SAMPLE PROJECT STATEMENT OF WORK

View the file

Other files

File Type Posted
Questions_ _Responses__5.pdf PDF
FA4809-13-R-0006-0005.pdf PDF
Att_6.4_Sample_Proj_G-1 _C-1 _C-2 _C-3_Rev_1.pdf PDF
FA4809-13-R-0006-0004.pdf PDF
Questions_ _Responses__4.pdf PDF
Att_9 _NAF_Provision_ _Clauses.pdf PDF
FA4809-13-R-0006-0003.pdf PDF
Questions_ _Responses__3.pdf PDF
FA4809-13-R-0006-0002.pdf PDF
Amendment_0002 _Att_1.pdf PDF
Questions_ _Responses__2.pdf PDF
Site_Visit_Minutes.pdf PDF
Att_2 _Revised_Wage_Decision_Jan_2015.pdf PDF
Att_3 _Revised_Contractor_Responsibility.pdf PDF
FA4809-13-R-0006-0001_Amendment.pdf PDF
Att_4 _Revised_Past_Performance_Questionnaire.pdf PDF
Questions_ _Responses__1.pdf PDF
13-R-0006_Solicitation.pdf PDF
Att_7 _Special_Events_Pass_Request.pdf PDF
Att_4 _Past_Performance_Questionnaire.pdf PDF
Att_5 _Offer_Sched_Combined.pdf PDF
Att_8 _IDIQ_Form_66_5Mar14.xls XLS spreadsheet
Att_6.2 _AF_66_Sample_Project.xls XLS spreadsheet
Att_2 _Wage_Decisions_Combined.pdf PDF
Att_3 _Contractor_Responsibility.pdf PDF
Att_6.5 _Sample_Project_Blank__3052.xlsx XLSX spreadsheet
Att_1 _Specifications_1_Aug_14_Final.pdf PDF
Att_6.4 _Sample_Proj_Drawings.pdf PDF
Att_6.3 _Sample_Project_Offer_Schedule.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVES

Sample Project F15-E Fuel Maintenance Apron

14 Mar 2014

1.GENERAL SCOPE OF WORK: The work covered by this Statement of Objectives consists of furnishing all equipment and material and performing all work in connection with the F15-e Fuel Maintenance Apron at Seymour Johnson AFB NC, in strict accordance with specifications and drawings, and subject to the terms and conditions of the basic contract. The work covered by this project includes, but is not limited to the following:

A. Remove and replace asphalt and concrete slabs, airfield markings, and site restoration per project drawings.

B. Dispose of all unsalvable materials from demolition, grading, and construction off base.

C. Provide submittals in accordance with the Schedule of Materials Submittals for this project.

2. Schedule: Submittal period 30 days, construction period 180 days.

3. Access: Contractor will be given access to the Slocumb Gate to be used for a hauling route.

4. Safety requirements and procedures: See section 01000 of contract specifications.

FA4809-13-R-0006

Attachment 6.1

File details come from the government source that posted it. Updated .