SOW_Appendix_Drawings.pdf
PDF 4 MB Posted
- Attached to
- Repair Docks, Basewide Federal contract opportunity
- Solicitation number
- FA4819-18-B-7003
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4819-18-B-7003-0002_Amendment_2.pdf | ||
| Questions_and_Answers_-_6_June.pdf | ||
| Questions_and_Answers_-_4_June_18.pdf | ||
| FA4819-18-B-7003_Amendment_1.pdf | ||
| FA4819-18-B-7003.pdf | ||
| Attachment_4_Wage_Determination.pdf | ||
| Attachment_2_SOW_Appendix_Drawings.pdf | ||
| Attachment_1_Statement_of_Work.pdf | ||
| Attachment_3_Pricing_Schedule.pdf | ||
| Repair_Docks,_Basewide__Synopsis.pdf | ||
| Draft_Repair_Docks_Base_Wide_SOW.pdf | ||
| Repair_Docks,_Basewide__Synopsis.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
CRITERIA DRAWING: Bonita Bay Boat Ramp (B5030)
Appendix A (2.2.1) Page 2 of 2
RAMP
- Demolish existing concrete panel ramp (+ 1,350 sf)
- Prepare, grade & compact exposed subgrade
- Grade powerloading depressions & mounds beyond ramp toe
- Place, grade, compact min 12" of stone base for ramp systems requiring base materials.
- Construct concrete ramp pavement (+ 1,350 sf)
** Dimensions are approximate, Contractor to verify all dimensions.
Dimensions Approach (2 Locations):
Length 50 ft Width 14 ft
Dimensions Ramp (2 Locations):
Length 45 ft Width 15 ft
0 5025 100 ft
0 105 20 m
1:564
APPROACH SLAB
- Demolish existing approach slabs & subgrade (+ 1,400 sf)
- Prepare, grade & compact exposed subgrade
- Place, grade, compact base materials; min 6"
- Construct min 6" reinforced concrete pavement (+ 1,400 sf)
** See Statement of Work for Additional Requirements
1515703183E Callout Boat Ramp
1515703183E Line
1515703183E Polygonal Line
1515703183E Polygonal Line
1515703183E Callout Approach
1515703183E Line
1515703183E Polygonal Line
1515703183E Polygonal Line
1515703183E Polygonal Line
1515703183E Polygonal Line
1515703183E Callout Ramp Toe
1515703183E Line
Bonita Bay Side Walk
0 5025 100 ft
0 105 20 m
1:564
Side Walk
PROJECT LOCATION:
0 1 20.5 mi
0 2 41 km
1:72,224, 201
0 5025 100 ft
0 105 20 m
1:564
Finger Piers
Beach Board alk
0 0.6 1.20.3 mi
0 1 20.5 km
1:36,112, 201
0 0.0750.0375 0.15 mi
0 0.10.05 0.2 km
1:4,514
PHONE
STATIONS
RAISED
PAVILION
BOARDWALK
Conservation Measures for Dune Walkover Construction September 2015
1. Walkovers/Boardwalks. Dune walkovers shall be constructed at a height (minimum three feet above grade – higher if habitat has been impacted from storms) to accommodate natural dune growth and associated vegetation.
2. Equipment storage. No storage of equipment or materials shall occur on the beach or dunes throughout the entire year.
3. Construction. A top down construction method should be utilized. This would limit human and mechanical impacts to the dunes by allowing the new construction to progress outward from the previous construction.
4. Sea turtle nesting. No walkover/boardwalk construction shall occur on the beach during the sea turtle nesting season from May 1 through November 1.
5. Sand fence. Minimal use of sand fence is encouraged. When used, the fence must be used for restoration of dune blowouts. Post and rope is preferred for beach visitor access, pedestrian traffic control, and wildlife exclusion zones (i.e., bird wintering areas). If used for dune restoration, the fence shall be placed in a sea turtle compatible design and be made of biodegradable material.
6. Dune protection. No activity, except as needed to repair the walkover/boardwalk, shall occur on existing healthy dunes during any time of the year. Limit activities within this area to maintenance and restoration of the habitat. Use appropriate signs to designate and indicate the purpose of the conservation area, if necessary.
7. Restoration. If dune restoration is needed for the dune walkover construction project, contact the USFWS Panama City Field Office for further assistance.
8. Refuse. Install and maintain sturdy animal-proof garbage containers to prevent the invasion of house mice, non-native rats and predators (cats, raccoons, fox, coyotes).
