FA4809-16-B-0001_Attach_1_Specifications.pdf

PDF 14 MB Posted

Attached to
Repair Overhead and Underground Electrical Lines Federal contract opportunity
Solicitation number
FA4809-16-B0001-Synopsis
Issued by
Department of the Air Force Air Combat Command

About this file

Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Repair Overhead and Underground Electrical Lines, newest first.
File Type Posted
Questions_and_Answers__3.doc DOC document
Amendment_02.doc DOC document
Questions_and_Answers__2.doc DOC document
Amendment_01.doc DOC document
Questions_and_Answers.doc DOC document
Attendance_Sheet.pdf PDF
Site_Visit_Minutes.doc DOC document
Site_Visit_Minutes.doc DOC document
FA4809-16-B-0001_Attach_4_Local_Instruc.pdf PDF
FA4809-16-B-0001_Attach_6_Pass_Request.pdf PDF
FA4809-16-B-0001_Attach_3_WD.docx DOCX document
FA4809-16-B-0001_Attach_7_Addendum_Rev_1.doc DOC document
FA4809-16-B-0001_Solicitation_Released.doc DOC document
FA4809-16-B-0001_Attach_2_Phase_1_Dwg_(Rev_5_Feb_16).pdf PDF
FA4809-16-B-0001_Attach_5_AF_66.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Seymour-Johnson AFB Contract Number: FA4809-16-B-0001 Invitation for Bid Project Number: VKAG 14-1034 (Electrical Design Only) Project Title: Repair Overhead and Underground Electrical

Lines Basewide

Specifications 100% Corrected Final Design Submittal

Volume 1 of 3

9 December 2015

Prepared for:

Department of the Air Force Seymour-Johnson AFB, NC

Department of the Air Force 4 Civil Engineering Squadron 1095 Peterson Avenue Seymour-Johnson AFB, NC 27531

Prepared by:

AECOM

11832 Rock Landing Drive, Suite 306 Newport News, VA 23606 www.aecom.com

AECOM

9755 Patuxent Woods Drive, Suite 300 Columbia, MD 21046 www.aecom.com

FA4809-16-B-0001

Attachment 1 Page 1 of 652

1039508750A Typewritten Text

1039508750A Typewritten Text

1039508750A Typewritten Text

FA4809-16-B-0001

Attachment 1 Page 2 of 652

Attachment 1 Page 3 of 652

Attachment 1 Page 4 of 652

Repair Overhead And Underground Electrical Lines VKAG141034

SECTION 01 00 00 PAGE 1

SECTION 01 00 00

GENERAL

1. SCOPE OF WORK: The work covered by this specification consists of furnishing all plant, labor, equipment and material, and performing all work in connection with the VKAG 14-1034, Repair Overhead and Underground Electrical Lines in strict accordance with the Contract, specifications and drawings and subject to the terms and conditions of this contract.

2. LOCATION: The work is to be accomplished at Seymour Johnson Air Force Base, Goldsboro, North Carolina. This base is accessible by public highway.

3. WORKWEEK: The contractor shall observe the same regular workweek being observed by the Seymour Johnson AFB Civil Engineering shop forces, which is Monday through Friday, 7:30 am to 4:30 pm, with Federal holidays excluded.

Contact Contracting Officer for 2016 Federal Holidays. Any deviation from this schedule shall require 48 hours advance notice and approval of the Contracting Officer.

4. PRINCIPLE FEATURES: The work covered by this contract includes, but is not limited to the following:

a. Repair Overhead And Underground Electrical Lines:

Phase 1 Base Bid – Areas 1 through 8 up to the pad mounted switch titled PMS3- 62 on drawing number ES-108 and areas 16 through 19. The work associated with these areas is shown on drawing sheets:

ES-101/ES-201 to ES-108/ES-208, ES-116/ES-216 to ES-119/ES-219, and all work as indicated and required in the Plans and Specifications.

Phase 2 Base Bid – Areas 8 through 15. The phase 2 base bid begins at the pad mounted switch titled PMS3-62 on drawing number ES-108 and ends at pole C74A on drawing ES-114. The phase 2 base bid also includes all construction shown on drawing ES-115. The work associated with these areas is shown on drawing sheets:

ES-108/ES-208 to ES-114/ES-214, ES-115/ES-215, and all work as indicated and required in the Plans and Specifications.

Note: See Specification Section 01 02 60 Unit Prices and Estimated Quantity Items for description of Unit Price Items.

General

The general work is as indicted on the drawings and as indicated in the specifications. In general, the work consist of converting overhead electrical system to an underground electrical system, repairs to the underground electrical system, upgrades by replacement to parts of the underground system.

5. HAUL ROUTES: The Contractor shall use the haul routes indicated on the plans from project site(s) to on/off base.

6. DISPOSITION OF NONSALVABLE MATERIALS: All non-salvable or unusable material shall be disposed of off base by the contractor, as directed by the Contracting Officer. All waste material generated by any work under this contract shall be handled, transported, stored, and disposed of off base, by the Contractor, in accordance with all applicable federal, state, or local laws, ordinances, regulations, court orders, or other types of rules or rulings having the effect of law.

Attachment 1 Page 5 of 652

SECTION 01 00 00 PAGE 2

7. DISPOSITION OF SALVAGEABLE MATERIALS: The Contractor shall be required to furnish an itemized listing of materials to be salvaged to the Base Civil Engineering material Control section, located in Bldg 3300, so that an AF Form 1348-1 can be obtained. After receiving this form, all salvable or reusable material will be delivered to the Defense Reutilization and Marketing Office (DRMO), which is located near Bldg 2620 or as directed by Contracting Officer.

It should be noted that DRMO will only be open for one day per week. The contractor shall safely store all salvageable materials and schedule the delivery of them on the appropriate day of the week.

8. SUBMITTALS REQUIRED: Required submittals are listed on AF Form 66.

Contractor shall allow 15 calendar days for the government to review.

9. BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST, AF FORM 103: The Contractor shall obtain AF Form 103(obtain AF Form 103 from Base Civil Engineering), Base Civil Engineering Work Clearance Request, prior to work commencement from the Contract Management Section in Bldg 3300, 1095 Peterson Avenue. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum as well as identify potentially hazardous work conditions. The contractor shall be responsible to process the AF Form 103 with guidance from the Contract Management Section. This form shall be processed prior to the start of work.

