Attachment_3_Pricing_Schedule.pdf

PDF 381 KB Posted

Attached to
Repair Docks, Basewide Federal contract opportunity
Solicitation number
FA4819-18-B-7003
Issued by
Department of the Air Force Air Combat Command

About this file

Pricing/Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Repair Docks, Basewide, newest first.
File Type Posted
FA4819-18-B-7003-0002_Amendment_2.pdf PDF
Questions_and_Answers_-_6_June.pdf PDF
Questions_and_Answers_-_4_June_18.pdf PDF
FA4819-18-B-7003_Amendment_1.pdf PDF
FA4819-18-B-7003.pdf PDF
Attachment_4_Wage_Determination.pdf PDF
Attachment_2_SOW_Appendix_Drawings.pdf PDF
Attachment_1_Statement_of_Work.pdf PDF
Repair_Docks,_Basewide__Synopsis.pdf PDF
SOW_Appendix_Drawings.pdf PDF
Draft_Repair_Docks_Base_Wide_SOW.pdf PDF
Repair_Docks,_Basewide__Synopsis.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDUL

2.2.1 TASK 1

XLWU 17-1022

Repair Docks, Basewide

BONITA BAY BOAT RAMP

DATE: ____________________________________________________

PRICING SCHEDULE TASK 1 1 of 4

LINE ITEM

1 Mobilization / Demobilization

2 Equipment Rental

3 Dewatering Equipment Rental

4 Superintendence

Permitting / Professional Services

LINE ITEM

1 Remove Concrete Ramps

2 Remove Soil

3 Disposal

Dewatering Equipment Operation

Remove excess and unsuitable soil within the ramp area and beyond the toe of the ramp to accommodate new work.

Disposal of waste soil and concrete materials

(If Required) All costs associated with installation and operation of dewatering efforts.

LABOR HOURS/

UNIT LABOR RATE $ LABOR TOTAL LINE ITEM TOTALDESCRIPTION

Remove existing concrete ramp pavements.

All costs associated with permitting and professional services necessary to complete the task.

2.2.1 DEMOLITION SECTION SUB TOTAL

2.2.1 A RAMPS (DEMOLITION)

MATERIAL UNIT

MATERIAL

QUANTITY

MATERIAL UNIT

COST $

MATERIAL

TOTAL $

LINE ITEM TOTALDESCRIPTION

A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.

All costs associated with equipment rental to accomplish the work.

(If Required) All equipment rental necessary to perform dewatering efforts.

All costs associated with providing oversite during the performance of on site activities; layout, demolition, construction.

2.2.1 GENERAL CONDITIONS SECTION SUB TOTAL

GENERAL CONDITIONS LABOR HOURS/

UNIT LABOR RATE $ LABOR TOTALMATERIAL UNIT

MATERIAL

QUANTITY

MATERIAL UNIT

COST $

MATERIAL

TOTAL $

XLWU 17-1022

Repair Docks, Basewide

BONITA BAY BOAT RAMP

DATE: ____________________________________________________

PRICING SCHEDULE TASK 1 2 of 4

LINE ITEM

1 Remove Concrete Ramps

2 Remove Soil

3 Disposal

Dewatering Equipment Operation

2.2.1 C RAMPS (CONSTRUCTION)

LINE ITEM

1 Prepare Subgrade

2 Place Base Material

3 Construct Ramp

Dewatering Equipment Operation

Disposal of waste soil and concrete materials

(If Required) All costs associated with installation and operation of dewatering efforts.

LABOR RATE $ LABOR TOTAL LINE ITEM TOTALDESCRIPTION

Remove existing concrete ramp pavements.

Remove excess and unsuitable soil within the ramp area and beyond the toe of the ramp to accommodate new work.

2.2.1 B APPROACH SLABS (DEMOLITION)

MATERIAL UNIT

MATERIAL

QUANTITY

MATERIAL UNIT

COST $

MATERIAL

TOTAL $

LABOR HOURS/

UNIT

LINE ITEM TOTALDESCRIPTION

Line item shall include grading, compaction and ancilary efforts required to prepare subgrade for aggregate/base placement and modification to the grade beyond the ramp toe.

Provide, Install and grade a minimum of 12" consolidated #57 stone.

Construct the concrete pavements for the ramps.

Reinforcement, anchoring and finishing are included in this line item.

(If Required) All costs associated with installation and operation of dewatering efforts.

2.2.1 CONSTRUCTION SECTION SUB TOTAL

MATERIAL UNIT

MATERIAL

QUANTITY

MATERIAL UNIT

COST $

MATERIAL

TOTAL $

LABOR HOURS/

UNIT LABOR RATE $ LABOR TOTAL

Repair Docks, Basewide

BONITA BAY BOAT RAMP

DATE: ____________________________________________________

PRICING SCHEDULE TASK 1 3 of 4

2.2.1 D APPROACH SLABS (CONSTRUCTION)

LINE ITEM

1 Prepare Subgrade

2 Place Fill

3 Construct Concrete Sidewalk

LINE ITEM

001 Overhead

002 Profit

003 Bond

LABOR RATE $ LABOR TOTAL LINE ITEM TOTAL

Line item shall include grading, compaction and ancilary efforts required to prepare subgrade for fill placement.

Provide, install, grade & compact fill materials.

Construct the concrete sidewalk. Formwork, reinforcement, placement and finishing elements are included in this line item.

Actual Bond

PROJECT TOTAL ESTIMATE (Overhead, Profit, Bond + Project Subtotal) =

Overhead Costs

Profit

MATERIAL UNIT

2.2.1 OVERHEAD, PROFIT, BOND SECTION SUB TOTAL

OVERHEAD, PROFIT, BOND

% TOTAL NotesDESCRIPTION

DESCRIPTION

PROJECT SUBTOTAL (General Conditions + Demolition + Construction) =

MATERIAL

QUANTITY

MATERIAL UNIT

COST $

MATERIAL

TOTAL $

LABOR HOURS/

UNIT

Repair Docks, Basewide

BONITA BAY BOAT RAMP

DATE: ______________________________

Note: Provide additional pages as needed PRICING SCHEDULE TASK 1 4 of 4

2.2.1 EQUIPMENT RENTAL ( ITEMIZED LIST )

UNIT QUANTITY UNIT COST TOTAL

ex. MONTH 1 2,180.00 2,180.00$

1 -$

2 -$

3 -$

4 -$

5 -$

6 -$

7 -$

8 -$

9 -$

10 -$

11 -$

12 -$

13 -$

14 -$

15 -$

16 -$

17 -$

18 -$

19 -$

20 -$

OTHER PROJECT NOTES FOR BID

UNIT QUANTITY UNIT COST TOTAL

ex. MONTH 1 2,180.00 2,180.00$

1 -$

2 -$

3 -$

4 -$

5 -$

6 -$

7 -$

8 -$

9 -$

10 -$

11 -$

12 -$

13 -$

14 -$

15 -$

16 -$

17 -$

18 -$

19 -$

20 -$

SUB TOT

DESCRIPTION

(Example) 40' Straight Boom Manlift (Sunbelt Rentals)

SUB TOT

RENTAL DESCRIPTION

(Example) 40' Straight Boom Manlift (Sunbelt Rentals)

2.2.2 TASK 2

Repair Docks, Basewide

BONITA BAY DOCK SIDEWALK, B5030

DATE: ____________________________________________________

PRICING SCHEDULE TASK 2 5 of 3

LINE ITEM

1 Mobilization / Demobilization

2 Equipment Rental

3 Dewatering Equipment Rental

4 Superintendence

LINE ITEM

1 Remove Concrete Sidewalk

2 Remove Soil & Debris

3 Disposal

2.2.2 GENERAL CONDITIONS SECTION SUB TOTAL

GENERAL CONDITIONS MATERIAL

UNIT

MATERIAL

QUANTITY

MATERIAL UNIT

COST $ MATERIAL TOTAL $

LABOR HOURS/

UNIT LABOR RATE $ LABOR TOTAL LINE ITEM TOTALDESCRIPTION

A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.

