CEMIRT RFI Answers.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Restore CEMIRT Parking Area Federal contract opportunity
Solicitation number
FA481921R0023
Issued by
Department of the Air Force Air Combat Command

About this file

This document outlines a federal contract opportunity for the restoration of a CEMIRT parking area at Tyndall Air Force Base in Florida. The fixed price contract seeks a contractor to provide all necessary professional services, permits, equipment, labor, materials and other items to complete tasks defined in the Statement of Work. This includes repairing select pavements to standards including UFC 325001 and UFC 325003. The North American Industry Classification System code 238990 applies. The requirement is set aside for 100% Service-Disabled Veteran-Owned Small Businesses with magnitude between $1,000,000 to $5,000,000 and a period of performance of 365 calendar days after notice to proceed. The selection procedure will be Lowest Price Technically Acceptable. The solicitation is expected to be issued on or around June 2, 2021 on beta.SAM.gov and paper copies will not be available.

View the file

Other files for this federal contract opportunity

Other files attached to Restore CEMIRT Parking Area, newest first.
File Type Posted
Attachment 10 Other Contract Requirements.pdf PDF
Attachment 6 AF Form 3000.pdf PDF
Attachment 5 AF Form 66.xls XLS spreadsheet
Attachment 8 AF 3065.pdf PDF
Attachment 11 General Financial Info.pdf PDF
Attachment 4 Wage Determination (Highway).pdf PDF
Attachment 3 SOW Appendix B.pdf PDF
Amendment FA481921R00230005 SF 30.pdf PDF
Attachment 9 Sample RFI.PDF PDF
Attachment 7 AF 3064.pdf PDF
Attachment 1 SOW XLWU 208174 revised 29JUL21.pdf PDF
Amendment FA481921R00230004 SF 30.pdf PDF
Additional RFIs Answered.docx DOCX document
FA481921R00230003 SF 30.pdf PDF
Solicitation Amendment FA481921R00230002 SF 30.pdf PDF
20100427 AB1141 Asbuilt Bldg 1141.pdf PDF
Amendment FA481921R00230001 SF 30.pdf PDF
20130430 - AB1142 Asbuilt Bldg 1142.pdf PDF
20110214 - AB1144 2012 May - Asbuilt Bldg 1144.pdf PDF
20100823 AB1141 091085 C1 2.pdf PDF
20100823 AB1141 091085 ANDERSON SWALE 12.18.09.pdf PDF
20071218 - AB1142 Xplan.pdf PDF
AF Form 813 CEMIRT Facilities.pdf PDF
20100823 - AB1141 091085-E1.pdf PDF
20100823 AB1141 091085-A1.pdf PDF
20080116 AB1142 Asbuilt Bldg 1142.pdf PDF
Attachment 2 - SOW Appendix A - Revised 6-30-21.pdf PDF
Restore CEMIRT Parking Area.zip ZIP file
Synopsis CEMIRT Parking.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers

RFI #CONTRACTOR QUESTIONSREF PARAGRAPHDATE ENTEREDDATE SUBMITTEDRESPONSE DATEGOVERNMENT RESPONSE
1Is the schedule for the proposal to be in the format of Attachment 7, or a gantt chart?Yes the schedule for the proposal needs to be in the format of Attachment 7 (AF Form 3064).
2Is Attachment 11 to be included in the proposal? If so, where?Yes Attachment 11 (Financial Information) needs to be filled out and included in the proposal as an attachment.
3Is the design-build contractor to perform a geotechnical investigation as part of the design process or will the government be providing the contractor the necessary geotechnical information in order to comply with the design requirements listed in the Scope of Work paragraph 2.1?Air Force has not performed any geotechnical testing. Any testing required as part of the design process will be the responsiblility of the contractor.
4What are the illumination requirements for the site lighting? Are there any specific requirements as to minimum, average, and maximum FC?Refer to UFC 3-530-01, Chap 5-6 "Vehicle Traffic Areas" for specifics
5Has the government prepared a NEPA for this project?Air Force environmental requirement is processed through form 813. The completed 813 form will be provided.
6Please verify that in accordance with the Standard Form 1442, an offer guarantee is not required.An offer guarantee is not required IAW the solicitation (Standard Form 1442).
7Do we need to include construction fencing?Yes
8Do we need to include any security systems? Such as gate access, gate access with card readers, and/or CCTV?No security systems required.
9Do we need to include Emergency Call Centers?No emergency call center required.
10Has a wetland delineation been performed for this entire project site? Are any portions of the site delineated as wetland? If not, is that a requirement of the contractor?Air Force has determined that a catagorical exemption from further environmental analysis exists. This does not relieve the burden of permitting for stormwater improvments. (Form 813 supplied)
11Please clarify if a specific party is required to install the lighting on this project. If this specific party is required to install the lighting, does this fall within the contractor’s scope of work? What would this specific party’s scope of work be?Contractor would be responsible for installing lighting. The Scope of work for the lighting is to install lighting meeting minimum req's provided on question 4. Gulf Coast Electric Coop is the private utiltiy contractor for Tyndall Air Force Base. As such the prime contractor will have to coordintate with GCEC to install lighting. Cost of lighting and installation to be included in proposal.
12Appendix A shows some existing stormwater items. The drawings show a number of inlets and 1 discharge, but does not show any pipe connecting these items. Please advise if the stormwater items shown (and those that are missing from the drawing) are pipe, open channel, or a combination. Please provide type, size, condition, capacity, and as-builts for these items.Information provided in the Utilities (Stormwater) drawing is all the current information the air force has as it relates to this project site.
13Please verify the existing storm water routing.Information provided in the Utilities (Stormwater) drawing is all the current information the air force has as it relates to this project site.
14Permitting and Environmental – What has already been performed and what must be performed by the contractor?Air Force has determined that a catagorical exemption from further environmental analysis exists. This does not relieve the burden of permitting for stormwater improvments. (Form 813 supplied).
15Please provide a copy of the Environmental Assessment.The completed Air Force form 813 will be added to the solicitation package.
16Please provide the pavement section of the existing concrete pavement in the CEMIRT area.Not available
17Is there an existing power source for our electrician to tie into/access to power the lighting and receptacles on the new parking lot?No. The current electrical sources in surrounding buildings do not have capacity for new lighting/receptacle load. A new standalone electrical system will be required and can be fed from the transformer identifed on the site visit.
18Will the contractor be able to use the vacant parking lot at Barnes Drive as a construction staging/access area? If not, where is the most feasible location for staging/access?The most feasible location for staging is the corner of Suwannee Rd and Mississippi Rd, adjacent rock area. Tyndall Air Force base has many current and future projects, any staging/material laydown areas will need prior approval from 325 CES prior to use.
19Attachment 1, para. 2.3 identifies numerous standards that don’t appear to be applicable to the scope and/or outdated: MIL-HDBK-1013 and UFC 4-010-01 cover security of facilities and DOD 5200.1.R is outdated. Please confirm that these are applicable to a non-facilities project and/or what standard should be applicable.Disregard listed criteria that does not pertain to the design and construction scoped in project.
20Attachment 1, para. 4.6 AFM 91-201 covers many tasks including EMR surveys, DDESB surveys and other items that are to be on-going work of the Installation and processes if explosive are found during construction. Please identify which specific items in this document are the responsibility of the contractor and which items 325 CES will provide to the contractor. In other words is the contractor required to complete a UXO/MEC survey prior to start of work?No, a UXO/MEC survey is not required.
21There is no mention of endangered species being present or surveys having been conducted. Please confirm that no endangered species are present and no special measures are required at this time.Air Force has determined that a catagorical exemption from further environmental analysis exists. This does not relieve the burden of permitting for stormwater improvments. (Form 813 supplied)
22At the site walk-through it was stated that the pavilion building was going to be removed at a future date. Please confirm that this is correct.The white "temporary facility (T1146)" located roughly in the center of the current pad is expected to be in place until 2024.
23Please confirm that EISA Section 438 is only applicable to the areas disturbed under this project and that runoff from adjacent areas is not required to be managed beyond FDEP requirements.
Confimed
24Please identify who owns the transformer and any electrical design/construction standards that need to be met.Gulf Coast Electric Cooperative owns the Transformer. Refer to UFC 3-520-01, 3-530-01, 3-550-01, National Electical Code, as well as any additonal requirements set forth by Gulf Coast Electrical Cooperative
25Attachment 1 SOW, para. 2.2.2 states to provide (2) 20 amp receptacles every 20 ft. around the perimeter of the new parking facility. This is a duplex receptacle every 20 ft and would equal the 45 outlets identified in Attachment B. However, the last page of SOW Appendix A states to provide (2) 20 amp duplex receptacles every 15-20 feet (4 outlets every 15-20 feet) or a total of 90 outlets. Because each receptacle is required to have its own circuit this would double the number of circuits and electrical panels required. Please confirm whether a single duplex outlet (2 receptacles) or (2) duplex (4 receptacles) are required every 20 feet.Clarification: Receptacle (1 device, 2 outlets). Provide (2) 20 Amp Receptacle every 20' feet around the perimeter of the new parking facility. Each receptacle will have its own dedicated 20 Amp Circuit. This means there will be (2) recepacles every 20' around the perimeter of the new pad.
26Will a geotechnical report be provided by the AFB?Air Force has not performed any geotechnical testing. Any testing required as part of the design process will be the responsiblility of the contractor.
27What is the AFB preference of lighting fixtures?Refer to applicable to UFC publications and 325th CES/Environmental for lighting specifics that may affect local fish and wildlife. Turtle lighting is required South of Hwy 98.
28Will the AFB provide drawings of the existing paving?See Autocad drawing provided.
29Will the AFB provide design of the parking lot to the East?Drawing that are available will be provided.
30Please provide the thickness of existing slabs that we are tying on to?The slab is approximately 6" thick, but refer to any as built drawings for exact measurements.
31Who is responsible for removing the equipment and materials that are along the edge of existing concrete pavement in the locations where we adjoin?CEMIRT (Customer/Owner) will move anything inside the current fenced area (generators, yellow rail system, etc) upon request with 14 day advanced notice. Anything outside the fenced area (broken poles, old fencing, old concrete, etc, will be the responsibility of the contractor. CEMIRT will need a 14 day notice to move any equipment within the fenced area.
32Who will locate all the underground utility lines? Does the

government locate the lines or is the contractor responsible using 811?

Contact 325 CES for clarification. Air Force form 103 (dig permit) will be required prior to commencing work. Utilities will be marked during this process.
33What is the purpose of the amendment? We have reviewed it and can find nothing that has changed. We want to be sure we are not over looking some intended change.The amendment was for a minor typo in the Statement of Work. The changes include: In Attachment 2 - SOW Appendix A. Page 11 weight for the "Interim Basic Expenditionary Airfield Resources Generators (IBEAR)" changed from 601k lbs to 60k lbs.
34It appears the limits of disturbance does not include the areas behind B1141 or B1142 extending to end of existing parking. What is the LOD taking into account for these areas?The LOD on the East side of B1142 will need to be minimal as to not effect the K9 facility. The LOD on the West side of B1141 will have to be minimal as to not effect the existing stormwter conveyence.
35What are the finish floor elevations for B1141, B1142, B1144 & T1146?Refer to as builts drawings for specifics. Available as builts will be supplied.
36Is the transformer north and between B1141 & B1144 to be used to serve the site? If so what is the phase and voltage of the transformer?Yes, this is the transformer to use. Voltage 277/480V. Contact Gulf Coast Electric Cooperative for additonal info.
37What is the minimum foot candle lighting requirements for this new area?Refer to UFC 3-530-01, Chap 5-6 "Vehicle Traffic Areas" for specifics
38Is the existing parking area to be added to the lighting requirements?Yes, provide lighting to cover old and new parking area.Lighting for existing parking lot was not included in the original scope of work and should be submitted as a bid option.
39Are we to design area for turning radii as if T1146 has been removed?No, design turning radius requirement as if T1146 stays in place.
40Are all existing guardrail and fences to be removed where the new parking is added?CEMIRT will remove the yellow guard rail upon request with 14 day advance notice Contractor will be responsible for removing, relocating, etc. perimeter fence.
42What are the measurements / layout design of parking area not including the storm water pond?The estimated size of the parking area is 60,000 SF but the final size will be determined by design which meets the specified criteria
43Can we use bldg. for light source? if so what is the Hight of building?No, Lighting will be required to be install on poles
44Can poles be installed in parking lot or only on the parameter?Lighting can be sited per designer of records decision as long as all criteria is met.
45Will lighting have to meet turtle friendly requirements?Yes, Turtle friendly lighting is required South of Hwy 98
46On Contractor Pricing Schedule you have lighting quantity as 12, does this need to be designed not to exceed 12 lights?This is a quantity estimate. The actual number of lights will be determined by the contractor's Design of Record per listed requirements.
47Is there sufficient power in near by buildings for 45 dedicated 120v circuits and the lighting or will we have to install or upgrade a servicePower will have to be supplied from the existing transformer to the North of building 1144.
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100

&"Arial,Bold"PROJECT ID AND LOCATION

File details come from the government source that posted it. Updated .