13-R-0006_Solicitation.pdf
PDF 389 KB Posted
- Attached to
- Repair Airfield/Base Pavements (IDIQ)
- Solicitation number
- FA4809-13-R-0006
About this file
FA4809-13-R-0006 Repair Airfield/Base Pavements (IDIQ)
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Airf ield/Base Pavements Indefinite Delivery, Indefinite Quanity (IDIQ) contract for Seymour Johnson AFB, located in North Carolina. A pre-proposal coverence/site visit is scheduled for 27 Jan 2015 at 09:00 am (EST). Only one pre-proposal converence w ill be held. Site visit(s) for each task order (TO) after contract aw ard w ill be scheduled as required.
1. Please enter your CAGE Code, Tax Identif ication Number (TIN), and DUNS Number in Block 14.
2. A seperate Notice to Proceed (NTP) w ill be issued for each task order.
3. This requirement is a 100% total HUBZone set-aside.
4. The NAICS Code is 237310.
5. The Small Business Size Standard is $36.5M.
6. The maximum contract value/program value is $35,000,000.00. The minimum per task order is $2,000. The guaranteed minimum for the life of the contract aw arded is $2,000.00. The maximum per task order is subject to statutory cost limitation: $4,000,000 (522 funding) and $750,000 (529 funding).
7. The DFAS Office that is responsible for payment w ill be identif ied in each task order.
NOTE: The performance period w ill be negotiatied for each task order. Each option period, if exercised, w ill be 365 calendar days.
SSGT JASON A. ENDICOTT 919-722-5423
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
06-Jan-2015
(RFP)
(IFB)
X
CALL:
Repair Airf ield/Base Pavements (IDIQ)
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10*
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________19 Feb 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
4TH CONTRACTING SQUADRON
1600 WRIGHT BROTHERS AVENUE, BLDG 3010
SEYMOUR JOHNSON AFB NC 27531-2459
FA4809
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
04:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
VKAG 13-1003
8. ADDRESS OFFER TO (If Other Than Item 7)
(919) 722-5414FAX:TEL: (919) 722-5411 TEL: FAX:
FA4809-13-R-0006 62
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA4809-13-R-0006
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Paving IDIQ Base Year
FFP
Paving IDIQ for repairing airfield and base pavements at Seymour Johnson and its associated sites in North Carolina. Period of Performance: From date of award through 365 calendar days. The total obligations of all contracts awarded including all exercised options shall not exceed the maximum ordering limitation/program value of $35,000,000.00.
FOB: Destination
NET AMT
0002 1 Lot OPTION Paving IDIQ Option Year 1
FFP
Paving IDIQ for repairing airfield and base pavements at Seymour Johnson and its associated sites in North Carolina. Period of Performance: 365 calender days from the end of the base year. The total obligations of all contracts awarded including all exercised options shall not exceed the maximum ordering limitation/program value of $35,000,000.00.
0003 1 Lot OPTION Paving IDIQ Option Year 2
FFP
Paving IDIQ for repairing airfield and base pavements at Seymour Johnson and its associated sites in North Carolina. Period of Performance: 365 calendar days from the end of option year 1. The total obligations of all contracts awarded including all exercised options shall not exceed the maximum ordering limitation/program value
0004 1 Lot OPTION Paving IDIQ Option Year 3
FFP
Paving IDIQ for repairing airfield and base pavements at Seymour Johnson and its associated sites in North Carolina. Period of Performance: 365 calendar days from the end of option year 2. The total obligations of all contracts awarded including all exercised options shall not exceed the maximum ordering limitation/program value
0005 1 Lot OPTION Paving IDIQ Option Year 4
FFP
Paving IDIQ for repairing airfield and base pavements at Seymour Johnson and its associated sites in North Carolina. Period of Performance: 365 calendar days from the end of option year 3. The total obligations of all contracts awarded including all exercised options shall not exceed the maximum ordering limitation/program value
NOTE 1: Offeror’s attention is invited to the insurance requirement contained in this solicitation, Section H, Special Contract Requirements H5. Evidence of required coverage for the prime contractor must be furnished prior to beginning of work.
