Att_6.5 _Sample_Project_Blank__3052.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Repair Airfield/Base Pavements (IDIQ)
Solicitation number
FA4809-13-R-0006
Issued by

About this file

SAMPLE PROJECT AF FORM 3052 CONSTRUCTION COST ESTIMATE BREAKDOWN

View the file

Other files

File Type Posted
Questions_ _Responses__5.pdf PDF
FA4809-13-R-0006-0005.pdf PDF
Att_6.4_Sample_Proj_G-1 _C-1 _C-2 _C-3_Rev_1.pdf PDF
FA4809-13-R-0006-0004.pdf PDF
Questions_ _Responses__4.pdf PDF
Att_9 _NAF_Provision_ _Clauses.pdf PDF
FA4809-13-R-0006-0003.pdf PDF
Questions_ _Responses__3.pdf PDF
FA4809-13-R-0006-0002.pdf PDF
Amendment_0002 _Att_1.pdf PDF
Questions_ _Responses__2.pdf PDF
Site_Visit_Minutes.pdf PDF
Att_2 _Revised_Wage_Decision_Jan_2015.pdf PDF
Att_3 _Revised_Contractor_Responsibility.pdf PDF
FA4809-13-R-0006-0001_Amendment.pdf PDF
Att_4 _Revised_Past_Performance_Questionnaire.pdf PDF
Questions_ _Responses__1.pdf PDF
Att_4 _Past_Performance_Questionnaire.pdf PDF
Att_5 _Offer_Sched_Combined.pdf PDF
Att_8 _IDIQ_Form_66_5Mar14.xls XLS spreadsheet
13-R-0006_Solicitation.pdf PDF
Att_7 _Special_Events_Pass_Request.pdf PDF
Att_6.2 _AF_66_Sample_Project.xls XLS spreadsheet
Att_2 _Wage_Decisions_Combined.pdf PDF
Att_3 _Contractor_Responsibility.pdf PDF
Att_1 _Specifications_1_Aug_14_Final.pdf PDF
Att_6.4 _Sample_Proj_Drawings.pdf PDF
Att_6.1 _SOW__Sample_project.pdf PDF
Att_6.3 _Sample_Project_Offer_Schedule.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GE Base

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
GOVERNMENT ESTIMATE - IDIQ Sample Project
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Static Grounding Points
PROJECT REQUEST NUMBERPROJECT NUMBERWORK LOCATION
VKAG 04-1402Paving IDIQ
MATERIAL COSTLABOR COSTS
LINE NO.DESCRIPTIONUNIT OF MEASUREQUANTITYUNITTOTALMANHRS/ MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
110' long 3/4" diameter static grounding pointsEa35

Total

FOR OFFICIAL USE ONLY

FA4809-13-R-0006

Attachment 6.5 &P of &N

GE Base REVERSE

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
COL 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples-square yards-SY, cubic yards-CY, square feet-SF, linear feet-LF, board feet-BF, each-EA, pound-LB.
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (Co. 2). Items and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in Col 1.
Col 6, 7, and 8 Labor Costs. Enter in Col 6 the estimated number of man-hours or man-days needed to perform the work listed in Col 1.
Col 10 Line Total. Self -explanatory.
NOTE: In addition to other totals entered on various pages, the grand total oc Col 10, plus overhead and profit will be shown on the last page as follows:
TOTAL MATERIAL COSTS$
TOTAL LABOR COSTS$
TOTAL OTHER DIRECT COSTS$
TOTAL DIRECT COSTS$0.00
OVERHEAD$0.00
SUBTOTAL$0.00
PROFIT$0.00
TOTAL PRICE$0.00
DATEFIRM NAME
TITLE:
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3-807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with, this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. Whe attachment of supporting cost or pricing data to this form is iimpracticable, the data will be described (with schedules as appropriate), and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal, the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

&"Arial,Bold"INSTRUCTIONS FOR COMPLETING AF FORM 3052

&8(Reverse of AF Form 3052, Jan 88) FA4809-13-R-0006 Attachment 6.5 &P of &N &8(Copy for 4 CES/CECN/Updated Mar 00)

FOR

OFFICIAL

USE

ONLY

File details come from the government source that posted it. Updated .