Amendment_01.doc
DOC document 44 KB Posted
- Attached to
- Repair Overhead and Underground Electrical Lines Federal contract opportunity
- Solicitation number
- FA4809-16-B0001-Synopsis
About this file
Amendment/Extension of Bid closing and opening date
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers__3.doc | DOC document | |
| Questions_and_Answers__2.doc | DOC document | |
| Amendment_02.doc | DOC document | |
| Questions_and_Answers.doc | DOC document | |
| Attendance_Sheet.pdf | ||
| Site_Visit_Minutes.doc | DOC document | |
| Site_Visit_Minutes.doc | DOC document | |
| FA4809-16-B-0001_Attach_7_Addendum_Rev_1.doc | DOC document | |
| FA4809-16-B-0001_Solicitation_Released.doc | DOC document | |
| FA4809-16-B-0001_Attach_2_Phase_1_Dwg_(Rev_5_Feb_16).pdf | ||
| FA4809-16-B-0001_Attach_5_AF_66.pdf | ||
| FA4809-16-B-0001_Attach_4_Local_Instruc.pdf | ||
| FA4809-16-B-0001_Attach_6_Pass_Request.pdf | ||
| FA4809-16-B-0001_Attach_3_WD.docx | DOCX document | |
| FA4809-16-B-0001_Attach_1_Specifications.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 01
A. Attachment 1, Section 01 00 00, page 6, paragraph 19., delete paragraph and replace with the following:
“19. Time Warner Cable System Requirements: There is an existing cable television system located on the power poles. The power poles are to be removed which will require the cable television system to be relocated underground. This cable television system is owned by Time Warner Cable. The Contractor shall remove this cable television system and provide an underground cable television system as follows: The preferred Contractor shall be Time Warner Cable. Time Warner Cable shall remove their overhead communications cabling network system from the power poles and locate underground. Time Warner Cable is aware of this project and its affect to their cable system. The Contractor shall pay all fees and charges and expenses to have Time Warner Cable remove their system from the power poles and provide their cabling system underground.”
B. Attachment 2, Remove Electrical General Note 32 on drawing ES-001A and replace with the following:
“32. Time Warner Cable System Requirements: There is an existing cable television system located on the power poles. The power poles are to be removed which will require the cable television system to be relocated underground. This cable television system is owned by Time Warner Cable. The Contractor shall remove this cable television system and provide an underground cable television system as follows: The preferred Contractor shall be Time Warner Cable. Time Warner Cable shall remove their overhead communications cabling network system from the power poles and locate underground. Time Warner Cable is aware of this project and its affect to their cable system. The Contractor shall pay all fees and charges and expenses to have Time Warner Cable remove their system from the power poles and provide their cabling system underground.”
C. Sealed bids and 1 copy to perform the work required are due by 03:00 PM est on 27 Apr 16. Bids must be submitted to the location specified in section 8 on the first page of the solicitation. The location for the bid opening will be held at the Wayne Community College at 04:00 PM est on 27 Apr 16 in the Walnut Building (Room 101, first floor).
D. All other terms and conditions remain unchanged.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 21-Apr-2016 03:00 PM to 27-Apr-2016 03:00 PM.
(End of Summary of Changes)