NOTE 2: Offeror’s attention is invited to Section F, Clause 52.211-12, entitled “Liquidated Damages – Construction.”
NOTE 3: Any reference to any equipment, material, article, or patented process by trade name, make or catalog number shall be regarded as establishing a standard of quality control.
NOTE 4: Offeror's attention is invited to SF1442, Block 10, item 5. The maximum contract value is ($35,000,000.00). The Government intends to award a small project equal or greater than the guaranteed minimum of $2,000.00 as the first task order at time of contract award.
B-1. CLAUSES AND PROVISIONS
(a) Clauses and provisions from the Federal Acquisition Regulation (FAR), Defense Federal Acquisition Regulation Supplement (DFARS), AF FAR Supplement, are hereby incorporated by reference with the same force and effect as though herein set forth in full. As used in the following clauses, the term “Government” is deleted and the abbreviation “NAFI” is substituted in lieu thereof (applicable to NAF projects only). The date of each clause shall be the current date set forth in the FAR and supplements thereto, on the issuance date of this order or contract.
Clauses made inapplicable by the reference or by the kind of order or contract (e.g., orders or contracts for services instead of supplies) are self-deleting. The complete text of any clause incorporated herein by reference may be obtained from the Contracting Officer.
(b) The contract is renewable at the option of the Government, by the Contracting Officer giving written notice of renewal to the Contractor at least 30 calendar days prior to the contract expiration date IAW Clause, FAR 52.217- 9, Option to Extend the Term of the Contract.
(c) Clauses and provisions in this document will be numbered in sequence, but will not necessarily appear in consecutive order.
(d) Sections K, L, and M will be physically removed from any resultant award, but will be deemed to be incorporated, by reference, in that award.
Section C - Descriptions and Specifications
C-1
PART I - THE SCHEDULE
SECTION C
DESCRIPTIONS AND SPECIFICATIONS
CLAUSES INCORPORATED BY FULL TEXT
C-1. SPECIFICATIONS, STANDARDS AND DRAWINGS
(IAW FAR 11.201)
Specifications and drawings are listed in Section J as attachments.
Section E - Inspection and Acceptance
PART I – THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
E-1. DESIGNATION OF GOVERNMENT INSPECTOR: The Base Civil Engineer or his authorized representative is designated as the representative of the contracting officer for the purpose of technical surveillance of workmanship and inspection of materials for work being performed under this contract. This designation in no way authorizes anyone other than the contracting officer to commit the Government to changes in the terms of the contract.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 24-MAR-2015 TO
23-MAR-2016
N/A 4 CES
1095 PETERSON AVENUE
SEYMOUR JOHNSON AFB NC 27531
F3T3CE
0002 POP 24-MAR-2016 TO
23-MAR-2017
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 24-MAR-2017 TO
23-MAR-2018
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 24-MAR-2018 TO
23-MAR-2019
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 24-MAR-2019 TO
23-MAR-2020
N/A (SAME AS PREVIOUS LOCATION)
52.247-34 F.O.B. Destination NOV 1991 252.246-7000 Material Inspection And Receiving Report MAR 2008
PART I – THE SCHEDULE
SECTION F
DELIVERIES OR PERFORMANCE
F-1 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION SEP 2000
(IAW FAR 11.503(b))
For the purpose of this clause the blanks are completed as follows:
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $402.79 for the first day of delay and $ 277.79 for each successive day of delay until the work is completed or accepted. The liquidated damages will apply to all task orders where the delay significantly affects the mission of the customer as determined by the Contracting Officer.
Any task orders that require additional liquidated damages due to severe or exact impact to the mission (for instance: revenue generating facilities) will include language in the Task Order Proposal Request (TOPR) and resultant Task Order.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of Clause)
F-2 CONTRACT PERFORMANCE PERIOD
Performance period is for a 12-month base period and four 12-month option periods.
