FA4809-16-B-0001_Attach_5_AF_66.pdf
PDF 795 KB Posted
- Attached to
- Repair Overhead and Underground Electrical Lines Federal contract opportunity
- Solicitation number
- FA4809-16-B0001-Synopsis
About this file
AF 66
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers__3.doc | DOC document | |
| Amendment_02.doc | DOC document | |
| Questions_and_Answers__2.doc | DOC document | |
| Amendment_01.doc | DOC document | |
| Questions_and_Answers.doc | DOC document | |
| Attendance_Sheet.pdf | ||
| Site_Visit_Minutes.doc | DOC document | |
| Site_Visit_Minutes.doc | DOC document | |
| FA4809-16-B-0001_Attach_4_Local_Instruc.pdf | ||
| FA4809-16-B-0001_Attach_6_Pass_Request.pdf | ||
| FA4809-16-B-0001_Attach_3_WD.docx | DOCX document | |
| FA4809-16-B-0001_Attach_1_Specifications.pdf | ||
| FA4809-16-B-0001_Attach_7_Addendum_Rev_1.doc | DOC document | |
| FA4809-16-B-0001_Solicitation_Released.doc | DOC document | |
| FA4809-16-B-0001_Attach_2_Phase_1_Dwg_(Rev_5_Feb_16).pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPROVED DISAPPROVED
Notice of Construction Form
7460-1, Specification Section 01
00 00 Para 15.13.C
As Built Drawings, Specification
01 00 00 , Para 18 3
Time Warner Cable System
Requirements, Specification 01
00 00 Para 19 6 6
Onsite Daily Supervisor
Electrician Qualififcations, Specification Section 01 00 00
Para 20
Licensed electricians requirement, Specification
Section 01 00 00 Para 21
Certificates of insurance, Specification Section 01 00 05 3
Surety bonds, Specification
Section 01 00 05 3
List of proposed subcontractors, Specification Section 01 00 05 3
List of proposed products as indicated in each Specification
Sectionificaiton, Specification
Section 01 00 05
Certificates of insurance, Specification Section 01 00 05 3
Construction Progress Schedule, Specification Section 01 00 05 3
12 Schedule of prices 01 00 05 3
Health and safety plan, Specification Section 01 00 05 3
Work plan, Specification Section
01 00 05 7
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
AF Form 66 (Computer Generated) Page 1 of 22
FA4809-16-B-0001
Attachment 5 Page 1 of 22
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Quality control plan , Specification Section 01 00 05 3
Environmental protection plan , Specification Section 01 00 05 3
Shop Drawings as indicated in each specification section and
Specification Section 01 00 05
Product Data as indicated in each specification section and
Specifcation Section 01 00 05
Design Data as indicated in each specification section and
Specifcation Section 01 00 05
Test Reports as indicated in each specification section and
Specifcation Section 01 00 05
Daily checklists as indicated in each specification section and
Specifcation Section 01 00 05
Final acceptance test and operational test procedure as indicated in each specification section and Specifcation Section
01 00 05
Confined space entry permits as indicated in each specification section and Specifcation Section
01 00 05
Material Safety Data as indicated in each specification section and
Specifcation Section 01 00 05
Factory test reports as indicated in each specification section and
Specifcation Section 01 00 05
AF Form 66 (Computer Generated) Page 2 of 22
Attachment 5 Page 2 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Maintenance Manuals as indicated in each specification section and Specifcation Section
01 00 05
Unit Prices, Specifcation Section
01 02 60 6
Utility Outage Requests, Specifcation Section 01 11 00 3
Utility Connection Requests, Specifcation Section 01 11 00 3
Borrow Permits, Specifcation
Section 01 11 00 3
Excavation Permits, Specifcation
Section 01 11 00 3
Welding Permits, Specifcation
Section 01 11 00 3
33 Burning Permits 01 11 00 3
Energy Performance Rating 01
11 00 Section 6
Project Scheduler Qualifications
01 32 01.00 10 Para 1.3 3
Preliminary Project Schedule, Specifcation Section 01 32 01.00
Initial Project Schedule, Specifcation Section 01 32 01.00
10 Para 3.2.1
Submittal Register, Specifcation
Section 01 33 00 Para 1.8 3
Accident Prevention Plan (APP), Specifcation Section 01 35 26
Para 1.6
AF Form 66 (Computer Generated) Page 3 of 22
Attachment 5 Page 3 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Activity Hazard Analysis (AHA), Specifcation Section 01 35 26
Para 1.7
Crane Critical Lift Plan, Specifcation Section 01 35 26
Para 1.6.1
Crane Operators, Specifcation
Section 01 35 26 Para 1.5.1.2 3
Notifications and Reports, Specifcation Section 01 35 26
Para 1.11
Accident Reports, Specifcation
Section 01 35 26 Para 1.11.2 6
Crane Reports, Specifcation
Section 01 35 26 Para 1.11.3 6
Confined Space Entry Permit, Specifcation Section 01 35 26
Para 1.8
Hot work permit, Specifcation
Section 01 35 26 Para 1.8 6
License Certificates, Specifcation
Section 01 35 26 6
QC Plan, Specifcation Section
01 45 00.10 20 Para 1.6 3
Construction site plan, Specifcation Section 01 50 00
Para 1.3
Traffic control plan, Specifcation
Section 01 50 00 Para 3.3.1 3
Backflow Preventer Tests, Specifcation Section 01 50 00
Para 2.2.5
Backflow Tester, Specifcation
Section 01 50 00 Para 1.4.1 6
AF Form 66 (Computer Generated) Page 4 of 22
Attachment 5 Page 4 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Backflow Preventers, Specifcation Section 01 50 00
Para 1.4
Temporary Power Distribution
Sketch, Specifcation Section 01
51 10 Para 4.4
Notice of Intent, Specifcation
Section 01 56 00 3
Letter of Approval, Specifcation
Section 01 56 00 3
Storm Water Pollution
Prevention Plan, Specifcation
Section 01 56 00
Post-Construction Maintenance
Plans, Specifcation Section 01
56 00
Certificate of Approval, Specifcation Section 01 56 00 6
Certificate of Termination, Specifcation Section 01 56 00 6
Environmental Management
System Awareness Training, Specifcation Section 01 56 00
Contractor Hazardous Material
Inventory Log (AF Form 3952)
01 56 00
Solid Waste Diversion Report 01
56 00 Section 3
Certificates of insurance 01 57
00 3
Surety bonds, Specifcation
Section 01 57 00 3
List of proposed subcontractors, Specifcation Section 01 57 00 3
AF Form 66 (Computer Generated) Page 5 of 22
Attachment 5 Page 5 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
List of proposed products, Specifcation Section 01 57 00 3
Construction Progress Schedule, Specifcation Section 01 57 00 3
Schedule of prices, Specifcation
Section 01 57 00 3
Health and safety plan, Specifcation Section 01 57 00 3
Work plan, Specifcation Section
01 57 00 Section 3
Quality control plan, Specifcation
Section 01 57 00 Section 3
Environmental protection plan, Specifcation Section 01 57 00 3
Daily checklists, Specifcation
Section 01 57 00 6
Final acceptance test and operational test procedure, Specifcation Section 01 57 00
Confined space entry permits, Specifcation Section , Specifcation Section 01 57 00
Material Safety Data, Specifcation Section 01 57 00 6
Factory test reports , Specifcation Section 01 57 00 6
Preconstruction Survey, Specifcation Section 01 57 19.00
20 Para 1.5.1
Storm Water Pollution
Prevention Plan, Specifcation
Section 01 57 19.00 20 Para
AF Form 66 (Computer Generated) Page 6 of 22
Attachment 5 Page 6 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Storm Water Notice of Intent (for
NPDES coverage under the general permit for construction activities), Specifcation Section
01 57 19.00 20 Para 3.1.2.1
Dirt and Dust Control Plan , Specifcation Section 01 57 19.00
20 Para 3.10.1
Contractor Hazardous Material
Inventory Log, Specifcation
Section 01 57 19.00 20 Para
3.5.1
Erosion and Sediment Control
Inspection Reports, Specifcation
