Kitchen Sinks
Service Sinks
GDrinking-Water Coolers
SEnergy Star Label for Electric
Water Cooler
SEnergy Star Label for Wheelchair
Electric Water Cooler
Plastic Bathtubs
Plastic Shower Stalls
SWaterSense Label for
Showerhead
Plastic Bathtub Liners
Plastic Bathtub Wall Surrounds
2.6 GWater Heaters
2.6.1.2 SEnergy Star Label for Gas
Storage Water Heater
2.6.2 SEnergy Star Label for Gas
Instantaneous Water Heater
2.8 GPumps
3.7.1.1 GBackflow Prevention Assemblies
GSwimming Pool Suction Fittings
GPool Water Pump Safety Vacuum
Release System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 20 PAGES
COURTHOUSE1
22 00 00 1.5.1Welding
GVibration-Absorbing Features
3.7.1Plumbing System
SD-06 Test Reports
3.7Tests, Flushing and Disinfection
3.7.1.1 GTest of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
2.1.1Bolts
SD-10 Operation and Maintenance
Data
3.7.1 GPlumbing System
26 05 00.00 40 SD-02 Shop Drawings
3.2.10.1 GMarking Strips
SD-03 Product Data
2.1.1 GConduits and Raceways
2.2.1 GWire and Cable
3.2.9 GSplices and Connectors
2.2.3 GSwitches
2.2.4 GReceptacles
2.1.2 GOutlet Boxes, Pull Boxes and
Junction Boxes
2.1.3.1 GCircuit Breakers
2.1.3 GPanelboards
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 20 PAGES
COURTHOUSE1
26 05 00.00 40 GDry-Type Distribution
Transformers
2.2.2 GDevice Plates
SD-06 Test Reports
3.6 GContinuity Test
3.6 GPhase-Rotation Tests
3.6 GInsulation Resistance Test
3.6 G600-Volt Wiring Test
3.6 GTransformer Tests
3.6 GGround-Fault Receptacle Test
3.6 GInsulation-Resistance Test
SD-08 Manufacturer’s Instructions
3.1Manufacturer's Instructions
26 20 00 SD-02 Shop Drawings
GPanelboards
GTransformers
GBusway
GCable Trays
GMotor Control Centers
GWireways
3.1.6.1 GMarking Strips
SD-03 Product Data
2.8 GReceptacles
GCircuit Breakers
2.7 GSwitches
GTransformers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 20 PAGES
COURTHOUSE1
26 20 00 2.9 GEnclosed Circuit Breakers
GMotor Controllers
GManual Motor Starters
GCATV Outlets
GGrounding Busbar
GSurge Protective Devices
SD-06 Test Reports
3.2.2 G600-volt Wiring Test
3.2.6 GGrounding System Test
3.2.3 GTransformer Tests
3.2.4 GGround-fault Receptacle Test
3.2.5 GArc-fault Receptacle Test
SD-07 Certificates
GFuses
SD-09 Manufacturer’s Field
Reports
2.13.1Transformer Factory Tests
SD-10 Operation and Maintenance
Data
1.5.1 GElectrical Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .