Appendix A - Drawings.pdf
PDF 3 MB Posted
- Attached to
- Building 60 Renovation Federal contract opportunity
- Solicitation number
- FA485521B0002
About this file
This document package includes drawings and scope of work details for the renovation of Building 60 at Cannon Air Force Base in New Mexico. The project involves renovations to bathrooms and the courthouse area, including partial demolition of existing walls, fixtures and finishes. New construction will provide updated bathrooms, including plumbing fixtures, partitions and fixtures compliant with ADA standards. In the courthouse area, improvements include new floor outlets, half walls and raised platforms. The scope also specifies replacement of ceiling tiles and carpet throughout the building. A site visit for interested contractors will be held on July 9th, 2021 at 1:00PM MDT to review the project requirements.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9957 Jaguar Court
A
D
Wyoming
Peach Loop
Knife Street
New Mexico Drive
Illinois Street
James F. Boatwright Drive f
Spirit Court
60/84
N orth P erim eter R oad
Marcus Place1404 oL
OFFBASE
OFFBASE
L
355 363
1202 1207
1807 1816
Term inal
8520 850
124 127
2314 2315
2313 2312
790 116
Rocket Road
4082 4087
4084 24084
75 72
494 495
2118 2112
2140 2139
1253 1251
342 343
Raven
215 227 r
Olds R oad
2209 2220
North Aderholt Loop
6624 6625
4605 74605
74610
84616
Curry Road 8
23201
2370 2372
South P
72438
E a s t
A d e r h o l t
L o o p s
M i m d o
W a y
C r a a
R a p t r
R a d
T h u n d e r b i a d c
C
S o u t h
A e r h o l
L o p
C h e r y o p r
A i r
N o r
C i n d i
B v d
N o
C
W e s t
A d e r h o l t
L o o p
C u r r y
R o a d
R
M i c h i g n u r t
R h o e
I s l a u r t
A p p o p
C h a r i o t
L o o p
F o r e s t
D r i v e
N m
E n g i n e e r s
W a y
W
S t r e e t
U N
N A
M E
D
C u r r y
R o a d
B o m b e r
L a n e
R o c k e t
R o a d l o r t v u
K e r m
E v a e n u e
W e
D g r e
E a g r e
W e u n n i n g h e n u e t
J u u y
W e c h r e n u e
E a c h r e n u e
C a r p e t b a g g u r t
S o u g g a d
W e i s e n u e
E a i s e n u e
W e i s e n u e
U r g e
F v d
W e b r i g e n u e
S o u
G n s h p a d
E a b r i g e n u e
A r n o e n u e
D a k o
S r e e t
W e v i t w e n u e
E a v i t e n u e
T h u r s d o p
K i n g p i
D e s e o r e e t
A n a c o n o p
S h a d u r t
R a n g u r t
R h i o p
B l a c k b i o p
B e a t o p
R p
S
C h a o p
C
S a f a o p r
I n v a d u r t
C o u r i u r t e d i b o p
N o r g v d
S o u g v d
S o u m m a n y
N o r m m a n y r
S o u i n d v d
N o r i n d v d
A v e n u e
L i b e r a t e n u e
C a tr o i
T u r b o p r p
J o u r t
V o
L i e n u e
R a t c h e t
L o o p
M o c c a s o p o i r
K e n t u c k y
C o u r t
C o n n e c t i c u t
C o u r t a
C o u r t a n
T a l o n
S t r e e t n a e s l r o e
M r u e o l
C s c
L e p u b l d e r a r b e r o r
O
S t t e o i
D r i v e zir t e e a m p
R f
L e w is T u rn e r
O v e rp a s s
L i i o t n t
P
R a u r a e t o p o o
A l a s k u r e l a w a r
P e n n s y l v a n u r t s c o n s i
W e s k t
I n d i a n a r
C o u t
C a l i
C u o o p o o p t n t
H a w a i i
C o u r t
B a n a n a
S t r e e t r m o e r t u
A r k a n s u r t w h t
S o t
N e b r
N
J r s e r r a n e k o i o u a
C o u r t
V u a r y l a n d
C o u r t
Y o r k m k f e e t y e t
N e
70 1
W e i s e n u e
S o u m m a n y
CANNON AIR FORCE BASE
NEW MEXICO
REPAIR_BLDG_60
CZQZ_21-0005
NTS
NTS
C O
V E
R
S
H E
E T
AutoCAD SHX Text WARNING: THIS DOCUMENT MAY CONTAIN SENSITIVE SECURITY INFORMATION AND THEREFORE MUST BE TREATED AS A CONFIDENTIAL DOCUMENT. THE INFORMATION CONTAINED IN THIS DOCUMENT MUST BE MAINTAINED IN A CONFIDENTIAL MANNER TO PREVENT COMPROMISING HOMELAND SECURITY AS PROVIDED IN SECTION 214 OF THE HOMELAND SECURITY ACT OF 2002. NO PART OF THIS DOCUMENT SHALL BE REPRODUCED, RELEASED OR DISTRIBUTED WITHOUT THE EXPRESS WRITTEN CONSENT OF 27 SOCES, CANNON AFB. UNAUTHORIZED REPRODUCTION, RELEASE OR DISTRIBUTION MAY RESULT IN FEDERAL OR CIVIL PENALTY OR OTHER ACTION BY CANNON AFB.