Section 01 57 19.00 20 Para
3.1.2
Storm Water Inspection Reports for General Permit, Specifcation
Section 01 57 19.00 20 Para
3.1.2
Contractor 40 CFR employee training records, Specifcation
Section 01 57 19.00 20 Para
1.5.4
ECATTS certificate of completion, Specifcation Section
01 57 19.00 20 Para 1.4.1
Storm Water Pollution
Prevention Plan compliance notebook, Specifcation Section
01 57 19.00 20 Para 3.1.2.2
Contractor 40 CFR Employee
Training Records, Specifcation
Section 01 57 19.00 20 Para
1.5.4
AF Form 66 (Computer Generated) Page 7 of 22
Attachment 5 Page 7 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Contractor Hazardous Material
Inventory Log, Specifcation
Section 01 57 19.00 20 Para
3.5.1
Hazardous Waste/Debris
Management, Specifcation
Section01 57 19.00 20 Para
Preliminary one line, Specifcation Section 01 58 00 6 preliminary drawing indicating layout and text content, Specifcation Section 01 58 00
Sign Legend Orders, Specifcation Section 01 58 00 6
As-Built Record of Equipment and Materials, Specifcation
Section 01 78 00
Spare Parts Data, Specifcation
Section 01 78 00 Para1.4 6
Preventative Maintenance, Specifcation Section 01 78 00
Para 1.5
Condition Monitoring (Predictive
Testing), Specifcation Section 01
78 00 Para 1.5
Inspection, Specifcation Section
01 78 00 Para 1.5 6
Instructions, Specifcation Section
01 78 00Section 6
Operation and Maintenance
Manuals , Specifcation Section
01 78 00 Para 1.7
Record Drawings , Specifcation
Section 01 78 00 Para 1.3.1 3
AF Form 66 (Computer Generated) Page 8 of 22
Attachment 5 Page 8 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
GIS Requirements and Updates, Specifcation Section 01 78 00
Para 1.3.1.5
Certification of EPA Designated
Items , Specifcation Section 01
78 00 Para 1.6
Interim Form DD1354, , Specifcation Section 01 78 00
Para 1.9
Checklist for Form DD1354, , Specifcation Section 01 78 00
Para 1.9
Demolition Plan , Specifcation
Section 02 41 00 Para 1.2.1 3
Existing Conditions , Specifcation Section 02 41 00
Para 1.9 3
Receipts , Specifcation Section
02 41 00Section 3
Air-Entraining Admixture03 30 53
Para 2.2.2.1 6
Mix Design Data03 30 53 Para
2.3 6
Ready-Mix Concrete03 30 53
Para 2.3 6
Compressive Strength Testing03
30 53 Para 3.8.3 6
115 Slump03 30 53 Para 3.8.3 6 116 Air Content03 30 53 Para 3.8.3 6
Quality Control Procedures03 40
00.00 10 Para 1.4.2.2 3
Standard Precast Units03 40
00.00 10 Para 1.2.1 6
Custom-Made Precast Units03
40 00.00 10 Para 1.2.2 6
AF Form 66 (Computer Generated) Page 9 of 22
Attachment 5 Page 9 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Standard Precast Units03 40
00.00 10 Para 1.2.1 6
Proprietary Precast Units03 40
00.00 10 Para 1.2.3 6
Embedded Items03 40 00.00 10
Para 3.1.3 6
Accessories03 40 00.00 10 Para
2.1.11 6
Design Calculations03 40 00.00
10 Para 1.2.2 6
Concrete Mix Proportions03 40
00.00 10 Para 1.2.5.1 6
Test Reports03 40 00.00 10
Para 1.4.2.4 6
Quality Control Procedures03 40
00.00 10 Para 1.4.2.2 6
Acceptance tests and inspections , Specifcation
Section 26 08 00 Para 3.1
Qualifications , Specifcation
Section 26 08 00 Para 1.4.1 7
Acceptance test and inspections procedure , Specifcation Section
26 08 00 Para 1.4.3
Substation Incoming Terminal
Cabinet Drawings , Specifcation
Section 26 11 16 Para 1.5.1.1
Acceptance checks and tests , Specifcation Section 26 11 16
Para 3.6.1
Paint coating system , Specifcation Section 26 11 16
Para 1.5.2
AF Form 66 (Computer Generated) Page 10 of 22
Attachment 5 Page 10 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Pad-mounted transformer drawings , Specifcation Section
26 12 19.10 Para 1.5.1
Pad-mounted transformers , Specifcation Section 26 12 19.10
Para 2.2
Acceptance checks and tests , Specifcation Section 26 12 19.10
Para 3.6.1
