SAMPLE PROJECT AF FORM 3052 CONSTRUCTION COST ESTIMATE BREAKDOWN
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GE Base
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| GOVERNMENT ESTIMATE - IDIQ Sample Project | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| Static Grounding Points | ||||||||||
| PROJECT REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| VKAG 04-1402 | Paving IDIQ | |||||||||
| MATERIAL COST | LABOR COSTS | |||||||||
| LINE NO. | DESCRIPTION | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHRS/ MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| 1 | 10' long 3/4" diameter static grounding points | Ea | 35 |
Total
FOR OFFICIAL USE ONLY
FA4809-13-R-0006
Attachment 6.5 &P of &N
GE Base REVERSE
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs. | |||||
| COL 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples-square yards-SY, cubic yards-CY, square feet-SF, linear feet-LF, board feet-BF, each-EA, pound-LB. | |||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (Co. 2). Items and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates. | |||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in Col 1. | |||||
| Col 6, 7, and 8 Labor Costs. Enter in Col 6 the estimated number of man-hours or man-days needed to perform the work listed in Col 1. | |||||
| Col 10 Line Total. Self -explanatory. | |||||
| NOTE: In addition to other totals entered on various pages, the grand total oc Col 10, plus overhead and profit will be shown on the last page as follows: | |||||
| TOTAL MATERIAL COSTS | $ | ||||
| TOTAL LABOR COSTS | $ | ||||
| TOTAL OTHER DIRECT COSTS | $ | ||||
| TOTAL DIRECT COSTS | $ | 0.00 | |||
| OVERHEAD | $ | 0.00 | |||
| SUBTOTAL | $ | 0.00 | |||
| PROFIT | $ | 0.00 | |||
| TOTAL PRICE | $ | 0.00 | |||
| DATE | FIRM NAME | ||||
| TITLE: |
| INSTRUCTIONS TO OFFERORS | |
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3-807.4). | |
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with, this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of: | |
| a. The existing, verifiable data. | |
| b. The judgmental factors applied in projecting from known data to the estimate, and | |
| c. The contingencies used by the offeror in his proposed price. | |
| In short, the offeror's estimating process itself needs to be disclosed. | |
| 3. Whe attachment of supporting cost or pricing data to this form is iimpracticable, the data will be described (with schedules as appropriate), and made available to the contracting officer or his authorized representative upon request. | |
| 4. By submission of this proposal, the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award. |
&"Arial,Bold"INSTRUCTIONS FOR COMPLETING AF FORM 3052
&8(Reverse of AF Form 3052, Jan 88) FA4809-13-R-0006 Attachment 6.5 &P of &N &8(Copy for 4 CES/CECN/Updated Mar 00)
FOR
OFFICIAL
USE
ONLY
File details come from the government source that posted it. Updated .