Upon receipt of an AF Form 103, the Contractor shall be responsible for locating all underground utilities as well as coordinating local utility companies, if not owned by the Base. Utilities include, but are not limited to electric, water, sewer, steam, communication, telephone, fiber optic, cathodic protection, and fuel lines. Utilities not owned by the base include, but are not limited to Cable TV, Bell South Telephone Co., and NC Natural Gas.

Historical drawings, as-built drawings, and topographic drawings, the accuracy of which the government does not guarantee, are available for research and review at the 4th Civil Engineer Squadron, Design element located in Building 3300.

Contractor shall provide a map/drawing to SJAFB with locations and coordinates of pole location (pdf, AutoCAD, one drawing at small scale or multiple drawings with a key map and a title sheet).

Upon approval of AF 103 contact all individuals on the form in Base Civil Engineering, Security Police, Safety, Communications, Base Operations, Cable TV and Commercial Utility Companies to notify them of work to be done and schedule.

The contractor shall promptly repair/replace contractor damaged utilities at no additional cost to the Government. The repair/replacement shall be accomplished in a manner that is acceptable to and approved by the Government.

10.SAFETY: All safety requirements of the U.S. Army Corps of Engineers Safety Manual 385-1-1 dated 3 November 2003 will be strictly adhered to as related to all work covered under these specifications.

11.MATERIALS CONTAINING ASBESTOS: In the event the Contractor discovers materials suspected of containing asbestos that is not identified to be removed in the plans and specifications, the Contractor shall notify the Contracting Officer. The Contractor’s work shall proceed unless the materials suspected of containing asbestos are damaged or disturbed. Any suspected materials damaged or disturbed by the Contractor without permission from the Contracting Officer shall be removed by the Contractor at his expense IAW all applicable Federal, State, and local laws, ordinances, regulations, court orders, or other types of rules or rulings having the effect of law.

12.LABELING OF STORAGE DRUMS: All 55 gallon or larger drums brought on base for use under this contract and containing new material or used for storage of waste materials or hazardous waste must be labeled with a Department of Transportation (DOT) Proper Shipping Name, DOT Hazardous Identification Number, the Contractor’s name, a Contractor representative, and the

Attachment 1 Page 6 of 652

SECTION 01 00 00 PAGE 3

Contractor’s telephone number. Label lettering should have a minimum height of one half inch painted in white paint or other color that is in contrast with the color of the drum. The label should be sufficiently durable to equal or exceed the life (including storage and disposal) of the drum.

13.CONTRACTOR STORAGE TRAILER(S) AND BUILDING(S): The Contractor shall place or paint a sign on all of his storage trailer(s) and building(s) used on this contract. At a minimum, the sign shall contain the name of the Contractor and a telephone number at which the Contractor can be reached. The trailer(s) and building(s) shall be complete with gates and/or doors which can be locked.

Only material for this project shall be stored in the trailer(s) or building(s). The Contractor shall remove the storage trailer(s) or building(s) within 30 days after completion of the contract and prior to submitting his final invoice. The area around the storage trailer(s) and building(s) shall be kept clean. This includes the mowing of grass during the growing season. The lawn mower shall be supplied by the Contractor. The Contractor will be given a lot in the Contractor Storage Area for the life of the contract. The Contractor’s progress schedule shall include a line item for final cleanup of this storage lot. Final payment will not be made until this final cleanup is performed by the Contractor and accepted by Seymour Johnson AFB.

14.CONVENIENCE FACILITIES: Existing restroom facilities shall not be used by construction personnel. The contractor shall provide and maintain, in a neat and sanitary condition, such accommodations, as portable toilets, for the use of his employees.

15. CONSTRAINTS:

15.1 Airfield driver training is required for Contractor personnel to access the airfield. Contractor shall contact Airfield Management and the Deputy Airfield Manager thru Contracting Officer at least 60 days prior to operating on the airfield to obtain the appropriate and current airfield driving material to review and study. When ready, Contractor shall contact Airfield Management to schedule date and time for briefing and testing. Airfield Management requires at least 2 weeks’ notice to schedule airfield driver briefings and testing. Airfield work is restricted to authorized personnel only. All contractor personnel shall obtain on airfield driver's license from Airfield Management prior to on-site work on the airfield. An airfield driver's license is required for personnel that will be driving on the taxiways, or aprons in accordance with SJAFB 13-213. All contractor personnel shall have on their person a picture type ID card (Driver’s License, etc.) at all times. Contact Deputy Airfield Manager TSgt Bonney at 919-722-2491 concerning airfield driving training.

15.2 Contractor shall keep all equipment, tools and materials stored in a neat and orderly manner inside the contractor storage area when not in use.

15.3 Contractor shall provide continual clean-up of all work areas on the base (not just airfield locations) to ensure that no FOD (Foreign Object Debris) is allowed on the existing taxiways or airfield. Also, immediate and thorough cleaning of the airfield, taxiway and apron after all demolition shall be performed. Contractor shall furnish and operate a truck-mounted vacuum sweeper, similar to airfield type vacuums, on all portions of the airfield/taxiway/apron/haul routes/etc., affected by the work, continuously.

15.4 Any material (soil) that is suspected of containing petroleum or other hazardous products shall be reported to the Contracting Officer, or designated representative. Contaminated soil that is considered excess shall be disposed of by the contractor IAW all applicable local, state, and environmental regulations.

15.5 Privately owned vehicles used by the contractor personnel to commute to work are required to park in the contractor’s storage area. Tracking of mud, dirt, etc., on base streets and parking lots will not be tolerated. The

Attachment 1 Page 7 of 652

SECTION 01 00 00 PAGE 4

contractor immediately upon detection of debris or notification by the Contracting Officer or Representative of debris shall clean roads.

15.6 Contractor shall at all times protect and preserve the property of the Government which is within the work area and could be affected by the accomplishment of work specified and indicated, and all parties and individuals within or near the work areas who would be endangered by the work.

15.7 When night operations are to be conducted by the Contractor, all necessary lighting shall be furnished by the Contractor. Notify Contracting Officer and Airfield Management 48 hours in advance and receive approval prior to night operations. Lighting shall be shaded or directed so as not to interfere with aircraft or control operations. All inspections of night work, for acceptance purposes, shall be accomplished during daylight hours. Night operations or periods of low visibility or in areas 18, 19C and 19D shall comply with paragraph 15.13 e. of Section 01 00 00.

15.8 The Contractor shall maintain radio contact with the tower when required by Airfield Manager during airfield construction operations. The contractor shall provide at least one radio that is compatible to the tower frequency or shall provide at least two radios on a frequency that does not interfere with the tower frequency.

15.9 The representative of the Contracting Officer shall give their approval/final acceptance of all work accomplished by the Contractor.

15.10 Contractor is required to complete and comply with SJAFB Airfield Driving. Contractor is required to pass airfield driving training course to satisfaction of Contracting Officer. All personnel driving on taxiways or apron must be trained for project duration. Airfield driving must be completed each year, annually from issue date.

15.11 See Attachment 1 for reference documents:

SJAFB Instruction 13-213, 14 March 2013, Airfield Driving Instruction USAF Airfield Driving Computer Base Training Course Attachment 10, SJAFB Airfield Diagram Jet Blast Hazard, 9 April 2013 SJAFB Controlled Movement Area Training, 19 November 2012

15.12 Construction site is not located within a secure area. All contractor and subcontractor personnel shall carry an identification tag showing their picture and the name of the company they represent, and their base pass at all times. All vehicles operated by the contractor or subcontractors shall have visible identification showing name of represented company.

15.13 Construction Operations Information:

a. Contractor shall repair ruts and seed and establish growth on grass areas prior to project closeout to Contracting Officer’s satisfaction.

b. Restricted Area Boundary. Current work locations are not located near any restricted area boundaries; however, contractor shall not cross any red line that designates a restricted area boundary.

c. Construction Waiver. Contractor is required to coordinate with the Contracting Officer for the preparation and submittal of the temporary airfield construction waiver by the government for construction activities that violate governing criteria. Construction cannot start at project locations that violate governing criteria until construction waiver is approved and the FAA aeronautical study completed. Contractor shall submit Form 7460-1 (Notice of Construction) to FAA and 7460-2 (Project Completion) to the FAA via the website below. Submittal to the FAA is a minimum of 45 days prior to construction. Contractor shall provide screen shots of FAA notice submission, to include data input and maps, to the Contracting Officer for use in construction waiver approval process. Prior to the end of the contract, the

Attachment 1 Page 8 of 652

SECTION 01 00 00 PAGE 5

Contractor shall provide the same information to the Contracting Officer, who provides it to 4 CES/CENPL, Form 7460-2 (Project Completion) that is submitted to the FAA.

Governing regulations are UFC 3-260-01, Airfield Heliport Planning and Design and 14 CFR Part 77.9 https://oeaaa.faa.gov/oeaaa/external/portal.jsp.

d. Contractor shall coordinate work schedule with Contracting Officer for scheduled flight operations in advance of construction operations, and adjust work as necessary based on daily flight schedule without additional compensation.

e. Airfield constructions zones located in areas 18, 19C, 19D shall be marked and easily identifiable by using orange cones or other markers as approved by Airfield Management. During periods of low visibility or after dark, flashing yellow lights shall be used.

f. Contractor shall anticipate that all outages will occur on weekends or holidays.

16.PHASING/PERIOD OF PERFORMANCE:

16.1 Period of Performance

Allowance for Submittal/Material Delivery – 90 Days Actual Construction Period – 632 Days Total Construction Period – 722 Days

17.AFFIRMATIVE PROCUREMENT

17.1 The contractor shall incorporate Affirmative Procurement requirements as per 40 CFR, Part 247 and Executive Order 13423: Strengthening Federal Environmental, Energy and Transportation Management.” Any Environmental Protection Agency’s (EPA) Designated items used in the execution of this contract shall meet or exceed the EPA's requirements for recycled content materials (RCM) as per the EPA’s Comprehensive Procurement Guidelines (CPG).

The contractor shall ensure affirmative procurement requirements for CPG items are met or provide written justification that: 1) The price of a given designated item is unreasonably high, 2) There is inadequate competition (not enough sources of supply), 3) Unusual and unreasonable delays would result from obtaining the item, or 4) The item does not meet the Air Force’s performance specifications.

17.2 Individual specifications contained in this contract may or may not reference the permitted use of a recycled/recovered material.

Recycled/recovered materials shall be used in the quantities set forth in the EPA's CPG whether specified in the individual specification or not.

17.3 The following products are on the CPG list (list and percentages can be found at www.epa.gov/cpg/ products.htm) and the contractor must meet minimum percentages: (list products in the project …… …)

18.AS-BUILT DRAWINGS: The Contractor is required to provide as-built AutoCAD files to SJAFB CAD standards. Contractor shall also provide information on spreadsheet (obtain spreadsheet from Base Civil Engineering) in Microsoft Excel format to Government. Contractor shall locate as-built new as-built equipment with topographic survey. Contractor shall coordinate information required with the Contracting Officer and provide an initial data submittal (obtain form from Base Civil Engineering) for review and final data submittal (obtain form from Base Civil Engineering) once approved by Contracting Officer.

Attachment 1 Page 9 of 652

SECTION 01 00 00 PAGE 6

19.Time Warner Cable System Requirements: There is an existing cable television system located on the power poles that are affected by this project, which will be removed. This cable television system is owned by Time Warner Cable. The contractor shall remove this cable television system and provide an underground cable television system as follows: It is preferred that the contractor contract with Time Warner Cable and have Time Warner Cable remove their overhead communications cabling network system removed from the power poles and provided underground. Time Warner Cable is aware of this project and its affect to their cable system. The contractor shall pay all fees and charges and expenses to have Time Warner Cable remove their system from the power poles and provide their cabling system underground. Should the contractor decide to not contract with Time Warner Cable, the contractor shall provide the following as part of this contract:

19.1 The contractor shall remove all Time Warner Cable systems and components and equipment from power poles that are to be removed under this project.

This system is significantly located on poles along Vermont Garrison, Blakeslee Ave, Jabara and area 15 indicated on the drawings.

19.2 The Contractor shall provide a complete fully functional cable system underground to replace the overhead cable system removed.

19.3 The contractor shall provide the complete underground cable system in accordance with all details and requirements of Time Warner Cable.

19.4 The Contractor shall provide a complete cable system in accordance with Time Warner Cable that is acceptable without exception, for Time Warner Cable to take possession of the system, on behalf of the Government, should they elect.

19.5 The Contractor shall provide a minimum of 25 year warranty and maintenance on the cable system with a minimum response time for repairs of 4 hours. All repairs shall be made and the complete system fully functional and restore to full operating capability within 4 hours of being called by the Government.

20.Onsite Daily Supervisor Electrician: The contractor shall provide an onsite medium voltage electrician / lineman supervisor and construction supervisor (MV Supervisor), herein referred to as MV Supervisor, that shall be onsite continuously during all phases of construction.

20.1 The MV Supervisor education and experience requirements shall be as follows: minimum of ten years in the electric utility industry. Minimum of ten years’ experience installing and constructing medium voltage level, 15 kv class, power systems of overhead utility power systems and underground utility power systems. Minimum of ten years of exemplary onsite safety record. Minimum of ten years implementing and following onsite safety procedures in accordance with OSHA, ANSI/IEEE and NFPA 70.

Minimum of five years’ experience of completed cable splicing and terminating medium voltage cabling. Minimum of five years’ experience testing medium voltage cabling in accordance with IEEE, NEMA and ICEA standards. Minimum five years’ experience performing ground resistance measuring in accordance with the NFPA 70. Minimum of five years’ experience in the knowledge and understanding of NETA testing of medium voltage electrical equipment. Minimum of five years’ experience in the knowledge and understanding of medium voltage electrical equipment manufacturers recommended testing and installation procedures.

20.2 The MV Supervisor skills, knowledge, and abilities required shall be as follows: shall have a complete understanding knowledge in the theory of and experience with the operation of medium voltage electrical systems and equipment. Shall have good communication skills. Shall be an effective team and crew leader and supervisor. Shall be trained and certified on all aspects of medium voltage utility power systems safety and procedures.

20.3 The MV Supervisor licenses, certifications, testing required shall be as follows:

20.3.1 Valid North Carolina state driver’s license.

20.3.2 State licensed journeyman electrical license or lineman certificate.

Attachment 1 Page 10 of 652

SECTION 01 00 00 PAGE 7

20.3.3 Cable splicer / terminator certification from the national cable splicing certification board (NCSCB) in the field of splicing and terminating shielded medium voltage (5 kv to 35 kv) power cable using pre-manufactured kits (pre-molded, heat-shrink, cold shrink).

20.3.4 Cable installer qualified with a documentable level of competency and experience to supervise or perform all cable pulling operations.

Provide a resume showing the cable installers' experience in the last five years, including a list of references complete with points of contact, addresses and telephone numbers. Cable installer must demonstrate experience with a minimum of three medium voltage cable installations. The contracting officer reserves the right to require additional proof of competency or to reject the individual and call for an alternate qualified cable installer.

20.3.5 Submit all qualifications of the onsite daily supervisor electrician (the MV Supervisor) for approval by the government.

21.Additional requirement for licensed electricians for this project: he contractor shall provide and have on staff a minimum of five (5) licensed electricians for the complete duration of this project.

22.PAYMENTS: Throughout the complete project and specifications, payment is to be based on progress schedule / percentage complete.

Attachment 1 Page 11 of 652

Attachment 1: Airfield and Controlled Movement Area Reference Documents

100% REVIEW SUBMITTAL

Attachment 1 Page 12 of 652

SJAFB Instruction 13-213, 14 March 2013, Airfield Driving Instruction

100% REVIEW SUBMITTAL

Attachment 1 Page 13 of 652

BY ORDER OF THE COMMANDER SEYMOUR JOHNSON AFB INSTRUCTION 13-213

4TH FIGHTER WING

14 March 2013

AIRFIELD DRIVING INSTRUCTION

SUMMARY OF CHANGES

Attachment 1 Page 14 of 652

Attachment 1 Page 15 of 652

Attachment 1 Page 16 of 652

Attachment 1 Page 17 of 652

Attachment 1 Page 18 of 652

Attachment 1 Page 19 of 652

Attachment 1 Page 20 of 652

Attachment 1 Page 21 of 652

Attachment 1 Page 22 of 652

Attachment 1 Page 23 of 652

Attachment 1 Page 24 of 652

Attachment 1 Page 25 of 652

Attachment 1 Page 26 of 652

Attachment 1 Page 27 of 652

NOTE

Attachment 1 Page 28 of 652

Attachment 1 Page 29 of 652

Attachment 1 Page 30 of 652

Attachment 1 Page 31 of 652

Attachment 1 Page 32 of 652

Attachment 1 Page 33 of 652

Attachment 1 Page 34 of 652

Attachment 1 Page 35 of 652

Attachment 1 Page 36 of 652

EXCEPTION:

Attachment 1 Page 37 of 652

Attachment 1 Page 38 of 652

Attachment 1 Page 39 of 652

Exception:

CAUTION

Attachment 1 Page 40 of 652

Attachment 1 Page 41 of 652

Attachment 1 Page 42 of 652

Attachment 1 Page 43 of 652

Attachment 1 Page 44 of 652

Attachment 1 Page 45 of 652

Notes:

Attachment 1 Page 46 of 652

Attachment 1 Page 47 of 652

Attachment 1 Page 48 of 652

Attachment 1 Page 49 of 652

Attachment 1 Page 50 of 652

Attachment 1 Page 51 of 652

Attachment 1 Page 52 of 652

Attachment 1 Page 53 of 652

Attachment 1 Page 54 of 652

NOTE:

Attachment 1 Page 55 of 652

Attachment 1 Page 56 of 652

Attachment 1 Page 57 of 652

Attachment 1 Page 58 of 652

Attachment 1 Page 59 of 652

Attachment 1 Page 60 of 652

Acknowledge Advise Intentions Affirmative Confirm Correction

Go Ahead d

Hold/Hold Short

Attachment 1 Page 61 of 652

Immediately or without delay, Expedite

Negative Out Over Proceed

Read Back Roger Say Again Standby

Unable

Verify

WILCO

ALPHA NOVEMBER

BRAVO OSCAR

CHARLIE PAPA

DELTA QUEBEC

ECHO ROMEO

FOXTROT SIERRA

GOLF TANGO

HOTEL UNIFORM

INDIA VICTOR

JULIETT WHISKEY

KILO X-RAY

LIMA YANKEE

MIKE ZULU

One Six Two Seven Three Eight Four Nine Five Zero

Attachment 1 Page 62 of 652

References

Attachment 1 Page 63 of 652

Abbreviations, Acronyms and Terms

Attachment 1 Page 64 of 652

Attachment 1 Page 65 of 652

Attachment 1 Page 66 of 652

Attachment 1 Page 67 of 652

Attachment 1 Page 68 of 652

Attachment 1 Page 69 of 652

Attachment 1 Page 70 of 652

Attachment 1 Page 71 of 652

Attachment 1 Page 72 of 652

Attachment 1 Page 73 of 652

Attachment 1 Page 74 of 652

Attachment 1 Page 75 of 652

SJAFB UNIT ADPM TRAINING CHECKLIST

Attachment 1 Page 76 of 652

WING ADPM or designated representative

Attachment 1 Page 77 of 652

Attachment 1 Page 78 of 652

Attachment 1 Page 79 of 652

Attachment 1 Page 80 of 652

Airfield Driving Qualification Training Checklist (Curriculum)

SECTION I – Trainee Information (Completed by Unit ADPM)

Name(Last, First, Middle)

Attachment 1 Page 81 of 652

Attachment 1 Page 82 of 652

Attachment 1 Page 83 of 652

Rank, Civilian Grade or equivalent:

Signature: Date:

UNIT ADPM

I certify that the above individual has completed all local training requirements outlined in SJAFBI 13-213. Check all applicable restrictions.

� Ramp only � Daylight Hours only � Other (Specify) Name (Last, First, MI): Rank, Civilian Grade or equivalent:

Signature: Date:

WING ADPM or designated representative (as required)

Name (Last, First, MI): Rank, Civilian Grade or equivalent:

Signature: Date:

Attachment 1 Page 84 of 652

SJAFB TDY PERSONNEL/CONTRACTORS TRAINING CHECKLIST

Attachment 1 Page 85 of 652

WING ADPM or designated representative

Attachment 1 Page 86 of 652

Attachment 1 Page 87 of 652

Attachment 1 Page 88 of 652

Attachment 1 Page 89 of 652

Attachment 1 Page 90 of 652

Attachment 1 Page 91 of 652

Attachment 1 Page 92 of 652

Attachment 1 Page 93 of 652

Attachment 1 Page 94 of 652

Attachment 1 Page 95 of 652

Attachment 1 Page 96 of 652

Attachment 1 Page 97 of 652

Attachment 1 Page 98 of 652

5.

C.

Attachment 1 Page 99 of 652

Attachment 1 Page 100 of 652

EXAMPLE TYPE OF SIGN PURPOSE LOCATION/CONVENTION

Mandatory: Hold position for taxiway/runway intersection

Denotes entrance to runway from a taxiway

Located L side of taxiway within 10 ft of hold position

Mandatory: Hold position for taxiway/runway intersection

Denotes intersecting runway Located L side of rwy prior to intersection, & R side if rwy more than 150’ wide, used as taxiway, or has “land & hold short” ops

Mandatory: Hold position for ILS critical area/precision obstacle free zone

Denotes entrance to area to be protected for an ILS signal or approach airspace

Located on twys where the twys enter the NAVAID critical area or where aircraft on twy would violate ILS apch airspace (including POFZ)

Taxiway Location Identifies taxiway on which the aircraft is located

Located along twy by itself, as part of an array of twy direction signs, or combined with a rwy/twy hold sign

Runway Safety Area/ OFZ and Runway Approach Area Boundary

Identifies exit boundary for an RSA/OFZ or rwy approach

Located on twys on back side of certain rwy/twy holding position signs or rwy apch area signs

ILS Critical Area/POFZ Boundary Identifies ILS critical area exit boundary

Located on twys on back side of ILS critical area signs

Direction: Taxiway Defines designation/direction of intersecting taxiway(s)

Located on L side, prior to intersection, with an array L to R in clockwise manner

Distance Remaining Distance remaining info for take-off/landing

Located along the sides of rwys at 1000’ increments

EXAMPLE TYPE OF MARKING PURPOSE LOCATION/CONVENTION

Holding Position Denotes entrance to runway from a taxiway

Located across centerline within 10’ of hold sign on twys and certain runways

ILS Critical Area/ POFZ Boundary Denotes entrance to area to be protected for an ILS signal or approach airspace

Located on twys where the twys enter the NAVAID critical area or where aircraft on twy would violate ILS apch airspace (including POFZ)

Non-Movement area Boundary Delineates movement area under control of ATCT, from non-movement area

Located on boundary between movement and non-movement area.

Located to ensure wing clearance for taxiing aircraft

Taxiway Edge Defines edge of usable, full strength taxiway

Located along twy edge where contiguous shoulder or other paved surface NOT intended for use by aircraft

Attachment 1 Page 101 of 652

Attachment 1 Page 102 of 652

Attachment 1 Page 103 of 652

Attachment 1 Page 104 of 652

Attachment 1 Page 105 of 652

Attachment 1 Page 106 of 652

Attachment 1 Page 107 of 652

Attachment 1 Page 108 of 652

Attachment 1 Page 109 of 652

Attachment 1 Page 110 of 652

Attachment 1 Page 111 of 652

Attachment 1 Page 112 of 652

USAF Airfield Driving Computer Base Training Course

Attachment 1 Page 113 of 652

Attachment 1 Page 114 of 652

Attachment 1 Page 115 of 652

Attachment 1 Page 116 of 652

Attachment 1 Page 117 of 652

Attachment 1 Page 118 of 652

Attachment 1 Page 119 of 652

Attachment 1 Page 120 of 652

Attachment 1 Page 121 of 652

Attachment 1 Page 122 of 652

Attachment 1 Page 123 of 652

Attachment 1 Page 124 of 652

Attachment 1 Page 125 of 652

Attachment 1 Page 126 of 652

Attachment 1 Page 127 of 652

Attachment 1 Page 128 of 652

Attachment 1 Page 129 of 652

Attachment 1 Page 130 of 652

Attachment 1 Page 131 of 652

Attachment 1 Page 132 of 652

Attachment 1 Page 133 of 652

Attachment 1 Page 134 of 652

Attachment 1 Page 135 of 652

Attachment 1 Page 136 of 652

Attachment 1 Page 137 of 652

Attachment 1 Page 138 of 652

Attachment 1 Page 139 of 652

Attachment 1 Page 140 of 652

Attachment 1 Page 141 of 652

Attachment 1 Page 142 of 652

Attachment 1 Page 143 of 652

Attachment 1 Page 144 of 652

Attachment 1 Page 145 of 652

Attachment 1 Page 146 of 652

Attachment 1 Page 147 of 652

Attachment 1 Page 148 of 652

Attachment 1 Page 149 of 652

Attachment 1 Page 150 of 652

Attachment 1 Page 151 of 652

Attachment 1 Page 152 of 652

Attachment 1 Page 153 of 652

Attachment 1 Page 154 of 652

Attachment 1 Page 155 of 652

Attachment 1 Page 156 of 652

Attachment 1 Page 157 of 652

Attachment 1 Page 158 of 652

Attachment 1 Page 159 of 652

Attachment 1 Page 160 of 652

Attachment 1 Page 161 of 652

Attachment 1 Page 162 of 652

Attachment 1 Page 163 of 652

Attachment 1 Page 164 of 652

Attachment 1 Page 165 of 652

Attachment 1 Page 166 of 652

Attachment 1 Page 167 of 652

Attachment 1 Page 168 of 652

Attachment 1 Page 169 of 652

Attachment 1 Page 170 of 652

Attachment 1 Page 171 of 652

Attachment 1 Page 172 of 652

Attachment 1 Page 173 of 652

Attachment 1 Page 174 of 652

Attachment 1 Page 175 of 652

Attachment 1 Page 176 of 652

Attachment 1 Page 177 of 652

Attachment 1 Page 178 of 652

Attachment 1 Page 179 of 652

Attachment 1 Page 180 of 652

Attachment 1 Page 181 of 652

Attachment 1 Page 182 of 652

Attachment 1 Page 183 of 652

Attachment 1 Page 184 of 652

Attachment 1 Page 185 of 652

Attachment 1 Page 186 of 652

Attachment 1 Page 187 of 652

Attachment 1 Page 188 of 652

Attachment 1 Page 189 of 652

Attachment 1 Page 190 of 652

Attachment 1 Page 191 of 652

Attachment 1 Page 192 of 652

Attachment 1 Page 193 of 652

Attachment 1 Page 194 of 652

Attachment 1 Page 195 of 652

Attachment 1 Page 196 of 652

Attachment 1 Page 197 of 652

Attachment 1 Page 198 of 652

Attachment 1 Page 199 of 652

Attachment 1 Page 200 of 652

Attachment 1 Page 201 of 652

Attachment 1 Page 202 of 652

Attachment 1 Page 203 of 652

Attachment 1 Page 204 of 652

Attachment 1 Page 205 of 652

Attachment 1 Page 206 of 652

Attachment 1 Page 207 of 652

Attachment 1 Page 208 of 652

Attachment 1 Page 209 of 652

Attachment 1 Page 210 of 652

Attachment 1 Page 211 of 652

Attachment 1 Page 212 of 652

Attachment 1 Page 213 of 652

Attachment 1 Page 214 of 652

Attachment 1 Page 215 of 652

Attachment 1 Page 216 of 652

Attachment 1 Page 217 of 652

SJAFB Airfield Diagram

Attachment 1 Page 218 of 652

Ru nw ay

8/

O pr

O

SS

/O

SA

A

C ur re nt a s o f 1 A pr

AT

TA

CH

M

EN

T

SE

YM

O

U R

JO

HN

SO

N

FB

AI

RF

IE

LD

D

IA

GR

AM

Attachment 1 Page 219 of 652 irf ie ld

D riv in g

Attachment 1 Page 220 of 652

Attachment 1 Page 221 of 652

Attachment 1 Page 222 of 652

Attachment 1 Page 223 of 652

Attachment 1 Page 224 of 652

Attachment 1 Page 225 of 652

Attachment 1 Page 226 of 652

Attachment 1 Page 227 of 652

Attachment 1 Page 228 of 652

Attachment 1 Page 229 of 652

Attachment 1 Page 230 of 652

Attachment 1 Page 231 of 652

Attachment 1 Page 232 of 652

Attachment 1 Page 233 of 652

LL

Attachment 1 Page 234 of 652

Attachment 1 Page 235 of 652

Ve hi cl es a re re qu ire d to h ol d sh or t o f t he

IN

ST

h ol dl in e m ar ki ng s on

Ta xi w ay s B

J an d co nt ac t S ey m ou r G ro un d fo r p er m iss io n to pr oc ee d on th e ru nw ay o r t o w or k be tw ee n it an d th e

VF

R ho ld lin e.

Ad di tio na lly , i nd iv id ua ls gr an te d pe rm iss io n by S ey m ou r

Gr ou nd to w or k w ith in th e

IN

ST

a nd V

FR

h ol di ne m ar ki ng s o r u p to , b ut no t o n th e ru nw ay m us t o bt ai n fu rt he r a pp ro va l f ro m S ey m ou r

Gr ou nd to c ro ss th e

VF

R ho ld lin e an d/ or e nt er th e ru nw ay

U se d to id en tif y th e lo ca tio n w he re a p ilo t o r v eh ic le is to st op w he n cl ea ra nc e ha s n ot b ee n gr an te d on to a ru nw ay

N ev er c ro ss w ith ou t pe rm iss io n fro m to w er

Ho ld o n th e so lid li ne si de o f t hi s m ar ki ng

Attachment 1 Page 236 of 652

Attachment 1 Page 237 of 652

Lo ca te d ft fr om ru nw ay e dg e.

Do ub le so lid /b ro ke n ye llo w li ne s p ai nt ed a cr os s t ax iw ay w id th

Ve hi cl es m us t r em ai n be hi nd th is lin e un til a ut ho riz ed b y th e Co nt ro l To w er to p ro ce ed a cr os s v ia ra di o co m m un ic at io n fo r r un w ay a cc es s.