AutoCAD SHX Text Project Mgr./Engr.
AutoCAD SHX Text Using Organization
AutoCAD SHX Text Drawn By
AutoCAD SHX Text
MARK
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
REVIEWED BY:
AutoCAD SHX Text
DRAWING NUMBER:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
FILE NAME:
AutoCAD SHX Text
PLOT DATE:
AutoCAD SHX Text
PLOT SCALE:
AutoCAD SHX Text DEPARTMENT OF THE AIR FORCE SPECIAL OPERATIONS COMMAND CANNON AFB, NM CHIEF ENGINEER OFFICE
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
SHEET: OF
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
P-DATE
AutoCAD SHX Text
F-NAME
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
MGR/ENGR
AutoCAD SHX Text
ORG
AutoCAD SHX Text
D-NUMBER
AutoCAD SHX Text
CZQZ_21-0005
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DRAFTSMAN
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SOW-1
AutoCAD SHX Text
USING AGENCY:
AutoCAD SHX Text
CONTRACTING:
AutoCAD SHX Text
OPERATIONS FLIGHT CHIEF:
AutoCAD SHX Text
FIRE PROTECTION FLIGHT CHIEF:
AutoCAD SHX Text
GROUND SAFETY:
AutoCAD SHX Text
CONSTRUCTION MANAGEMENT CHIEF:
AutoCAD SHX Text
PROGRAMS FLIGHT CHIEF:
AutoCAD SHX Text
BASE CIVIL ENGINEER:
AutoCAD SHX Text
USER
AutoCAD SHX Text
CONTRACTING
AutoCAD SHX Text
OPS
AutoCAD SHX Text
FIRE
AutoCAD SHX Text
SAFETY
AutoCAD SHX Text
CM
AutoCAD SHX Text
PROGRAMS
AutoCAD SHX Text
BCE
AutoCAD SHX Text
APPROVALS
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
EXISTING FLOOR PLAN1
2ND FLOOR LAW LIBRARY1A
COURT
ROOM
STORAGE
WOMENS
RR
MENS RRFOYER
LAW LIBRARY
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
OFFICE
BREAK
ROOM
OFFICEOFFICEOFFICEOFFICE
BOILER
ROOM
STOR.
OFFICE
OFFICE
OFFICE
OFFICEOFFICE
OFFICE
OFFICE
OFFICE
OFFICE
LOBBY
WOMENS
RR
MENS RR
IT
CLOSET
MECH
ROOM
FOYER
KITCHEN
OFFICE
OFFICE
CLOSET
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
FOYER
OFFICE
EXIT
EXIT
EXIT
E X
I T
EXIT
EXIT
EXIT
STORAGE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
U P
DN
531.81 SF
NTS
OFFICEWOMENS RRMENS RR
IT CLOSET
WOMEN'S
MEN'S
NEW OUTLET
NEW WATER FOUNTAIN
WOMENS RR
MENS RR
MEN'S WOMEN'S
JAN.
SCOPE OF WORK : RENOVATE BATHROOMS
NTS
PN
TN
NTS
EXISTING BATHROOM LAYOUT
NTS
PROPOSED BATHROOM LAYOUT
NTS
PROPOSED BATHROOM LAYOUT
NTS
EXISTING BATHROOM LAYOUT
PROPOSED LAYOUTS SHOWN FOR RESTROOMS IS A REASONABLE
FACSIMILE OF THE LAYOUT ANTICIPATED. THIS IS NOT INDICATIVE OF
THE CONTRACTOR'S FINAL DESIGN TO BE SUBMITTED, PENDING
APPLICABLE IBC AND ADA GUIDELINES.
