FA4819-18-B-7003-0002_Amendment_2.pdf
PDF 107 KB Posted
- Attached to
- Repair Docks, Basewide Federal contract opportunity
- Solicitation number
- FA4819-18-B-7003
About this file
Attached is amendment 2 of this solicitation. The changes are located within sections L and M. Section L change is to correct the solicitation number is only an administrative correction. The other change is located in section M to update the evaluation language to match that of Section L. Specifically, the previous term used was a progress schedule, that term has been replaced with the Section L verbiage as to what elements are needed. Non-acknowledgement of Amendment 2 will not disqualify bidders.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_-_6_June.pdf | ||
| FA4819-18-B-7003_Amendment_1.pdf | ||
| Questions_and_Answers_-_4_June_18.pdf | ||
| Attachment_3_Pricing_Schedule.pdf | ||
| FA4819-18-B-7003.pdf | ||
| Attachment_4_Wage_Determination.pdf | ||
| Attachment_2_SOW_Appendix_Drawings.pdf | ||
| Attachment_1_Statement_of_Work.pdf | ||
| Repair_Docks,_Basewide__Synopsis.pdf | ||
| SOW_Appendix_Drawings.pdf | ||
| Draft_Repair_Docks_Base_Wide_SOW.pdf | ||
| Repair_Docks,_Basewide__Synopsis.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F4A3608086AW01 XLWU 17-1022
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to accomplish the follow ing:
1. Correct IFB Number is Section L.
2. Clairfy documents to be submitted in Section M.
3. Correct bid opening location to the 325th Comptroller Squadron in Building 647, Tyndall AFB.
4. Bid Opening date remains the same, 14 June 2018 at 1:00pm.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA481918B7003
X 9B. DATED (SEE ITEM 11)
14-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION
NO. 0002
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Jun-2018
CODE
325 CONS/LGCC SABER
501 AIREY AVE STE 5
TYNDALL AFB FL 32403
FA4819 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA481918B7003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The Issued By organization has changed from
325 CONTRACTING SQ (STOP 28)
501 AIREY AVE, SUITE 5
TYNDALL AFB FL 32403-5526
to
325 CONS/CC STOP/28 - FA4819
501 AIREY AVE, STE 5
TYNDALL AFB FL 32403-5526
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS TO BIDDERS
1. To assure timely evaluation of bids, bidders must follow the instructions contained herein. Bidders are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in a bid being rejected. Bidders must clearly identify any exception to the solicitation terms and conditions and provide accompanying rationale.
2. Invitation for Bid: The offeror shall submit the original of the following:
a. SF 1442- Complete blocks 14, 15, 17, 19, 20a, b, and c. By completing the SF 1442 in this manner, the bidder accedes to the contract terms and conditions as written in the IFB. Return entire SF 1442. An official authorized to contractually bind the bidder must sign Block 20B, in accordance with FAR 52.214- 12.
b. Bid Schedule- Bidder shall insert the proposed pricing in the Bid Schedule for each Contract Line Item.
Unit prices shall prevail
c. Bidders must submit a proposed phasing plan for each task outlined in the Statement of Work. The proposed phasing plan must include the amount of days required to complete each task, mobilization time, and demobilization time.
d. Amendments- Any amendments to the solicitation shall be acknowledged by annotating Block 19 of the
SF 1442.
3. Documents may be mailed or hand delivered to:
325 CONS/PKCA
ATTN: Ms. Melissa Sanders –DO NOT OPEN –
IFB: FA4819-18-B-7003
501 Airey Avenue, Suite 5 Tyndall AFB, FL 32403
4. HAND DELIVERY OF BIDS
a. If bids are hand delivered, offerors are cautioned to arrive early for base access. A Government representative will be available to escort bidders on base starting at 12:15pm CT and will leave the visitors center no later than 12:50pm CT. Offerors are cautioned to strictly comply with all instructions within this invitation for bid to ensure submission of a complete bid. Failure to furnish a complete bid at the time of bid submission may result in an unacceptable bid that the Government eliminates from consideration for award. The Government will not accept any changes to offerors bids after the opening time of this solicitation.
5. BIDS WILL NOT BE ACCEPTED BY EMAIL OR FAX
FA481918B7003
6. Formal communications such as request for clarification and/or information concerning this solicitation must be submitted in writing to the above address or sent via e-mail to the following:
E-Mail: 325CONS.Construction@us.af.mil NOTE: Any amendments to the solicitation shall be acknowledged in Block 19 of the SF Form 1442 or by returning a signed copy of the amendment(s), SF 30, with the proposal.
7. BID OPENING – Bid Opening will be conducted at the address listed above in the 325 Comptroller Squadron Conference Room (Building 647) on 14 June 2018 at 1:00 PM CST. All interested parties are welcome to attend. If offerors intend to mail in bids it is recommended to send them in early and confirm the receipt of the bid.
SECTION M - EVALUATION FACTORS FOR AWARD
The following have been modified:
BASIS OF AWARD
BASIS OF AWARD
EVALUATION FOR AWARD (IAW FAR 14.4)
1. The government will award one (1) contract as a result of this invitation for bid to the lowest responsive and responsible bidder having submitted an acceptable bid, proposed phasing plan which must include the amount of days required to complete each task, mobilization time, and demobilization time, and completed pricing schedule (Attachment 03).
2. To determine Contractor responsibility, bidders will be evaluated in accordance to standards specified in Federal Acquisition Regulation 9.104-1.
(End of Summary of Changes) mailto:325CONS.Construction@us.af.mil