F-3 CONTRACT AMOUNTS
The contract guaranteed minimum is $2,000.00. The maximum contract value/program value is $35,000,000.00.
F-4 HOLIDAYS
The following Federal Legal Holidays are observed by this base:
New Year's Day 1 January Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
NOTE: "Any of the above holidays falling on a Saturday will be observed the preceding Friday, holidays falling on a Sunday will be observed on the following Monday."
Section G - Contract Administration Data
PART I – THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
G-1 ACCOUNTING AND APPROPRIATION DATA
ACCOUNTING AND APPROPRIATION DATA WILL BE CITED ON EACH TASK ORDER, BLOCK 17 OF
THE DD FORM 1155, AT TIME OF AWARD.
G-2 PAYMENT
SEE DFARS CLAUSES 252.232-7003, ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND
252.246-7000, MATERIAL INSPECTION AND RECEIVING REPORT. THE CONTRACTOR SHALL SUBMIT
PAYMENT REQUESTS USING WIDE AREA WORKFLOW-RECEIPT AND ACCEPTANCE (WAWF-RA).
Payment will be made by: The DFAS Office or designated paying office as noted in individual task orders.
In accordance with the Payments Under Fixed-Price Construction Contracts, FAR 52.232-5 and Prompt Payment for Construction Contracts, FAR 52.232-27. The contractor shall ensure the following have been accomplished and provided to the contracting office before submission of invoices: an approved progress report, sales tax report, payrolls, Standard Form(s) 1413, subcontractor pay data, and release of claims (if applicable). Invoices are not proper for payment and shall not be paid without the above having been accomplished.
The following link is provided as a useful tool for understanding WAWF:
https://wawf.eb.mil/xhtml/unauth/web/footer/VendorCustomerSupport.xhtml
G-3 CONTRACT ADMINISTRATION
Contract administration of any resultant contract will be performed by the following:
4TH CONTRACTING SQUADRON/LGCA
1600 WRIGHT BROTHERS AVENUE, BLDG 3010
SEYMOUR JOHNSON AFB NC 27531-2459
TELEPHONE (919) 722-5425
https://wawf.eb.mil/xhtml/unauth/web/footer/VendorCustomerSupport.xhtml
Section H - Special Contract Requirements
SECTION H
SPECIAL CONTRACT REQUIREMENTS
H-1 PREPARATION OF PROGRESS SCHEDULES AND REPORTS
The reports contemplated by the clause titled “Schedules for Construction Contracts” shall be accomplished on and in accordance with instructions pertaining to AF Form 3064, Contract Progress Schedule, and AF Form 3065, Contract Progress Report. The AF Form 3064 shall be provided to the Contracting Office not later than 15 calendar days after issuance of the Notice to Proceed.
H-2 MATERIAL APPROVAL SUBMITTAL FORM (AF FORM 3000)
The contractor AF Form 3000, as contemplated by the Materials and Workmanship Clause, shall submit all material and articles requiring approval. (See attached AF Form 66, Schedule of Materials Submittals). In addition the contractor is reminded that an individual within the company who has the authority to make the certification must sign the certification on the AF Form 3000.
H-3 UTILITY SERVICES
The Contracting Officer has determined that Government-operated utilities are adequate and will be furnished to the contractor without charge where existing outlets are available. The contractor is responsible for installing temporary service outlets, as necessary, and charges will be made in accordance with the clause entitled “Availability and Use of Utility Services” (Contract Clause 52.236-14). The following utilities will be available: Water.
H-4 HURRICANE SEASON
Hurricane season for the state of North Carolina is normally the period from 1 June through 30 November. During an actual hurricane condition, you may be contacted by this office and requested to secure equipment and clean up your work area. In accordance with contract clauses FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvement, and FAR 52.236-12, Cleaning Up, request you keep this in mind and maintain your work area free of debris and in a safe and secure condition at the completion of each workday, with particular care during the hurricane season.
H-5 REQUIRED INSURANCE
Reference FAR clause entitled “Insurance…” the Contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.
a. Workmen’s Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory. The required Workmen’s Compensation insurance shall extend to cover employer’s liability for accidental bodily injury or death and for occupational disease with a minimum liability of $100,000.
b. General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.
c. Automobile Liability Insurance. This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.
H-6 TELEGRAPHIC AND TELEFAX PROPOSALS/AMENDMENTS
Telegraphic and telefax proposals, or revisions to offeror proposals, are not acceptable. Initial proposals and revisions to the offeror proposals shall arrive at the 4th Contracting Squadron, 1600 Wright Brothers Avenue, Seymour Johnson AFB NC 27531-2459 prior to the time set for receipt of offers as shown in the solicitation. Initial proposals or revisions to proposals received after this time will not be considered. Offerors may acknowledge any resultant solicitation amendment(s) via telefax to (919) 722-5424 with the original forwarded in the US Postal System or other delivery medium.
H-7 ON-SITE OFFICE TRAILERS AND STORAGE TRAILERS/FACILITIES
a. The Contracting Officer will designate the exact location for the contractor’s storage area. Upon Contracting Officer’s approval, buildings and structures, which are part of the contract, may be used for storage provided the space is not required for occupancy and the contractor accepts full responsibility for storage therein.
b. Once an exact location has been determined, the contractor can use all approved and available services (i.e., electricity, water, and sewage) at the storage area. The Contracting Officer will inform the contractor whether or not the Government shall be reimbursed (and at what rate structure) for any or all such services.
H-8 SYSTEM FOR AWARD MANAGEMENT (SAM) (ANNUAL REPRESENTATIONS AND
CERTIFICATIONS)
a. All offerors in response to this solicitation shall complete electronic annual representations and certifications at https://www.sam.gov in conjunction with required registration in the System for Award Management (SAM) database. (See Section K for additional applicable solicitation-specific representations and certifications).
b. Prospective contractors shall update the representations and certifications submitted to SAM as necessary, but at least annually, to ensure they are kept current, accurate, and complete. The representations and certifications are effective until one year from date of submission or update to SAM.
H-9 BONDS
Performance and Payment Bonds/Alternative Payment Protection. The contractor shall be required to furnish a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25-A), each with good and sufficient surety or sureties, acceptable to the Government for each task order exceeding $150,000.00 within 14 calendar days after task order award. Payment protection shall be required for task orders between $30,000.00 and $150,000.00.
The contractor may use alternate payment protection for task orders between $30,000.00 and $150,000.00.
NOTE: A Notice to Proceed will not be issued and no work shall begin until good and sufficient surety has been received and accepted by the Contracting Officer.
H-10 ALTERNATIVE PAYMENT PROTECTION
For task orders between $30,000.00 and $150,000.00, the contractor shall provide one of the following alternative payment protections (IAW FAR 52.228-13) within 14 calendar days after task order award.
(1) Payment Bond
(2) Irrevocable Letter of Credit (ILC)
H-11 IDENTIFICATION/CITIZENSHIP IDENTIFICATION
The contractor shall ensure all employees working on Seymour Johnson Air Force Base possess proper identification and/or citizenship documentation. Under the Immigration and Nationality Act (INA), employers may hire only persons who may legally work in the United States (i.e., citizens and nationals of the U.S.) and aliens authorized to work in the U.S. The employer must verify the identity and employment eligibility of anyone to be hired (Ref: U. S.
Department of Labor: @ http://www.dol.gov/compliance/guide/aw.htm ).
https://www.sam.gov/ http://www.dol.gov/compliance/guide/aw.htm
Note: Contractor Labor Awareness Meetings (CLAMs) may be held semi-annually at Seymour Johnson AFB, NC.
The contractor will be advised of CLAM meetings in order that the contractor or his designated representative may attend.
H-12 USE OF RADIOACTIVE MATERIAL OR IONIZING RADIATION-PRODUCING EQUIPMENT
ON THE INSTALLATION
If using, transferring, transporting, or storing radioactive material or ionizing radiation-producing equipment in performance of this contract, the contractor shall comply with requirements specified in AFI 40-201 and SJAFBI 48-
148. The Contractor shall provide evidence of a valid Nuclear Regulatory Commission or Agreement State Radioactive Material License to the installation Radiation Safety Officer (RSO) and obtain written approval from the RSO 30 days prior to bringing any radioactive material onto the installation.
H-13 PRE-DESIGN AND/OR PRE-CONSTRUCTION CONFERENCE
Prior to starting work under a task order, contractors shall meet with the Contracting Officer and designated technical representative to discuss and develop mutual understandings concerning schedule and performance.
H-14 TASK ORDER PERFORMANCE PERIOD
Performance periods will be negotiated for each individual task order.
H-15 PREAWARD SITE INSPECTIONS
Contractors shall inspect project job sites with Government representatives. Any deficiencies, conflicts, or other areas of concern existing in the scope of work and/or applicable drawings should be brought to the attention of the Contracting Officer, in writing. The contractor shall also notify the Contracting Officer, in writing, upon observing any features in the design that appear to be ambiguous, confusing, conflicting, or erroneous.
H-16 NOTICE OF CONSTRUCTIVE CHANGES
No order, statement or direction of the Contracting Officer, an authorized representative of the Contracting Officer whether or not acting within the limits of their authority, or any other representatives of the Government, shall constitute a change order under the “Changes” clause of the contract or entitle the contractor(s) to an equitable adjustment of the price or delivery schedule, unless a change is issued in writing and signed by the Contracting Officer.
H-17 WAWF ELECTRONIC SUBMISSION OF PAYMENT REQUESTS
DFARS 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS APPLIES TO THIS
ORDER.
USE OF WAWF IS MANDATORY
Requests for payment shall be processed electronically via the Wide Area Work Flow (WAWF) system. Use of WAWF will speed payment processing time and allow you to monitor payment status online. There are no charges or fees to use WAWF. For information on WAWF go to https://wawf.eb.mil.
If you are currently not registered with WAWF, contact the WAWF help desk at 1-866-618-5988 or 1-801-605- 7095. The help desk will register your Cage Code. You will then be able to register your company in WAWF at https://wawf.eb.mil. A live training database is located at https://wawftraining.eb.mil. If you have any further questions, please contact the contract administrator listed on the front of the contract.
Questions concerning payment should be directed to the Defense Finance Accounting Services (DFAS) Limestone at 1-800-390-5620 or faxed to 1-866-392-7091. You must have your contract number and invoice number ready when inquiring about payment status. Payment information can also be accessed at the DFAS website:
http://www.dfas.mil.
The following BPN (Business Partner Number) codes will be required to route your invoices and e-mails to inspection/acceptance personnel through WAWF.
CAGE CODE:_(fill In)________
ISSUE DODAAC: FA4809
ADMIN DODAAC: FA4809
INSPECT BY DODAAC: FA4809
SERVICE ACCEPTOR: FA4809
SHIP TO CODE (EXT): F3T3CE (ATTN: In order to facilitate payment, the office to be held responsible for submitting the receiving report in WAWF has been entered. The actual delivery location is __(fill in)__)
PAY DODAAC: F67100
CONTRACT ADMINISTRATOR: jason.endicott@us.af.mil CONTRACTING OFFICER: kyle.donah@us.af.mil
TYPE OF INVOICE: Use the type of invoice indicated with "X" below:
__ Invoice as 2-in-1 (services only) __ Invoice and Receiving Report (combo) X Construction ( NOTE: Invoices to be submitted only AFTER receipt of approved AF FORM 3065, Contract Progress Report.)