(If Required) All equipment rental necessary to perform dewatering efforts.

All costs associated with providing oversite during the performance of on site activities; layout, demolition, construction.

All costs associated with equipment rental to accomplish the work.

Disposal of demolition and construction waste.

SECTION SUB TOTAL

SIDEWALK (DEMOLITION) MATERIAL

UNIT

MATERIAL

QUANTITY

MATERIAL UNIT

COST $ MATERIAL TOTAL $

LABOR HOURS/

UNIT LABOR RATE $ LABOR TOTAL

2.2.2 A DEMOLITION

LINE ITEM TOTALDESCRIPTION

Remove existing concrete sidewalk.

Remove excess or unsuitable soil and debris to accommodate new work.

Repair Docks, Basewide

BONITA BAY DOCK SIDEWALK, B5030

DATE: ____________________________________________________

PRICING SCHEDULE TASK 2 6 of 3

SIDEWALK (CONSTRUCTION)

LINE ITEM

1 Prepare Subgrade

2 Place Fill

3 Construct Concrete Sidewalk

LINE ITEM

001 Overhead

002 Profit

003 Bond

DAYS

Construct the concrete sidewalk. Formwork, reinforcement, placement and finishing elements are included in this line item.

LINE ITEM TOTAL

2.2.2 B CONSTRUCTION

DESCRIPTION

Line item shall include grading, compaction and ancilary efforts required to prepare subgrade for fill placement.

Provide, install, grade & compact fill materials.

SECTION SUB TOTAL

MATERIAL

UNIT

MATERIAL

QUANTITY

MATERIAL UNIT

COST $ MATERIAL TOTAL $

LABOR HOURS/

UNIT LABOR RATE $ LABOR TOTAL

Overhead Costs

2.2.2 OVERHEAD, PROFIT, BOND SECTION SUB TOTAL

PROJECT SUBTOTAL (General Conditions + Demolition + Construction) =

OVERHEAD, PROFIT, BOND

% TOTAL NotesDESCRIPTION

PROJECT TOTAL ESTIMATE (Overhead, Profit, Bond + Project Subtotal) =

CONTRACTOR PERIOD OF PERFORMANCE - CONSTRUCTION =

Profit

Actual Bond

Repair Docks, Basewide

BONITA BAY DOCK SIDEWALK, B5030

DATE: ______________________________

Note: Provide additional pages as needed PRICING SCHEDULE TASK 2 3 of 3

2.2.2 EQUIPMENT RENTAL ( ITEMIZED LIST )

UNIT QUANTITY UNIT COST TOTAL

ex. MONTH 1 2,180.00 2,180.00$

1 -$

2 -$

3 -$

4 -$

5 -$

6 -$

7 -$

8 -$

9 -$

10 -$

11 -$

12 -$

13 -$

14 -$

15 -$

16 -$

17 -$

18 -$

19 -$

20 -$

OTHER PROJECT NOTES FOR BID

UNIT QUANTITY UNIT COST TOTAL

ex. MONTH 1 2,180.00 2,180.00$

1 -$

2 -$

3 -$

4 -$

5 -$

6 -$

7 -$

8 -$

9 -$

10 -$

11 -$

12 -$

13 -$

14 -$

15 -$

16 -$

17 -$

18 -$

19 -$

20 -$

DESCRIPTION

(Example) 40' Straight Boom Manlift (Sunbelt Rentals)

SUB TOT

SUB TOT

2.2.3 TASK 3

Repair Docks, Basewide

82 ATRS BOAT STORAGE,

B9709

DATE: ____________________________________________________

PRICING SCHEDULE TASK 3 8 of 13

LINE ITEM

1 Mobilization / Demobilization

2 Equipment Rental

3 Dewatering Equipment Rental

4 Superintendence

LINE ITEM

1 Deck Supporting Structure

2 Deck (Walking Surface)

3 Docking Hardware

MATERIAL

QUANTITY

MATERIAL

UNIT COST $

Provide and Install the deck boards.

Provide and Install Docking hardware similar to existing.

Provide and Install the deck supporting structure and associated harware.

SIDEWALK (DEMOLITION) MATERIAL

UNIT LINE ITEM TOTALDESCRIPTION

MATERIAL TOTAL

LABOR

HOURS/ UNIT LABOR RATE $ LABOR TOTAL

SECTION SUB TOTAL

LINE ITEM TOTALDESCRIPTION

A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.

All costs associated with equipment rental to accomplish the work.

(If Required) All equipment rental necessary to perform dewatering efforts.

All costs associated with providing oversite during the performance of on site activities; layout, demolition, construction.

2.2.3 A DEMOLITION

2.2.3 GENERAL CONDITIONS SECTION SUB TOTAL

GENERAL CONDITIONS MATERIAL

UNIT

MATERIAL

QUANTITY

MATERIAL

UNIT COST $

MATERIAL TOTAL

LABOR

HOURS/ UNIT LABOR RATE $ LABOR TOTAL

Repair Docks, Basewide

82 ATRS BOAT STORAGE,

B9709

DATE: ____________________________________________________

PRICING SCHEDULE TASK 3 9 of 13

FINGER PIER (CONSTRUCTION)

LINE ITEM

1 Deck Supporting Structure

2 Deck (Walking Surface)

3 Docking Hardware

LINE ITEM

001 Overhead

002 Profit

003 Bond

DAYSCONTRACTOR PERIOD OF PERFORMANCE - CONSTRUCTION =

Overhead Costs

Profit

Actual Bond

PROJECT TOTAL ESTIMATE (Overhead, Profit, Bond + Project Subtotal) =

2.2.2 OVERHEAD, PROFIT, BOND SECTION SUB TOTAL

OVERHEAD, PROFIT, BOND

% TOTAL NotesDESCRIPTION

LINE ITEM TOTALDESCRIPTION

Provide and Install the deck supporting structure and associated harware.

Provide and Install the deck boards.

Provide and Install Docking hardware similar to existing.

PROJECT SUBTOTAL (General Conditions + Demolition + Construction) =

2.2.3 B CONSTRUCTION SECTION SUB TOTAL

MATERIAL

UNIT

MATERIAL

QUANTITY

MATERIAL

UNIT COST $

MATERIAL TOTAL

LABOR

HOURS/ UNIT LABOR RATE $ LABOR TOTAL

Repair Docks, Basewide

82 ATRS BOAT STORAGE, B9709

DATE: ______________________________

Note: Provide additional pages as needed PRICING SCHEDULE TASK 3 3 of 3

2.2.3 EQUIPMENT RENTAL ( ITEMIZED LIST )

UNIT QUANTITY UNIT COST TOTAL

ex. MONTH 1 2,180.00 2,180.00$

1 -$

2 -$

3 -$

4 -$

5 -$

6 -$

7 -$

8 -$

9 -$

10 -$

11 -$

12 -$

13 -$

14 -$

15 -$

16 -$

17 -$

18 -$

19 -$

20 -$

OTHER PROJECT NOTES FOR BID

UNIT QUANTITY UNIT COST TOTAL

ex. MONTH 1 2,180.00 2,180.00$

1 -$

2 -$

3 -$

4 -$

5 -$

6 -$

7 -$

8 -$

9 -$

10 -$

11 -$

12 -$

13 -$

14 -$

15 -$

16 -$

17 -$

18 -$

19 -$

20 -$

DESCRIPTION

(Example) 40' Straight Boom Manlift (Sunbelt Rentals)

SUB TOT

SUB TOT

2.2.4 TASK 4

Repair Docks, Basewide Tyndall Beach Boardwalk, B11300

DATE: ____________________________________________________

PRICING SCHEDULE TASK 4 11 of 3

LINE ITEM

1 Mobilization / Demobilization

2 Equipment Rental

3 Dewatering Equipment Rental

4 Superintendence

LINE ITEM

1 Deck (Walking Surface)

2 Railing

3 Deck Supporting Structure

4 Disposal

MATERIAL

QUANTITY

MATERIAL UNIT

COST $

Removal of the existing railing

Removal of the deck supporting structure and associated harware.