S O
W
B
A T
H R
O O
M
S
K E
T C
H
AutoCAD SHX Text Project Mgr./Engr.
AutoCAD SHX Text Using Organization
AutoCAD SHX Text Drawn By
AutoCAD SHX Text Approved By
AutoCAD SHX Text
MARK
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
REVIEWED BY:
AutoCAD SHX Text
DRAWING NUMBER:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
FILE NAME:
AutoCAD SHX Text
PLOT DATE:
AutoCAD SHX Text
PLOT SCALE:
AutoCAD SHX Text DEPARTMENT OF THE AIR FORCE SPECIAL OPERATIONS COMMAND CANNON AFB, NM CHIEF ENGINEER OFFICE
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
SHEET: OF
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
P-DATE
AutoCAD SHX Text
F-NAME
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
MGR/ENGR
AutoCAD SHX Text
ORG
AutoCAD SHX Text
D-NUMBER
AutoCAD SHX Text
CZQZ_21-0005
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DRAFTSMAN
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SOW-2
WARNING: THIS DOCUMENT MAY CONTAIN SENSITIVE SECURITY INFORMATION AND THEREFORE MUST BE TREATED AS A CONFIDENTIAL DOCUMENT. THE INFORMATION CONTAINED IN THIS DOCUMENT MUST BE MAINTAINED IN A CONFIDENTIAL MANNER TO PREVENT COMPROMISING HOMELAND SECURITY AS PROVIDED IN SECTION 214 OF THE HOMELAND SECURITY ACT OF 2002. NO PART OF THIS DOCUMENT SHALL BE REPRODUCED, RELEASED OR DISTRIBUTED WITHOUT THE EXPRESS WRITTEN CONSENT OF 27 SOCES, CANNON AFB. UNAUTHORIZED REPRODUCTION, RELEASE OR DISTRIBUTION MAY RESULT IN FEDERAL OR CIVIL PENALTY OR OTHER ACTION BY CANNON AFB.
U P
DN
COURT ROOM
TV-NIC (ABOVE)
TV-NIC (ABOVE)
NEW FLOOR OUTLET
NEW FLOOR OUTLET
NEW OUTLET
NEW OUTLET
NEW OUTLET
NEW OUTLET
NEW OUTLET
NEW OUTLET
NEW OUTLET
NEW WITNESS STAND
SCOPE OF WORK : COURTROOM RENOVATION
NTS
NTS
PN
TN
NTS
EXISTING COURTROOM LAYOUT
NTS
PROPOSED COURTROOM LAYOUT
PROPOSED LAYOUT SHOWN FOR COURTROOM IS INDICATIVE ONLY OF
THE PROPOSED LAYOUT THE END USER WOULD LIKE TO EMULATE.
THIS DESIGN IS NOT A DIRECTIVE TO THE CONTRACTOR OF FINAL
DESIGN.
S O
W
C
O U
R T
R O
O M
K E
T C
H
AutoCAD SHX Text Project Mgr./Engr.
AutoCAD SHX Text Using Organization
AutoCAD SHX Text Drawn By
AutoCAD SHX Text Approved By
AutoCAD SHX Text
MARK
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
REVIEWED BY:
AutoCAD SHX Text
DRAWING NUMBER:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
FILE NAME:
AutoCAD SHX Text
PLOT DATE:
AutoCAD SHX Text
PLOT SCALE:
AutoCAD SHX Text DEPARTMENT OF THE AIR FORCE SPECIAL OPERATIONS COMMAND CANNON AFB, NM CHIEF ENGINEER OFFICE
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
SHEET: OF
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
P-DATE
AutoCAD SHX Text
F-NAME
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
MGR/ENGR
AutoCAD SHX Text
ORG
AutoCAD SHX Text
D-NUMBER
AutoCAD SHX Text
CZQZ_21-0005
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DRAFTSMAN
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SOW-3
WARNING: THIS DOCUMENT MAY CONTAIN SENSITIVE SECURITY INFORMATION AND THEREFORE MUST BE TREATED AS A CONFIDENTIAL DOCUMENT. THE INFORMATION CONTAINED IN THIS DOCUMENT MUST BE MAINTAINED IN A CONFIDENTIAL MANNER TO PREVENT COMPROMISING HOMELAND SECURITY AS PROVIDED IN SECTION 214 OF THE HOMELAND SECURITY ACT OF 2002. NO PART OF THIS DOCUMENT SHALL BE REPRODUCED, RELEASED OR DISTRIBUTED WITHOUT THE EXPRESS WRITTEN CONSENT OF 27 SOCES, CANNON AFB. UNAUTHORIZED REPRODUCTION, RELEASE OR DISTRIBUTION MAY RESULT IN FEDERAL OR CIVIL PENALTY OR OTHER ACTION BY CANNON AFB.
LOBBY
MECH ROOM
FOYER
KITCHEN
OFFICE
OFFICE
EXIT
CORRIDOR
OFFICE
WOMEN'S RR
MEN'S RR
MOP CLOSET
7'-9
7'-7
" 7'-7
3'-11
16'-0"
3'-11
3'-2
OFFICE
OFFICE
OFFICE
COURT ROOM
STORAGE
WOMENS RR
MENS RR
FOYER
EXIT
U P
36'-1"
12'-2
8'-8
3'-2
10'-5
2'-6"
10'-9
9"
4'-6"
9"
3'-6"
..\..\..\..\..\..\Base Architect\BASE ARCHITECT\NBA-Megan DO NOT ALTER\27th_SOW.JPG
SCOPE OF WORK : PARTIAL DEMOLITION PLANS - RESTROOMS AND COURTROOM
PN
TN
SCALE: 1/4" = 1'-0"
PARTIAL DEMOLITION PLAN
PROPOSED LAYOUTS SHOWN FOR RESTROOMS IS A REASONABLE
FACSIMILE OF THE LAYOUT ANTICIPATED. THIS IS NOT INDICATIVE OF
THE CONTRACTOR'S FINAL DESIGN TO BE SUBMITTED, PENDING
APPLICABLE IBC AND ADA GUIDELINES.
SCALE: 1/4" = 1'-0"
PARTIAL DEMOLITION PLAN
S O
W
P
A R
T I A
L
D
E M
O L
I T
I O
N
P L
A N
S
F
T
H R
O O
M
A
N D
C O
U R
T R
O O
M
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text GENERAL NOTES: 1. ALL DIMENSIONS TO BE FIELD VERIFIED. ALL DIMENSIONS TO BE FIELD VERIFIED. 2. VERIFY ALL ADA CLEARANCES/TOLERANCES ARE MET IN NEW VERIFY ALL ADA CLEARANCES/TOLERANCES ARE MET IN NEW CONSTRUCTION WITH ACCORDANCE TO CURRENT CODE. 3. CONTRACTOR TO ADHERE TO ALL CURRENT LOCAL, STATE, AND FEDERAL CONTRACTOR TO ADHERE TO ALL CURRENT LOCAL, STATE, AND FEDERAL CODES. 4. PRIOR TO CLOSING IN ALL WALLS/FLOORS/CEILINGS; COORDINATE WITH PRIOR TO CLOSING IN ALL WALLS/FLOORS/CEILINGS; COORDINATE WITH COMM, BASE ARCHITECT, AND USER FOR FINAL LOCATION OF CAT 6 CABLES AND FUTURE AUDIO-VISUAL EQUIPMENT INFRASTRUCTURE TO BE INSTALLED. 5. PRIOR TO DEMOLITION OF RAISED PLATFORMS IN COURTROOM, VERIFY PRIOR TO DEMOLITION OF RAISED PLATFORMS IN COURTROOM, VERIFY LOCATION/SCOPE WITH THE USER AND BASE ARCHITECT 6. CONTRACTOR TO PHASE WORK TO ALLOW USER TO CONTINUE WORKING IN CONTRACTOR TO PHASE WORK TO ALLOW USER TO CONTINUE WORKING IN BUILDING. COORDINATE WITH USER AND BASE ARCHITECT THE MOVING PHASES OF THE FLOORS AND CEILING PORTION OF THIS PROJECT. 7. CONTRACTOR TO ENSURE ALL AIR FILTERS ARE IMMEDIATELY CHANGED CONTRACTOR TO ENSURE ALL AIR FILTERS ARE IMMEDIATELY CHANGED UPON COMPLETION OF THIS PROJECT. 8. CONTRACTOR TO COORDINATE MULTIPLE ITEMS WITH USER AND BASE CONTRACTOR TO COORDINATE MULTIPLE ITEMS WITH USER AND BASE ARCHITECT PRIOR TO INSTALLATION/CONSTRUCTION AS NOTED ON THESE DRAWINGS. ANY WORK PERFORMED WITHOUT DIRECTED COORDINATION MAY BE REMOVED AND REPLACED AT THE CONTRACTOR'S EXPENSE. 9. PARTIAL PLANS SHOWN FOR DEMOLITION AND NEW CONSTRUCTION ARE PARTIAL PLANS SHOWN FOR DEMOLITION AND NEW CONSTRUCTION ARE SPECIFIC ONLY TO THE RENOVATION TO THE RESTROOMS AND THE COURTROOM. ALL OTHER SCOPE OF WORK ITEMS; IE. THE CARPET DEMOLITION AND RENOVATION, AND CEILING DEMOLITION AND RENOVATION ARE GENERALLY ADDRESSED IN THE SCOPE OF WORK AND IN THE DRAWING SKETCHES, NOT SPECIFICALLY ADDRESSED IN DETAILED DRAWINGS. CONTRACTOR SHOULD ADDRESS ANY SPECIFIC QUESTIONS TO THESE AREAS PRIOR TO BIDDING.
AutoCAD SHX Text DEMO NOTES: DEMO EXISTING WALL. DEMO EXISTING PLUMBING FIXTURES. (TOILET/SINK/URINAL/WATER FOUNTAIN) DEMO EXISTING TOILET PARTITIONS DEMO EXISTING CEILING DEMO EXISTING LIGHTS DEMO EXISTING SUPPLY AND RETURN GRILLES DEMO EXISTING DOORS REMOVE AND REPLACE EXISTING MOP SINK REMOVE EXISTING HALF WALL AS NOTED REMOVE EXISTING PLATFORM IN COURTROOM. COORDINATE EXACT LOCATION WITH BASE ARCHITECT PRIOR TO DEMOLITION REMOVE BEAD-BOARD/FACE PANELS OF EXISTING HALF WALLS THROUGHOUT COURTROOM. REPAIR ANY EXISTING DAMAGE TO WALLS PRIOR TO CLOSING BACK UP. REMOVE EXISTING TWO-WAY MIRROR. PRIOR TO DEMOLITION COORDINATE EXACT LOCATION WITH USER AND BASE ARCHITECT. REMOVE EXISTING CARPET/FLOORING. PATCH/REPAIR/LEVEL EXISTING SUB-FLOORING AS REQUIRED TO INSTALL NEW CARPET/FLOORING. REMOVE EXISTING WOOD CHAIR RAIL AND STORE ONSITE IN A CONDITIONED SPACE FOR RE-USE DURING CONSTRUCTION PHASE.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Project Mgr./Engr.
AutoCAD SHX Text Using Organization
AutoCAD SHX Text Drawn By
AutoCAD SHX Text Approved By
AutoCAD SHX Text
MARK
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
REVIEWED BY:
AutoCAD SHX Text
DRAWING NUMBER:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
FILE NAME:
AutoCAD SHX Text
PLOT DATE:
AutoCAD SHX Text
PLOT SCALE:
AutoCAD SHX Text DEPARTMENT OF THE AIR FORCE SPECIAL OPERATIONS COMMAND CANNON AFB, NM CHIEF ENGINEER OFFICE
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
SHEET: OF
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
P-DATE
AutoCAD SHX Text
F-NAME
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
MGR/ENGR
AutoCAD SHX Text
ORG
AutoCAD SHX Text
D-NUMBER
AutoCAD SHX Text
CZQZ_21-0005
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DRAFTSMAN
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SOW-4
WARNING: THIS DOCUMENT MAY CONTAIN SENSITIVE SECURITY INFORMATION AND THEREFORE MUST BE TREATED AS A CONFIDENTIAL DOCUMENT. THE INFORMATION CONTAINED IN THIS DOCUMENT MUST BE MAINTAINED IN A CONFIDENTIAL MANNER TO PREVENT COMPROMISING HOMELAND SECURITY AS PROVIDED IN SECTION 214 OF THE HOMELAND SECURITY ACT OF 2002. NO PART OF THIS DOCUMENT SHALL BE REPRODUCED, RELEASED OR DISTRIBUTED WITHOUT THE EXPRESS WRITTEN CONSENT OF 27 SOCES, CANNON AFB. UNAUTHORIZED REPRODUCTION, RELEASE OR DISTRIBUTION MAY RESULT IN FEDERAL OR CIVIL PENALTY OR OTHER ACTION BY CANNON AFB.
9'-3"
9'-1
H
O L D
3'-1"
2'-0
1'-9"
4"
3'-0" 2'-6" 6'-2"
H
O L D
3'-0"
19'-1
5'-0"
" 3
3'-6"
1'-0"
MIN 3'-6"
1'-0"
MIN
M
I N
M
I N
7'-1
WOMEN'S RR
MEN'S RR
MOP CLOSET
U P
4'-6"
3'-8
3'-5
2'-6"
3'-0"
2'-6"
1'-3" 1'-3"
9'-0"
4'-3"6'-0"
1'-9"
M A
X
2'-6"2'-6"
1'-0"
MAX
3'-6" MIN
1'-10"
1'-8"
N
COURT ROOM
UNISEX RR
MEN'S RR
..\..\..\..\..\..\Base Architect\BASE ARCHITECT\NBA-Megan DO NOT ALTER\27th_SOW.JPG
SCOPE OF WORK : NEW CONSTRUCTION PLAN
PN
TN
SCALE: 1/4" = 1'-0"
PARTIAL NEW CONSTRUCTION PLAN
PROPOSED LAYOUTS SHOWN FOR RESTROOMS IS A REASONABLE
FACSIMILE OF THE LAYOUT ANTICIPATED. THIS IS NOT INDICATIVE OF
THE CONTRACTOR'S FINAL DESIGN TO BE SUBMITTED, PENDING
APPLICABLE IBC AND ADA GUIDELINES.
SCALE: 1/4" = 1'-0"
PARTIAL NEW CONSTRUCTION PLAN
S O
W
N
N
S T
R U
C T
I O
N
T
H R
O O
D
C O
U R
T R
O O
M
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text GENERAL NOTES: 1. ALL DIMENSIONS TO BE FIELD VERIFIED. ALL DIMENSIONS TO BE FIELD VERIFIED. 2. VERIFY ALL ADA CLEARANCES/TOLERANCES ARE MET IN NEW VERIFY ALL ADA CLEARANCES/TOLERANCES ARE MET IN NEW CONSTRUCTION WITH ACCORDANCE TO CURRENT CODE. 3. CONTRACTOR TO ADHERE TO ALL CURRENT LOCAL, STATE, AND FEDERAL CONTRACTOR TO ADHERE TO ALL CURRENT LOCAL, STATE, AND FEDERAL CODES. 4. PRIOR TO CLOSING IN ALL WALLS/FLOORS/CEILINGS; COORDINATE WITH PRIOR TO CLOSING IN ALL WALLS/FLOORS/CEILINGS; COORDINATE WITH COMM, BASE ARCHITECT, AND USER FOR FINAL LOCATION OF CAT 6 CABLES AND FUTURE AUDIO-VISUAL EQUIPMENT INFRASTRUCTURE TO BE INSTALLED. 5. PRIOR TO DEMOLITION OF RAISED PLATFORMS IN COURTROOM, VERIFY PRIOR TO DEMOLITION OF RAISED PLATFORMS IN COURTROOM, VERIFY LOCATION/SCOPE WITH THE USER AND BASE ARCHITECT 6. CONTRACTOR TO PHASE WORK TO ALLOW USER TO CONTINUE WORKING IN CONTRACTOR TO PHASE WORK TO ALLOW USER TO CONTINUE WORKING IN BUILDING. COORDINATE WITH USER AND BASE ARCHITECT THE MOVING PHASES OF THE FLOORS AND CEILING PORTION OF THIS PROJECT. 7. CONTRACTOR TO ENSURE ALL AIR FILTERS ARE IMMEDIATELY CHANGED CONTRACTOR TO ENSURE ALL AIR FILTERS ARE IMMEDIATELY CHANGED UPON COMPLETION OF THIS PROJECT. 8. CONTRACTOR TO COORDINATE MULTIPLE ITEMS WITH USER AND BASE CONTRACTOR TO COORDINATE MULTIPLE ITEMS WITH USER AND BASE ARCHITECT PRIOR TO INSTALLATION/CONSTRUCTION AS NOTED ON THESE DRAWINGS. ANY WORK PERFORMED WITHOUT DIRECTED COORDINATION MAY BE REMOVED AND REPLACED AT THE CONTRACTOR'S EXPENSE. 9. PARTIAL PLANS SHOWN FOR DEMOLITION AND NEW CONSTRUCTION ARE PARTIAL PLANS SHOWN FOR DEMOLITION AND NEW CONSTRUCTION ARE SPECIFIC ONLY TO THE RENOVATION TO THE RESTROOMS AND THE COURTROOM. ALL OTHER SCOPE OF WORK ITEMS; IE. THE CARPET DEMOLITION AND RENOVATION, AND CEILING DEMOLITION AND RENOVATION ARE GENERALLY ADDRESSED IN THE SCOPE OF WORK AND IN THE DRAWING SKETCHES, NOT SPECIFICALLY ADDRESSED IN DETAILED DRAWINGS. CONTRACTOR SHOULD ADDRESS ANY SPECIFIC QUESTIONS TO THESE AREAS PRIOR TO BIDDING.
AutoCAD SHX Text NEW CONSTRUCTION NOTES: CONSTRUCT NEW WALL CONSTRUCT NEW PLUMBING WALL INSTALL NEW PLUMBING FIXTURES (TOILET/SINK/URINAL/WATER FOUNTAIN) INSTALL NEW ADA FIXTURES (GRAB BARS ETC). FOLLOW CURRENT ADA GUIDELINES. INSTALL NEW DOORS INSTALL NEW TOILET PARTITIONS APPLY OPAQUE FILM TO EXISTING WINDOW. APPLY FILM ON INTERIOR SIDE OF BUILDING. NEW HALF WALL CONSTRUCTION. MATCH EXISTING CONSTRUCTION IN HEIGHT AND SURFACE. CREATE NEW HALF WALL CONSTRUCTION TO PROVIDE A NEW WITNESS STAND. MATCH EXISTING CONSTRUCTION IN HEIGHT AND SURFACE. INSTALL BLOCKING ON COURTROOM WALLS FOR USER TO HANG FUTURE TVS/SCREENS. COORDINATE LOCATIONS WITH USER AND BASE ARCHITECT PRIOR TO INSTALLATION. INSTALL NEW ELECTRICAL OUTLETS. COORDINATE LOCATIONS WITH USER AND BASE ARCHITECT PRIOR TO INSTALLATION. INSTALL NEW FACE PANELS ON ALL HALF WALL CONSTRUCTION IN COURTROOM. COORDINATE FINISH WITH USER AND BASE ARCHITECT PRIOR TO ORDERING MATERIALS AND INSTALLING. PROVIDE NEW RAISED PLATFORM AREAS AT RAISED JURY BOX. COORDINATE LOCATIONS WITH USER AND BASE ARCHITECT PRIOR TO INSTALLATION. INFILL WITH NEW STUDS, INSULATION, AND DRYWALL TO MATCH EXISTING WALL. PAINT TO MATCH EXISTING WALL. INSTALL NEW LED LIGHT FIXTURES AND NEW SUPPLY AND RETURN GRILLES. INSTALL NEW CEILING PER CAFB ARCHITECTURAL COMPATIBILITY GUIDE AND SPECIFICATIONS. INSTALL NEW CARPET/FLOORING AND BASE PER CAFB ARCHITECTURAL COMPATIBILITY GUIDE AND SPECIFICATIONS. COORDINATE COLOR SELECTION WITH USER AND BASE ARCHITECT. INSTALL NEW " GYPSUM BOARD OVER EXISTING BURLAP WALL, TAPE AND FLOAT. 38" GYPSUM BOARD OVER EXISTING BURLAP WALL, TAPE AND FLOAT. RE-INSTALL WOOD CHAIR RAIL ON WALL IN ORIGINAL LOCATION. REPAINT ALL WALLS IN THE COURTROOM WITH A LEVEL 4 FINISH PER CAFB ARCHITECTURAL COMPATIBILITY GUIDE AND SPECIFICATIONS. COORDINATE COLOR SELECTION WITH USER AND BASE ARCHITECT.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FUTURE TV
AutoCAD SHX Text
FUTURE TV
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Project Mgr./Engr.
AutoCAD SHX Text Using Organization
AutoCAD SHX Text Drawn By
AutoCAD SHX Text Approved By
AutoCAD SHX Text
MARK
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
REVIEWED BY:
AutoCAD SHX Text
DRAWING NUMBER:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
FILE NAME:
AutoCAD SHX Text
PLOT DATE:
AutoCAD SHX Text
PLOT SCALE:
AutoCAD SHX Text DEPARTMENT OF THE AIR FORCE SPECIAL OPERATIONS COMMAND CANNON AFB, NM CHIEF ENGINEER OFFICE
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
SHEET: OF
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
P-DATE
AutoCAD SHX Text
F-NAME
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
MGR/ENGR
AutoCAD SHX Text
ORG
AutoCAD SHX Text
D-NUMBER
AutoCAD SHX Text
CZQZ_21-0005
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DRAFTSMAN
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SOW-5
WARNING: THIS DOCUMENT MAY CONTAIN SENSITIVE SECURITY INFORMATION AND THEREFORE MUST BE TREATED AS A CONFIDENTIAL DOCUMENT. THE INFORMATION CONTAINED IN THIS DOCUMENT MUST BE MAINTAINED IN A CONFIDENTIAL MANNER TO PREVENT COMPROMISING HOMELAND SECURITY AS PROVIDED IN SECTION 214 OF THE HOMELAND SECURITY ACT OF 2002. NO PART OF THIS DOCUMENT SHALL BE REPRODUCED, RELEASED OR DISTRIBUTED WITHOUT THE EXPRESS WRITTEN CONSENT OF 27 SOCES, CANNON AFB. UNAUTHORIZED REPRODUCTION, RELEASE OR DISTRIBUTION MAY RESULT IN FEDERAL OR CIVIL PENALTY OR OTHER ACTION BY CANNON AFB.
U P
DN
SCOPE OF WORK : REPLACE CEILING TILES AND CARPET
NTS
NTS
PN
TN
S O
W
R
E P
L A
I L
I N
G
T I L
R
P E
T
AutoCAD SHX Text Project Mgr./Engr.
AutoCAD SHX Text Using Organization
AutoCAD SHX Text Drawn By
AutoCAD SHX Text Approved By
AutoCAD SHX Text
MARK
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
REVIEWED BY:
AutoCAD SHX Text
DRAWING NUMBER:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
FILE NAME:
AutoCAD SHX Text
PLOT DATE:
AutoCAD SHX Text
PLOT SCALE:
AutoCAD SHX Text DEPARTMENT OF THE AIR FORCE SPECIAL OPERATIONS COMMAND CANNON AFB, NM CHIEF ENGINEER OFFICE
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
SHEET: OF
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
P-DATE
AutoCAD SHX Text
F-NAME
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
MGR/ENGR
AutoCAD SHX Text
ORG
AutoCAD SHX Text
D-NUMBER
AutoCAD SHX Text
CZQZ_21-0005
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DRAFTSMAN
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SOW-6
WARNING: THIS DOCUMENT MAY CONTAIN SENSITIVE SECURITY INFORMATION AND THEREFORE MUST BE TREATED AS A CONFIDENTIAL DOCUMENT. THE INFORMATION CONTAINED IN THIS DOCUMENT MUST BE MAINTAINED IN A CONFIDENTIAL MANNER TO PREVENT COMPROMISING HOMELAND SECURITY AS PROVIDED IN SECTION 214 OF THE HOMELAND SECURITY ACT OF 2002. NO PART OF THIS DOCUMENT SHALL BE REPRODUCED, RELEASED OR DISTRIBUTED WITHOUT THE EXPRESS WRITTEN CONSENT OF 27 SOCES, CANNON AFB. UNAUTHORIZED REPRODUCTION, RELEASE OR DISTRIBUTION MAY RESULT IN FEDERAL OR CIVIL PENALTY OR OTHER ACTION BY CANNON AFB.
| SOW BLDG 60-Cover Sheet |
| Sheets and Views |
| D-Size Cover Sheet |
| SOW BLDG 60-BATHROOMS |
| Sheets and Views |
| BATHROOMS |
| SOW BLDG 60-COURTHOUSE |
| Sheets and Views |
| COURTHOUSE |
| SOW BLDG 60-DEMOLITION |
| Sheets and Views |
| DEMOLITION |
| SOW BLDG 60-NEW CONSTRUCTION |
| Sheets and Views |
| NEW CONSTRUCTION |
| SOW BLDG 60-ENTIRE BUILDING |
| Sheets and Views |
| ENTIRE BUILDING |
File details come from the government source that posted it. Updated .