Transformer Efficiencies , Specifcation Section 26 12 19.10
Para 2.2.2.1 design tests , Specifcation
Section 26 12 19.10 Para 2.8.2 6 routine and other tests , Specifcation Section 26 12
19.10Para 2.8.3
Transformer(s) , Specifcation
Section 26 12 19.10 Para 1.6.1 3
Transformer test schedule , Specifcation Section 26 12 19.10
Para 2.8.1
Pad-mounted transformer drawings , Specifcation Section
26 12 21 Para 1.5.1
Single-phase pad-mounted transformers (dead-front) , Specifcation Section 26 12 21
Para 2.2
Acceptance checks and tests , Specifcation Section 26 12 21
Para 3.6.1
Transformer efficiencies , Specifcation Section 26 12 21
Para 2.2.2.1
AF Form 66 (Computer Generated) Page 11 of 22
Attachment 5 Page 11 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G design tests , Specifcation
Section 26 12 21 Para 2.10.3 6 routine and other tests , Specifcation Section 26 12
21Section2.10.4
Transformer(s) , Specifcation
Section 26 12 21 Para 1.6.1 3
Transformer test schedule , Specifcation Section 26 12 21
Para 2.10.1
Switchgear Drawings , Specifcation Section 26 13 00
Para 1.5.1
Electronic Overcurrent Control
Curves , Specifcation Section 26
13 00Para 1.5.3
Pad-Mounted Fluid Insulated
Vacuum Switchgear , Specifcation Section 26 13 00
Para 1.6.1
Pad-Mounted Fluid Insulated
Vacuum Switchgear , Specifcation Section 26 13 00
Para 2.1
Insulated High-Voltage
Connectors , Specifcation
Section 26 13 00 Para 2.2
Surge Arresters , Specifcation
Section 26 13 00 Para 2.3 6
Acceptance Checks and Tests , Specifcation Section 26 13 00
Para 3.4.1
Paint Coating System , Specifcation Section 26 13 00
Para 1.5.2
AF Form 66 (Computer Generated) Page 12 of 22
Attachment 5 Page 12 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Switchgear design and production tests , Specifcation
Section 26 13 00 Para 2.4.1
Pad-Mounted Fluid Insulated
Vacuum Switchgear , Specifcation Section 26 13 00
Para 1.6.1
Pad-Mounted Fluid Insulated
Vacuum Switchgear , Specifcation Section 26 13 00
Para 2.1
Switchgear Drawings , Specifcation Section 26 13 01
Para 1.5.1
Fuse Time-Current
Characteristic Curves , Specifcation Section 26 13 01
Air Insulated Pad-mounted
Switchgear , Specifcation
Section 26 13 01 Para 2.1
Insulated High-Voltage
Connectors , Specifcation
Section 26 13 01
Surge Arresters , Specifcation
Section 26 13 01 Para 2.2 6
Acceptance Checks and Tests , Specifcation Section 26 13 01
Para 3.4.1
Paint Coating System , Specifcation Section 26 13 01
Para 1.5.2
Switchgear design and production tests , Specifcation
Section 26 13 01 Para 2.4.1
AF Form 66 (Computer Generated) Page 13 of 22
Attachment 5 Page 13 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Air Insulated Pad-Mounted
Switchgear Operation and
Maintenance , Specifcation
Section 26 13 01 Para 1.6.1
Panelboards , Specifcation
Section 26 20 00 Para 2.10 6
Wireways , Specifcation Section
26 20 00 6
Circuit breakers , Specifcation
Section 26 20 00 Para 2.10.3 6
Switches , Specifcation Section
26 20 00 Para 2.8 7
Enclosed circuit breakers , Specifcation Section 26 20 00
Para 2.11
Surge protective devices , Specifcation Section 26 20 00
Para 2.17
600-volt wiring test , Specifcation
Section 26 20 00 Para 3.4.2 6
Grounding system test , Specifcation Section 26 20 00
Para 3.4.4
178 Shoring31 00 00 Para 3.5 3
Dewatering Work Plan31 00 00
Para 1.6.3 3
Utilization of Excavated
Materials31 00 00 Para 3.9 6
Rock Excavation31 00 00 Para
1.6.1.2 6
Opening of any Excavation or
Borrow Pit31 00 00 Para 3.4 6
183 Testing31 00 00 Para 3.16 6
AF Form 66 (Computer Generated) Page 14 of 22
Attachment 5 Page 14 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Borrow Site Testing31 00 00
Para 2.1 6
185 Testing31 00 00 Para 3.16 6
Nonsaleable Materials31 11 00
Para 3.5.2 6
Tree wound paint31 11 00 Para
2.1 1
188 Herbicide31 11 00 Para 2.2 1
Integrated Pest Management
Plan, Specifcation Section 32 05
33 Para 2.4
Local/Regional Materials, Specifcation Section 32 05 33
Para 1.6.1
Fertilizer, Specifcation Section
32 05 33 Para 2.1 6
Mulches Topdressing, Specifcation Section 32 05 33
Para 2.3
Organic Mulch Materials, Specifcation Section 32 05
33Section2.3.1
Maintenance inspection report, Specifcation Section 32 05 33
Para 3.5.1
Plant quantities, Specifcation
Section 32 05 33 Para 3.5.2 6
Maintenance, Specifcation
Section 32 05 33 Para 1.7 3
Tree, staking and guying removal, Specifcation Section 32
05 33 Para 3.5.3
AF Form 66 (Computer Generated) Page 15 of 22
Attachment 5 Page 15 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Plant, Equipment, and Tools, Specifcation Section 32 11 23
Para 2.1
Waybills and Delivery Tickets, Specifcation Section 32 11 23
Para 1.1.4
Sampling and Testing, Specifcation Section 32 11 23
Para 1.5
Field Density Tests, Specifcation
Section 32 11 23 Para 1.5.2.4 6
Job-Mix Formula (JMF), Specifcation Section 32 11 , Specifcation Section 26Para
2.5.1
Waybills and delivery tickets, Specifcation Section 32 11 , Specifcation Section 26 Para
1.1.3
Sources of Aggregates, Specifcation Section 32 11 , Specifcation Section 26 Para
2.2.5
Sources of Aggregates, Specifcation Section 32 11 , Specifcation Section 26 Para
2.2.5
Sources of Aggregates, Specifcation Section 32 11 , Specifcation Section 26 Para
2.2.5
Bituminous Materials, Specifcation Section 32 11 , Specifcation Section 26 Para 2.3
AF Form 66 (Computer Generated) Page 16 of 22
Attachment 5 Page 16 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Sampling and testing, Specifcation Section 32 11 , Specifcation Section 26 Para
1.4.1
Waybills and Delivery Tickets, Specifcation Section 32 12 10
Para 1.1.3
Local/Regional Materials, Specifcation Section 32 12 10
Para 1.4
Sampling and Testing, Specifcation Section 32 12 10
Para 3.7
Bituminous pavement, Specifcation Section 32 12 17
Para 1.3.2
Job-mix formula, Specifcation
Section 32 12 17 Para 1.3.3 6
ASPHALT CEMENT BINDER,
Specifcation Section 32 12 17
Para 2.2
MIX DESIGN, Specifcation
Section 32 12 17 Para 2.3 6
Specific gravity test of asphalt, Specifcation Section 32 12
17Section2.5.1
Coarse aggregate tests, Specifcation Section 32 12 17
Para 2.5.1
Weight of slag test, Specifcation
Section 32 12 17 Para 2.5.1 6
Percent of crushed pieces in gravel, Specifcation Section 32
12 17Section2.5.1
AF Form 66 (Computer Generated) Page 17 of 22
Attachment 5 Page 17 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Fine aggregate tests, Specifcation Section 32 12 17
Para 2.5.1
Specific gravity of mineral filler, Specifcation Section 32 12
17Section2.5.1
Bituminous mixture tests, Specifcation Section 32 12 17
Para 2.5.1
Aggregates tests, Specifcation
Section 32 12 17 Para 3.5.2.1 6
Bituminous mix tests, Specifcation Section 32 12 17
Para 3.5.2.2
Pavement courses, Specifcation
Section 32 12 17 Para 3.5.2.3 6
Curing materials, Specifcation
Section 32 13 13.06Section2.1.6 6
Admixtures, Specifcation Section
32 13 13.06 Para 2.1.4 6
Dowel, Specifcation Section 32
13 13.06 Para 2.1.5.1 6
Reinforcement, Specifcation
Section 32 13 13.06 Para 2.1.5.4 6
Field-Constructed Mockup, Specifcation Section 32 13 13.06
Para 1.6.5 mix design, Specifcation Section
32 13 13.06Section2.3 6
Aggregate, Specifcation Section
32 13 13.06 Para 2.1.3 6
Concrete slump tests, Specifcation Section 32 13
13.06Section3.7.2
AF Form 66 (Computer Generated) Page 18 of 22
Attachment 5 Page 18 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Air content tests, Specifcation
Section 32 13 13.06 Para 3.7.4 6
Flexural strength tests, Specifcation Section 32 13 13.06
Para 3.7.3
Cementitious materials, Specifcation Section 32 13 13.06
Para 2.1.1
Ready-mixed concrete plant, Specifcation Section 32 13
13.06Section1.6.1
Batch tickets, Specifcation
Section 32 13 13.06 Para 1.6.4 6
Cementitious materials, Specifcation Section 32 13
13.06Section2.1.1
Concrete, Specifcation Section
32 16 13 Para 2.1 6
Field Quality Control32 16
13Section3.8 6
Microtunneling Boring Machine, Specifcation Section 33 05 23.19
Para 3.2.3
Piping casing, Specifcation
Section 33 05 23.19Section2.1 6
Bentonite, Specifcation Section
33 05 23.19 Para 2.3 6
Piping casing, Specifcation
Section 33 05 23.19Section2.1 6
Installation, Specifcation Section
33 05 23.19 Para 3.2 6
Conductors, Specifcation Section
33 71 01Section2.6 6
AF Form 66 (Computer Generated) Page 19 of 22
Attachment 5 Page 19 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Insulators, Specifcation Section
33 71 01 Para 2.5 6
Wood Poles, Specifcation
Section 33 71 01Section2.2.1 6
Cutouts, Specifcation Section 33
71 01 Para 2.12 6
Surge arresters, Specifcation
Section 33 71 01Section2.11 6
Guy strand, Specifcation Section
33 71 01 Para 2.7 6
Anchors, Specifcation Section 33
71 01Section2.9 6
Power-Installed Screw
Foundations, Specifcation
Section 33 71 01
Wood Crossarm Inspection
Report, Specifcation Section 33
71 01 Para 1.5.4
Field Test Plan, Specifcation
Section 33 71 01 Para 1.5.4.1 6
Field Quality Control, Specifcation Section 33 71 01
Para 3.4
Ground resistance test reports, Specifcation Section 33 71 01
Para 1.5.3
Wood poles, Specifcation
Section 33 71 01 Para 2.2.1 6
Wood crossarms, Specifcation
Section 33 71 01 Para 2.3.1 6 routine and other tests, Specifcation Section 33 71 01 7
AF Form 66 (Computer Generated) Page 20 of 22
Attachment 5 Page 20 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Precast underground structures, Specifcation Section 33 71 02
Para 1.5.1
Medium voltage cable, Specifcation Section 33 71 02
Para 2.5
Medium voltage cable joints, Specifcation Section 33 71 02
Para 2.7
Medium voltage cable terminations, Specifcation
Section 33 71 02 Para 2.6
Live end caps, Specifcation
Section 33 71 02 Para 2.8 6
Precast concrete structures, Specifcation Section 33 71
02Section2.13.2.1
Sealing Material, Specifcation
Section 33 71 02 Para 2.13.2.4 6
Pulling-In Irons, Specifcation
Section 33 71 02 Para 3.5.3 6
Manhole frames and covers, Specifcation Section 33 71
02Section2.13.3
Handhole frames and covers, Specifcation Section 33 71 02 6
Composite/fiberglass handholes, Specifcation Section 33 71 02
Para 2.13.4
Cable supports, Specifcation
Section 33 71 02 Para 2.14 6
Medium voltage cable qualification and production tests, Specifcation Section 33 71
02 Para 2.17.2
AF Form 66 (Computer Generated) Page 21 of 22
Attachment 5 Page 21 of 22
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
REPAIR OVERHEAD AND
UNDERGROUND ELECTRICAL LINES
Solicitation/Contract Number
FA4809-16-B-0001SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
VKAG 14-1034
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
Field Acceptance Checks and
Tests, Specifcation Section 33
71 02 Para 3.18.1
Arc-proofing test, Specifcation
Section 33 71 02 Para 2.17.1 6
Cable Installation Plan and
Procedure, Specifcation Section
33 71 02 Para 3.3
Cable splicer/terminator, Specifcation Section 33 71
02Section1.5.2
Cable Installer Qualifications, Specifcation Section 33 71 02
Para 1.5.3
Certificate of Conformance, Specifcation Section 33 71
02Section1.5.4
36 71 02 SECTION 06 FIELD
ACCEPTANCE CHECKS AND
TESTS
36 71 02 SECTION 06 ARC-
PROFING TEST 6
36 71 02 SECTION 06 CABLE
INSTALLATION PLAN AND
PROCEDURE
36 71 02 SECTION 07 CABLE
SPLICERS/TERMINATOR 6
36 71 02 SECTION 07 CABLE
INSTALLER QUALIFICATIONS 6
36 71 02 SECTION 07
CERTIFICATE OF
CONFORMANCE
AF Form 66 (Computer Generated) Page 22 of 22
Attachment 5 Page 22 of 22