9. Lighting. No lighting shall be utilized on the dune walkover.
U.S. Fish and Wildlife Service 1601 Balboa Avenue Panama City, Florida 32405
(850) 769-0552 http://www.fws.gov/panamacity/
UNITED STATES DEPARTMENT OF COMMERCE
National Oceanic and Atmospheric Administration
NATIONAL MARINE FISHERIES SERVICE
Southeast Regional Office 263 13th Avenue South St. Petersburg, FL 33701
SEA TURTLE AND SMALLTOOTH SAWFISH CONSTRUCTION CONDITIONS
The permittee shall comply with the following protected species construction conditions:
a. The permittee shall instruct all personnel associated with the project of the potential presence of these species and the need to avoid collisions with sea turtles and smalltooth sawfish. All construction personnel are responsible for observing water-related activities for the presence of these species.
b. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing sea turtles or smalltooth sawfish, which are protected under the Endangered Species Act of 1973.
c. Siltation barriers shall be made of material in which a sea turtle or smalltooth sawfish cannot become entangled, be properly secured, and be regularly monitored to avoid protected species entrapment. Barriers may not block sea turtle or smalltooth sawfish entry to or exit from designated critical habitat without prior agreement from the National Marine Fisheries Service’s Protected Resources Division, St. Petersburg, Florida.
d. All vessels associated with the construction project shall operate at “no wake/idle” speeds at all times while in the construction area and while in water depths where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will preferentially follow deep-water routes (e.g., marked channels) whenever possible.
e. If a sea turtle or smalltooth sawfish is seen within 100 yards of the active daily construction/dredging operation or vessel movement, all appropriate precautions shall be implemented to ensure its protection. These precautions shall include cessation of operation of any moving equipment closer than 50 feet of a sea turtle or smalltooth sawfish. Operation of any mechanical construction equipment shall cease immediately if a sea turtle or smalltooth sawfish is seen within a 50-ft radius of the equipment. Activities may not resume until the protected species has departed the project area of its own volition.
f. Any collision with and/or injury to a sea turtle or smalltooth sawfish shall be reported immediately to the National Marine Fisheries Service’s Protected Resources Division (727-824- 5312) and the local authorized sea turtle stranding/rescue organization.
g. Any special construction conditions, required of your specific project, outside these general conditions, if applicable, will be addressed in the primary consultation.
Revised: March 23, 2006 O:\forms\Sea Turtle and Smalltooth Sawfish Construction Conditions.doc
STANDARD MANATEE CONDITIONS FOR IN-WATER WORK
The permittee shall comply with the following conditions intended to protect manatees from direct project effects:
a. All personnel associated with the project shall be instructed about the presence of manatees and manatee speed zones, and the need to avoid collisions with and injury to manatees. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act, the Endangered Species Act, and the Florida Manatee Sanctuary Act.
b. All vessels associated with the construction project shall operate at "Idle Speed/No Wake” at all times while in the immediate area and while in water where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible.
c. Siltation or turbidity barriers shall be made of material in which manatees cannot become entangled, shall be properly secured, and shall be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement.
d. All on-site project personnel are responsible for observing water-related activities for the presence of manatee(s). All in-water operations, including vessels, must be shutdown if a manatee(s) comes within 50 feet of the operation. Activities will not resume until the manatee(s) has moved beyond the 50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not reappeared within 50 feet of the operation. Animals must not be herded away or harassed into leaving.
e. Any collision with or injury to a manatee shall be reported immediately to the Florida Fish and Wildlife Conservation Commission (FWC) Hotline at 1-888-404-3922. Collision and/or injury should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-731-3336) for north Florida or Vero Beach (1-772-562-3909) for south Florida, and to FWC at ImperiledSpecies@myFWC.com
f. Temporary signs concerning manatees shall be posted prior to and during all in-water project activities. All signs are to be removed by the permittee upon completion of the project. Temporary signs that have already been approved for this use by the FWC must be used. One sign which reads Caution: Boaters must be posted. A second sign measuring at least 8 ½” by 11" explaining the requirements for “Idle Speed/No Wake” and the shut down of in-water operations must be posted in a location prominently visible to all personnel engaged in water-related activities. These signs can be viewed at MyFWC.com/manatee. Questions concerning these signs can be sent to the email address listed above.
| AF 66_3064_3065_ XLWU171022.pdf |
| AF 66 |