Attachment 1 Page 238 of 652

Attachment 1 Page 239 of 652

Attachment 1 Page 240 of 652

Attachment 1 Page 241 of 652

RU

N

W

AY

8/

KC

-1

RA

M P

Ai rf ie ld

M an ag em en t

To w er

VF

R

Ho ld lin e

IN

ST

H ol dl in e m ar ki ng

TR

AN

SI

EN

T

RA

M

P

AM

Q P

Attachment 1 Page 242 of 652 ho ur s

Attachment 1 Page 243 of 652

Attachment 1 Page 244 of 652

Attachment 1 Page 245 of 652

Attachment 1 Page 246 of 652

Attachment 1 Page 247 of 652

Attachment 1 Page 248 of 652

Attachment 1 Page 249 of 652

Se e th e

B ig

P ic tu re

Tr an sm it

C le ar ly

Li st en C ar ef ul ly

Si tu at io na l A w ar en es s

U nd er st an d

Si gn s, Li gh ts

, a nd

M ar ki ng s

N ev er A ss um e

Attachment 1 Page 250 of 652

Attachment 1 Page 251 of 652

Attachment 1 Page 252 of 652

Seymour-Johnson AFB Contract Number: FA4890-11-D-0003 Delivery Order BW01 Project Number: VKAG 14-1034 (Electrical Design Only) Project Title: Repair Overhead and Underground Electrical

Lines Basewide

Specifications 100% Corrected Final Design Submittal

Volume 2 of 3

9 December 2015

Prepared for:

Department of the Air Force Seymour-Johnson AFB, NC

Department of the Air Force 4 Civil Engineering Squadron 1095 Peterson Avenue Seymour-Johnson AFB, NC 27531

Prepared by:

AECOM

11832 Rock Landing Drive, Suite 306 Newport News, VA 23606 www.aecom.com

AECOM

9755 Patuxent Woods Drive, Suite 300 Columbia, MD 21046 www.aecom.com

Attachment 1 Page 253 of 652

Attachment 1 Page 254 of 652

Attachment 1 Page 255 of 652

Attachment 1 Page 256 of 652

REPAIR OVERHEAD AND UNDERGROUND ELECTRICAL LINES VKAG141034

SECTION 01 00 05

GENERAL - ADDITIONAL REQUIREMENTS

05/15

PART 1 GENERAL

1.1 DEFINITIONS

Only use this paragraph to define terms used in the specification section that are not defined by a commercial or Government standard and to provide a common interpretation of a term for contractual purposes.

1.2 SEQUENCING AND SCHEDULING

Provide construction sequencing and scheduling as required by the Contracting Officer.

1.3 SUBMITTALS

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Certificates of insurance;

Surety bonds;

List of proposed subcontractors;

List of proposed products;

Construction Progress Schedule;

Schedule of prices;

Health and safety plan;

Work plan; G

Quality control plan;

Environmental protection plan;

SD-02 Shop Drawings

Shop Drawings;

SD-03 Product Data

Product Data;

SD-05 Design Data

Design Data;

SECTION 01 00 05 Page 1

Attachment 1 Page 257 of 652

SD-06 Test Reports

Test Reports;

Daily checklists;

Final acceptance test and operational test procedure;

SD-07 Certificates

Confined space entry permits;

SD-08 Manufacturer's Instructions

Material Safety Data;

SD-09 Manufacturer's Field Reports

Factory test reports;

SD-10 Operation and Maintenance Data

Maintenance Manuals;

SD-11 Closeout Submittals

As-built Drawings;

1.4 QUALITY ASSURANCE

Specification paragraph text.

1.4.1 Qualifications

Specification subparagraph text.

1.4.2 Regulatory Requirements

Specification subparagraph text.

1.4.3 Pre-Installation Conference

Specification subparagraph text.

1.5 DELIVERY, STORAGE, AND HANDLING

Specification subparagraph text.

1.6 PROJECT CONDITIONS

Provide delivery, storage and handling as required by the Contracting Officer, manufacturers recommendation and the specifications.

1.6.1 Environmental Requirements

See Section 01 56 00, Environmental Protection.

SECTION 01 00 05 Page 2

Attachment 1 Page 258 of 652

1.7 WARRANTY

Provide as required by the specifications.

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

Perform and provide construction for project VKAG 14-1034, Repair Overhead And Underground Electrical Lines, Basewide.

2.2 TESTS, INSPECTIONS, AND VERIFICATIONS

Provide as required by the specifications.

PART 3 EXECUTION

3.1 FIELD QUALITY CONTROL

Provide as required by the specifications.

3.1.1 Tests

Provide as required by the specifications.

3.1.2 Inspections

Provide as required by the specifications.

3.1.3 Manufacturer's Field Services

Provide as required by the specifications.

3.2 SYSTEM STARTUP

Provide as required by the specifications.

3.3 ADJUSTING AND CLEANING

Provide as required by the specifications.

3.4 CLOSEOUT ACTIVITIES

3.4.1 Training

Provide as required by the specifications.

3.5 PROTECTION

Provide as required by the specifications.

-- End of Section --

SECTION 01 00 05 Page 3

Attachment 1 Page 259 of 652

Section 01 02 60 Page 1

SECTION 01 02 60

UNIT PRICES

PART I – GENERAL

1.1 RELATED DOCUMENTS

1.1.1 Drawings and general provision of the contract apply to this section.

1.2 SUMMARY

1.2.1 This section specifies administrative and procedural requirements for unit prices.

1.2.1.1 A unit price is an amount proposed by bidders and stated on the Bid Form as a price per unit of measurement for materials or services that will be added to or deducted from the Contract Sum by Change Order in the event the estimated quantity of work required by the contract documents increased or decreased.

1.2.1.2 Unit prices include all necessary material, overhead, profit and applicable taxes.

1.2.2 A “Unit Price Schedule” is included at the end of this Section.

1.2.3 The Contracting Officer reserves the right to reject the contractor’s measurement of work-in-place that involves use of established unit prices and to have this work measured by an independent surveyor acceptable to the contractor at the government’s expense.

PART 2 – PRODUCTS (Not applicable)

PART 3 – EXECUTION

3.1 UNIT PRICE SCHEDULE – See next page.

Attachment 1 Page 260 of 652

Section 01 02 60 Page 2

3.1.1 UNIT PRICE SCHEDULE

0002 ESTIMATED QUANTITY ITEMS

All work to install additional conduit, duct bank, medium voltage cable, including bond.

UNIT EST

QTY

UNITT

COST

TOTAL

0002A UG MV Fdr 15 kV 750 kcmil LF 1900 _______ 0002B UG Fdr 600V 250 Kcmil LF 634 _______ 0002C MV 15KV Inline Splice EA 6 _______ 0002D Excavation CY 282 _______ 0002E Spacers EA 380 _______ 0002F Conduit 6" LF 1516 _______ 0002G Concrete CY 44 _______ 0002H Backfill & Compaction CY 132 _______ 0002I Elbows EA 36 _______ 0002J Marking Tape LF 634 _______

Item No. 0002 – Replace Underground Duct Bank and Medium Voltage Cable Includes all labor, materials, tools, equipment and incidentals for the installation of new underground duct and medium voltage cable including but not limited to 15 kV 750 Kcmil cable, 600V 250 Kcmil cable, 15KV inline splices, excavation, conduit spacers, 6” conduit, concrete, elbows, marking tape, site restoration, and backfill & compaction with designated material. The Contractor shall not proceed with any work without prior approval from the Government. All work shall be performed under the direct supervision of the Government’s representative.

Payment will be made on the basis of linear feet of underground duct bank installed measured in place, completed and accepted.

-- END OF SECTION --

Attachment 1 Page 261 of 652

SECTION 01 11 00

SUMMARY OF WORK

08/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E2114 (2008) Standard Terminology for Sustainability Relative to the Performance of Buildings

1.2 DEFINITIONS

Definitions pertaining to sustainable development are as defined in ASTM E2114, Section 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS, and as specified.

a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.

b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.

c. "Operational performance" is the functional behavior of the building as a whole or of the building components.

d. "Sustainability" is the balance of environmental, economic, and societal considerations.

1.3 SUBMITTALS

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Submit the following items to the Contracting Officer:

Utility Outage Requests Utility Connection Requests Borrow Permits Excavation Permits Welding Permits

SECTION 01 11 00 Page 1

Attachment 1 Page 262 of 652

Burning Permits

SD-07 Certificates

Energy Performance Rating

1.4 WORK COVERED BY CONTRACT DOCUMENTS

1.4.1 Project Description

The work includes providing all labor and materials for construction of VKAG 14-1034, Repair Overhead And Underground Electrical Lines, Basewide, as indicated on the drawings and as indicated in the specifications, and incidental related work.

1.4.2 Location

The work shall be located at Seymour Johnson Air Force Base. The exact location will be shown by the Contracting Officer.

1.5 OCCUPANCY OF PREMISES

Building(s) will be occupied during performance of work under this Contract.

1.6 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

1.7 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged shall remain the property of the Government.

The salvaged property shall be segregated, itemized, delivered, and off-loaded at the Government designated storage area located within 25 miles of the construction site.

Contractor shall maintain property control records for material or equipment designated as salvage. Contractor's system of property control may be used if approved by the Contracting Officer. Contractor shall be responsible for storage and protection of salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

SECTION 01 11 00 Page 2

Attachment 1 Page 263 of 652

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 3

Attachment 1 Page 264 of 652

SECTION 01 32 01.00 10

PROJECT SCHEDULE

02/15

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AACE INTERNATIONAL (AACE)

AACE 52R-06 (2006) Time Impact Analysis - As Applied in Construction

1.2 SUBMITTALS

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Project Scheduler Qualifications;

Initial Project Schedule;

1.3 PROJECT SCHEDULER QUALIFICATIONS

Designate an authorized representative to be responsible for the preparation of the schedule and all required updating and production of reports. Representative must have a comprehensive knowledge of CPM scheduling principles and application.

PART 2 PRODUCTS

2.1 SOFTWARE

The scheduling software utilized to produce and update the schedules required herein must be capable of meeting all requirements of this specification.

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

Prepare for approval a Project Schedule, as specified herein, pursuant to FAR Clause 52.236-15, SCHEDULE FOR CONSTRUCTION CONTRACTS. The Contractor shall provide a project schedule utilizing Air Force Form 3064, Contract Progress Schedule, Gant Chart and CPM as indicated herein. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required. The scheduling of construction is the responsibility of the Contractor. Contractor management personnel must

SECTION 01 32 01.00 10 Page 1

Attachment 1 Page 265 of 652 actively participate in its development. Subcontractors and suppliers working on the project must also contribute in developing and maintaining an accurate Project Schedule. Provide a schedule that is a forward planning as well as a project monitoring tool. Use the Critical Path Method (CPM) of network calculation to generate all Project Schedules.

Prepare each Project Schedule using the Precedence Diagram Method (PDM).

3.2 PROJECT SCHEDULE SUBMISSIONS

Provide the submissions as described below. The requirements for each submission are contained in paragraph SUBMISSION REQUIREMENTS. If the Contractor fails or refuses to furnish the information and schedule updates as set forth herein, then the Contractor will be deemed not to have provided an estimate upon which a progress payment can be made.

Review comments made by the Government on the schedule(s) do not relieve the Contractor from compliance with requirements of the Contract Documents.

3.2.1 Initial Project Schedule Submission

Submit the Initial Project Schedule and CPM for approval within 30 calendar days after notice to proceed is issued. The schedule must demonstrate a reasonable and realistic sequence of activities which represent all work through the entire contract performance period.

3.2.2 Periodic Schedule Updates

Update the Project Schedule on a regular basis, monthly at a minimum.

Provide a draft Periodic Schedule Update for review. These updates will enable the Government to assess Contractor's progress.

3.3 SUBMISSION REQUIREMENTS

Submit items as required by the Contracting Officer, for the Initial Schedule, and every Periodic Schedule Update throughout the life of the project.

3.4 REQUESTS FOR TIME EXTENSIONS

Provide a justification of delay to the Contracting Officer in accordance with the contract provisions and clauses for approval within 10 days of a delay occurring. Also prepare a time impact analysis for each Government request for proposal (RFP) to justify time extensions.

3.4.1 Justification of Delay

Provide a description of the event(s) that caused the delay and/or impact to the work. As part of the description, identify all schedule activities impacted. Show that the event that caused the delay/impact was the responsibility of the Government. Provide a time impact analysis that demonstrates the effects of the delay or impact on the project completion date or interim completion date(s).