mailto:jason.endicott@us.af.mil mailto:kyle.donah@us.af.mil
Section I - Contract Clauses
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-13 Contractor Code of Business Ethics and Conduct APR 2010 52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
APR 2014
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract
Awards
JUL 2013
52.204-13 System for Award Management Maintenance JUL 2013 52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for Debarment
AUG 2013
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
JUL 2013
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
MAY 2012
52.211-13 Time Extensions SEP 2000 52.211-18 Variation in Estimated Quantity APR 1984 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-21 Requirements for Certified Cost or Pricing Data or
Information Other Than Certified Cost or Pricing Data-- Modifications
OCT 2010
52.219-3 Notice of HUBZone Set-Aside or Sole Source Award NOV 2011 52.219-8 Utilization of Small Business Concerns MAY 2014 52.219-14 Limitations On Subcontracting NOV 2011 52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards Act - Overtime
Compensation
MAY 2014
52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014
52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities FEB 1999 52.222-26 Equal Opportunity MAR 2007 52.222-27 Affirmative Action Compliance Requirements for
Construction
FEB 1999
52.222-30 Construction Wage Rate Requirements--Price Adjustment (None or Separately Specified Method)
MAY 2014
52.222-35 Equal Opportunity for Veterans JUL 2014 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans JUL 2014 52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons FEB 2009 52.222-54 Employment Eligibility Verification AUG 2013 52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-11 Ozone-Depleting Substances MAY 2001 52.223-12 Refrigeration Equipment and Air Conditioners MAY 1995 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
MAY 2008
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.224-1 Privacy Act Notification APR 1984 52.224-2 Privacy Act APR 1984 52.225-9 Buy American--Construction Materials MAY 2014 52.225-10 Notice of Buy American Requirement--Construction Materials MAY 2014 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets JAN 2012 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.228-13 Alternative Payment Protections JUL 2000 52.228-14 Irrevocable Letter of Credit MAY 2014 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-2 North Carolina State and Local Sales and Use Tax APR 1984 52.229-3 Federal, State And Local Taxes FEB 2013 52.229-4 Federal, State, And Local Taxes (State and Local
Adjustments)
FEB 2013
52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-16 Progress Payments APR 2012 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts MAY 2014 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984 52.236-19 Organization and Direction of the Work APR 1984 52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -
Alternate I
APR 1984
52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.244-4 Subcontractors and Outside Associates and Consultants
(Architect-Engineer Services)
AUG 1998
52.244-6 Subcontracts for Commercial Items JUL 2014 52.245-1 Government Property APR 2012 52.245-9 Use And Charges APR 2012 52.246-1 Contractor Inspection Requirements APR 1984 52.246-12 Inspection of Construction AUG 1996 52.246-21 Alt I Warranty of Construction (Mar 1994) - Alternate I APR 1984 52.249-2 Alt I Termination for Convenience of the Government (Fixed-
Price) (Apr 2012) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General DEC 2012 252.203-7004 Display of Fraud Hotline Poster(s) DEC 2012 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7000 Disclosure Of Information AUG 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7005 Oral Attestation of Security Responsibilities NOV 2001 252.204-7006 Billing Instructions OCT 2005
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Terrorist Country
MAR 2014
252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010 252.223-7001 Hazard Warning Labels DEC 1991 252.223-7002 Safety Precautions For Ammunition And Explosives MAY 1994 252.223-7003 Changes In Place Of Performance--Ammunition And
Explosives
DEC 1991
252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage And Disposal Of Toxic And
Hazardous Materials
APR 2012
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7012 Preference For Certain Domestic Commodities FEB 2013 252.225-7025 Restriction on Acquisition of Forgings DEC 2009 252.225-7048 Export-Controlled Items JUN 2013 252.227-7024 Notice and Approval of Restricted Designs APR 1984 252.227-7033 Rights in Shop Drawings APR 1966 252.231-7000 Supplemental Cost Principles DEC 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7004 DOD Progress Payment Rates OCT 2001 252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.236-7005 Airfield Safety Precautions DEC 1991 252.236-7006 Cost Limitation JAN 1997 252.236-7013 Requirement for Competition Opportunity for American Stell
Producers, Fabricators, and Manufacturers
JUN 2013
252.243-7002 Requests for Equitable Adjustment DEC 2012 252.246-7000 Material Inspection And Receiving Report MAR 2008 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within the timeframe specified in each individual task order calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the time specified in each task order.