Disposal of waste materials

Removal of the deck boards and various associated harware.

BOARDWALK (DEMOLITION) MATERIAL

UNIT LINE ITEM TOTALDESCRIPTION

MATERIAL

TOTAL $

LABOR

HOURS/ UNIT

LABOR RATE

$ LABOR TOTAL

SECTION SUB TOTAL

LINE ITEM TOTALDESCRIPTION

A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.

All costs associated with equipment rental to accomplish the work.

(If Required) All equipment rental necessary to perform dewatering efforts.

All costs associated with providing oversite during the performance of on site activities; layout, demolition, construction.

2.2.4 A DEMOLITION

2.2.4 GENERAL CONDITIONS SECTION SUB TOTAL

GENERAL CONDITIONS MATERIAL

UNIT

MATERIAL

QUANTITY

MATERIAL UNIT

COST $

MATERIAL

TOTAL $

LABOR

HOURS/ UNIT

LABOR RATE

$ LABOR TOTAL

Repair Docks, Basewide Tyndall Beach Boardwalk, B11300

DATE: ____________________________________________________

PRICING SCHEDULE TASK 4 12 of 3

BOARDWALK (CONSTRUCTION)

LINE ITEM

1 4x4 PT Piles

2 Deck Supporting Structure

3 Deck (Walking Surface)

4 Railing

LINE ITEM

001 Overhead

002 Profit

003 Bond

DAYSCONTRACTOR PERIOD OF PERFORMANCE - CONSTRUCTION =

Overhead Costs

Profit

Actual Bond

PROJECT TOTAL ESTIMATE (Overhead, Profit, Bond + Project Subtotal) =

2.2.4 OVERHEAD, PROFIT, BOND SECTION SUB TOTAL

OVERHEAD, PROFIT, BOND

% TOTAL NotesDESCRIPTION

LINE ITEM TOTALDESCRIPTION

Adjust (replace where needed) existing 4x4 piles to be true and plumb.

Provide and Install the deck supporting structure and associated harware.

Provide and Install the deck boards.

Provide and Install new railing.

PROJECT SUBTOTAL (General Conditions + Demolition + Construction) =

2.2.4 B CONSTRUCTION SECTION SUB TOTAL

MATERIAL

UNIT

MATERIAL

QUANTITY

MATERIAL UNIT

COST $

MATERIAL

TOTAL $

LABOR

HOURS/ UNIT

LABOR RATE

$ LABOR TOTAL

Repair Docks, Basewide Tyndall Beach Boardwalk, B11300

DATE: ______________________________

Note: Provide additional pages as needed PRICING SCHEDULE TASK 4 3 of 3

2.2.4 EQUIPMENT RENTAL ( ITEMIZED LIST )

UNIT QUANTITY UNIT COST TOTAL

ex. MONTH 1 2,180.00 2,180.00$

1 -$

2 -$

3 -$

4 -$

5 -$

6 -$

7 -$

8 -$

9 -$

10 -$

11 -$

12 -$

13 -$

14 -$

15 -$

16 -$

17 -$

18 -$

19 -$

20 -$

OTHER PROJECT NOTES FOR BID

UNIT QUANTITY UNIT COST TOTAL

ex. MONTH 1 2,180.00 2,180.00$

1 -$

2 -$

3 -$

4 -$

5 -$

6 -$

7 -$

8 -$

9 -$

10 -$

11 -$

12 -$

13 -$

14 -$

15 -$

16 -$

17 -$

18 -$

19 -$

20 -$

DESCRIPTION

(Example) 40' Straight Boom Manlift (Sunbelt Rentals)

SUB TOT

SUB TOT

AF 66_3064_3065_ XLWU171022.pdf
AF 66

File details come from the government source that posted it.