The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.216-19 ORDER LIMITATIONS. (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,000, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor:
(1) Any order for a single item in excess of $4,000,000;
(2) Any order for a combination of items in excess of $4,000,000; or
(3) A series of orders from the same ordering office within 1 calendar days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.
(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 3 calendar days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.216-22 INDEFINITE QUANTITY. (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after completion date of this contract or the last active task order, or reaching the maximum limitation, whichever occurs first.
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days;
provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years.
52.222-99 ESTABLISHING A MINIMUM WAGE FOR CONTRACTORS (DEVIATION 2014-O0017) (JUNE 2014) This clause implements Executive Order 13658, Establishing a Minimum Wage for Contractors, dated February 12, 2014, and OMB Policy Memorandum M-14-09, dated June 12, 2014.
(a) Each service employee, laborer, or mechanic employed in the United States (the 50 States and the District of Columbia) in the performance of this contract by the prime Contractor or any subcontractor, regardless of any contractual relationship which may be alleged to exist between the Contractor and service employee, laborer, or mechanic, shall be paid not less than the applicable minimum wage under Executive Order 13658. The minimum wage required to be paid to each service employee, laborer, or mechanic performing work on this contract between January 1, 2015, and December 31, 2015, shall be $10.10 per hour.
(b) The Contractor shall adjust the minimum wage paid under this contract each time the Secretary of Labor’s annual determination of the applicable minimum wage under section 2(a)(ii) of Executive Order 13658 results in a higher minimum wage. Adjustments to the Executive Order minimum wage under section 2(a)(ii) of Executive Order 13658 will be effective for all service employees, laborers, or mechanics subject to the Executive Order beginning January 1 of the following year. The Secretary of Labor will publish annual determinations in the Federal Register no later than 90 days before such new wage is to take effect. The Secretary will also publish the applicable minimum wage on www.wdol.gov (or any successor website). The applicable published minimum wage is incorporated by reference into this contract.
(c) The Contracting Officer will adjust the contract price or contract unit price under this clause only for the increase in labor costs resulting from the annual inflation increases in the Executive Order 13658 minimum wage beginning on January 1, 2016. The Contracting Officer shall consider documentation as to the specific costs and workers impacted in determining the amount of the adjustment.
(d) The Contractor Officer will not adjust the contract price under this clause for any costs other than those identified in paragraph (c) of this clause, and will not provide price adjustments under this clause that result in duplicate price adjustments with the respective clause of this contract implementing the Service Contract Labor Standards statute (formerly known as the Service Contract Act) or the Wage Rate Requirements (Construction) statute (formerly known as the Davis Bacon Act).
(e) The Contractor shall include the substance of this clause, including this paragraph (e) in all subcontracts.
52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-
DESIGNATED ITEMS (MAY 2008)
(a) Definitions. As used in this clause--
Postconsumer material means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”
Recovered material means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall--
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and
(2) Submit this estimate to 4th Contracting Squadron, 1600 Wright Brothers Ave., Bldg 3010, Seymour Johnson AFB, NC 27531.
52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY
2014)
(a) Definitions. As used in this clause--
Caribbean Basin country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4)such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Designated country means any of the following countries:
(1) A World Trade Organization Government Procurement Agreement country (Armenia, Aruba, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan or United Kingdom);
(2) A Free Trade Agreement country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);
(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or
(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St.
Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).
Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.
Domestic construction material means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if--
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
Least developed country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a least developed country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .