Att_6.4 _Sample_Proj_Drawings.pdf
PDF 4 MB Posted
- Attached to
- Repair Airfield/Base Pavements (IDIQ)
- Solicitation number
- FA4809-13-R-0006
About this file
SAMPLE PROJECT DRAWINGS
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
10 9
B
C
D
8 7 6
E
F
G
H
S I G
N A
T U
R E
S
C O
N T
R A
C T
M
G M
T
C E
O U
S I N
G
A
G E
N C
Y
45 3
U N
I T
E D
S
A
T E
S
A
I R
F
O R
C
V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S E
Y M
O U
R
J O
H N
S O
N
A
R
B
S
E
N
O R
H
R
O L I N
A
2 1
P R
O J E
T
L E
PROJECT NUMBER
SHEET
DRAWN BY
DRAWING NUMBER
SCALE
DATE
T H
D R
A W
I N
G
S
H E
N
M
E
A
F I R
E
C
H I E
F
C E
V
I R
O N
M E
N T
A L
C O
M M
U N
I C
A T
I O
N S
B
V
I R
O N
M E
N T
A L
S A
F E
T Y
B
C
C H
I E
F
T
E C
H N
I C
L
U P
P O
E
M E
N T
P R
O J E
G
I N
E E
R C
H I E
F
D
E S
I G
N
E
L E
M E
N T
D
T H
C
I L
I T
Y
C
O N
T A
I N
S
A
C M
L
P
T
E R
I A
A
T
W
I L
L
A S
B E
S T
N
T A
I N
I N
G
M
A T
E R
I A
C M
A N
D
L
E A
D
B
A S
I N
T
L
B P
S
T A
T E
M E
N T
T H
C
I L
I T
Y
C
O N
T A
I N
S
N
O
A
C M
L
T
E R
I A
L S
T H
C
I L
I T
Y
C
O N
T A
I N
S
A
C M
L
T
E R
I A
A
T
W
I L
L
T H
C
I L
I T
Y
C
O N
T A
I N
S
A
C M
L
T
E R
I A
A
T
W
I L
L
T H
C
I L
I T
Y
C
O N
T A
I N
S
A
C M
L
T
E R
I A
A
T
W
I L
L
M
O V
Y
M
L
M
O V
N
T R
A C
T O
R
F
T
A
O
J E
C T
R E
M O
V E
D
B
Y
T
R
C E
M
O V
D
N
T R
A C
T
A P
P R
O V
I E
F
E
N G
I N
E E
R
F O
R C
E
P
R O
T E
C T
I O
N
A N
T I T
E R
R O
R I S
M
A P
P R
O V
E
F
R E
V D
E S
C R
I P
T I O
N
G
H
T
R
U
O
F
F
T
U
B
D A
T E
A P
P R
V D
H
T
S
R
I
E
VKAG 04-1402
REPAIR F-15E FUEL MAINTENANCE APRON
VKAG 04-1402
R E
P A
E
L
M
A I N
T E
N A
N C
E
A
P R
O N
L O
C A
T I O
N
P
L A
N
A
A
W I N
G
I N
D E
X
G-1
CEPT
16 DEC 2013
1" = 800'
LOCATION PLAN
SCALE: 1"=800'
FINAL DETERMINATION REVEALS NO PRIME OR UNIQUE
FARMLAND ON THE BASE
NOTE
BASE CONTRACTING
BASE CIVIL ENGINEER
GATE 2 (BACK GATE)
CONTRACTOR'S
STORAGE AREA
GATE 1 (MAIN GATE)
VISITOR'S CENTER
MAG. VAR
. 9°-22'W
JUN 11
N
PROJECT LOCATION
DRAWING INDEX
DWG NO SHT NO DESCRIPTION
G-1 1 LOCATION PLAN AND DRAWING INDEX
C-1 2 PHASING PLAN
C-2 3 EXISTING SITE AND DEMOLITION PLAN
C-3 4 SLAB REPLACEMENT PLAN
C-4 5 STATIC GROUND PLAN
C-5 6 PAVEMENT STRIPING PLAN
C-6 7 CIVIL DETAILS
HAUL ROUTE
FA4809-13-R-0006
Attachment 6.4
1245 3
T
R
F
U
B
T
A P
P R
V D
D A
T E
I
T
S
R
O
F
U
G
D E
S C
R I P
T I O
N R
E V
F
E
H
D
C
B
P R
O J E
T
L E
D R
A W
I N
G
S
H E
M
E
SCALE
DATE
T H
U N
I T
A
T E
S
A
R
C
V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S E
Y M
O U
R
J O
H N
S O
N
A
R
S
E
N
O R
R
O L I N
A
SHEET
DRAWN BY
OF
PROJECT NUMBER
245 3
DRAWING NUMBER
A
678910
G
F
E
H
D
C
B
678910
A
V:\PROJECTS\FY-04\VKAG 04-1402\VKAG 04-1402 C-1.dwg
P R
O J E
A
S E
C O
N T
R A o
T A
K
D
P A
E
L
M
A I N
T E
N A
N C
E
A
P R
O N
P H
A S
I N
G
P
L A
N
16 DEC 2013
AS SHOWN
CENME
C-1
VKAG 04-1402
D E
S I G
N
030' 30' 90'
1"=30'
N
MAG. VAR. 9°-22'W
JUN '11
PHASE 2 WORK
PHASE 1 WORK
LEGEND
NOTES:
1. DURING ALL CONSTRUCTION PHASES, TEMPORARY CENTERLINE PATHS SHALL BE
PROVIDED PER SPECIFICATIONS.
2. TEMPORARY MARKINGS SHALL BE COORDINATED WITH AIRFIELD MANAGEMENT
PRIOR TO PAINTING.
3. THIS PROJECT MUST ALLOW FOR USER ACCESS OF 1 BAY AT ALL TIMES PER THE
PHASING PLAN. THE NORTHERN BAYS SHALL BE OPEN DURING PHASE I AND THE
ONE SOUTHERN BAY SHALL BE OPEN DURING PHASE II.
4. LAYDOWN AREA FOR MATERIALS AND EQUIPMENT SHALL BE COORDINATED WITH
AIRFIELD MANAGER AND BASE CIVIL ENGINEER.
5. FOD FENCE REQUIRED TO ISOLATE CONSTRUCTION IN EACH PHASE
CURB DEPRESSION
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
FA4809-13-R-0006
T
R
F
U
B
T
A P
P R
V D
D A
T E
I
T
S
R
O
F
U
G
D E
S C
R I P
T I O
N R
E V
F
E
H
D
C
B
P R
O J E
T
L E
D R
A W
I N
G
S
H E
M
E
SCALE
DATE
T H
U N
I T
A
T E
S
A
R
C
V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S E
Y M
O U
R
J O
H N
S O
N
A
R
S
E
N
O R
R
O L I N
A
SHEET
DRAWN BY
OF
PROJECT NUMBER
245 3
DRAWING NUMBER
A
678910
G
F
E
H
D
C
B
678910
A
V:\PROJECTS\FY-04\VKAG 04-1402\VKAG 04-1402 C-2.dwg
P R
O J E
A
S E
C O
N T
R A
T A
D
P A
E
L
M
A I N
T E
N A
N C
E
A
P R
O N
E X
I S
T I N
G
S
I T
E
A
M
O L I T
I O
N
P
L A
N
16 DEC 2013
AS SHOWN
CENME
C-2
VKAG 04-1402
D E
S I G
N
030' 30' 90'
1"=30'
N
MAG. VAR. 9°-22'W
JUN '11
R SLAB TO BE REMOVED (15" THICK)
CURB/GUTTER TO BE REMOVED
REMOVE ASPHALT PAVEMENT
LEGEND
GENERAL NOTES:
1. ACCESS TO WORK SITE MUST BE COORDINATED WITH BASE CE AND BASE OPERATIONS.
2. SLABS SHOWN SHALL BE REMOVED AND REPLACED TO EXISTING THICKNESS. EXISTING
PAVEMENT THICKNESS SHOWN FROM BEST AVAILABLE INFORMATION. THE CONTRACTOR
SHALL INFORM THE CONTRACTING OFFICER OF ANY DISCREPANCIES PRIOR TO REPLACING
SLABS.
3. SUBGRADE BENEATH SLABS SHALL BE COMPACTED TO 98%+ MAX DENSITY IF SOIL IS
DISTURBED OR IF FILL MATERIAL IS REQUIRED.THE CONTRACTOR IS RESPONSIBLE TO KEEP
SLAB AREA FREE OF RAIN AND EXCESSIVE MOISTURE.
4. PAINT PAVEMENT MARKINGS ON ALL NEW CONCRETE OR ASPHALT SURFACES WILL BE
REPLACED BY THE CONTRACTOR IN THEIR ORIGINAL LOCATION. THE CONTRACTOR SHALL BE
RESPONSIBLE TO LOCATE EXISTING PAINT MARKINGS (PRIOR TO REMOVAL), LAYOUT AND
REPAINT ALL MARKINGS REMOVED OR DAMAGED BY CONSTRUCTION DESCRIBED IN THESE
PLANS.
5. CONTRACTOR SHALL BE RESPONSIBLE TO SURVEY EXISTING CONCRETE ELEVATIONS, PRIOR
TO REMOVAL, AND REPLACE ALL SLABS WITH 650 FLEXURAL STRENGTH CONCRETE. SLABS
SHALL BE FLUSH WITH EXISTING SLABS TO REMAIN - NO PONDING ON NEW WORK SHALL BE
ACCEPTABLE. CONTRACTOR SHALL SAW CUT AND SEAL NEW JOINTS WITH DOW CORNING
890SL OR APPROVED EQUAL PER MANUFACTURER'S RECOMMENDATIONS.
6. CONCRETE SLABS TO BE REMOVED SHALL BE SAW CUT, FULL DEPTH AROUND THE
PERIMETER ADJACENT TO CONCRETE PAVEMENT TO REMAIN AND AGAIN 1 FOOT INSIDE OF
THE FIRST CUT. ALL DEBRIS SHALL BE REMOVED BY CONTRACTOR AND DISPOSED OF OFF
BASE. THE CONTRACTOR SHALL EXERCISE CAUTION TO ENSURE NO DAMAGE OCCURS TO
SLABS OR ASPHALT PAVEMENT ADJACENT TO SLABS BEING REPLACED.
7. CONTRACTOR SHALL REPLACE ALL TIE-DOWN/GROUNDING POINTS THAT ARE REMOVED.
8. PATCH ASPHALT PAVEMENT AS REQUIRED BY CONCRETE PAVEMENT.
9. PROJECT MUST BE PHASED & COORDINATED TO ALLOW ONE BAY OF BLDG. 4735 TO BE
ACCESSIBLE AT ALL TIMES.
PHASE 2 WORK
PHASE 1 WORK
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
30" CURB & GUTTER
TO BE REMOVED
CONCRETE
TO REMAIN
REMOVE ASPHALT PAVEMENT &
EXCAVATE AS REQUIRED FOR
NEW CONCRETE PAVEMENT
MILL OR REMOVE
ASPHALT
SAW CUT
SAW CUT
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
EXISTING DRAIN
TO REMAIN
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
FA4809-13-R-0006
T
R
F
U
B
T
A P
P R
V D
D A
T E
I
T
S
R
O
F
U
G
D E
S C
R I P
T I O
N R
E V
F
E
H
D
C
B
P R
O J E
T
L E
D R
A W
I N
G
S
H E
M
E
SCALE
DATE
T H
U N
I T
A
T E
S
A
R
C
V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S E
Y M
O U
R
J O
H N
S O
N
A
R
S
E
N
O R
R
O L I N
A
SHEET
DRAWN BY
OF
PROJECT NUMBER
245 3
DRAWING NUMBER
A
678910
G
F
E
H
D
C
B
678910
A
V:\PROJECTS\FY-04\VKAG 04-1402\VKAG 04-1402 C-3.dwg
P R
O J E
A
S E
C O
N T
R A
T A
D
P A
E
L
M
A I N
T E
N A
N C
E
A
P R
O N
S L A
B
R
E P
L A
C E
M E
A
N
16 DEC 2013
AS SHOWN
CENME
C-3
VKAG 04-1402
D E
S I G
N
030' 30' 90'
1"=30'
GENERAL NOTES:
1. ACCESS TO WORK SITE MUST BE COORDINATED WITH BASE CE AND BASE OPERATIONS.
2. SLABS SHOWN SHALL BE REMOVED AND REPLACED TO EXISTING THICKNESS. EXISTING
PAVEMENT THICKNESS SHOWN FROM BEST AVAILABLE INFORMATION. THE CONTRACTOR
SHALL INFORM THE CONTRACTING OFFICER OF ANY DISCREPANCIES PRIOR TO REPLACING
SLABS.
3. SUBGRADE BENEATH SLABS SHALL BE COMPACTED TO 98%+ MAX DENSITY IF SOIL IS
DISTURBED OR IF FILL MATERIAL IS REQUIRED.THE CONTRACTOR IS RESPONSIBLE TO KEEP
SLAB AREA FREE OF RAIN AND EXCESSIVE MOISTURE.
4. PAINT PAVEMENT MARKINGS ON ALL NEW CONCRETE OR ASPHALT SURFACES WILL BE
REPLACED BY THE CONTRACTOR IN THEIR ORIGINAL LOCATION. THE CONTRACTOR SHALL BE
RESPONSIBLE TO LOCATE EXISTING PAINT MARKINGS (PRIOR TO REMOVAL), LAYOUT AND
REPAINT ALL MARKINGS REMOVED OR DAMAGED BY CONSTRUCTION DESCRIBED IN THESE
PLANS.
5. CONTRACTOR SHALL BE RESPONSIBLE TO SURVEY EXISTING CONCRETE ELEVATIONS, PRIOR
TO REMOVAL, AND REPLACE ALL SLABS WITH 650 FLEXURAL STRENGTH CONCRETE. SLABS
SHALL BE FLUSH WITH EXISTING SLABS TO REMAIN - NO PONDING ON NEW WORK SHALL BE
ACCEPTABLE. CONTRACTOR SHALL SAW CUT AND SEAL NEW JOINTS WITH DOW CORNING
890SL OR APPROVED EQUAL PER MANUFACTURES RECOMMENDATIONS.
6. CONCRETE SLABS TO BE REMOVED SHALL BE SAW CUT, FULL DEPTH AROUND THE
PERIMETER ADJACENT TO CONCRETE PAVEMENT TO REMAIN AND AGAIN 1 FOOT INSIDE OF
THE FIRST CUT. ALL DEBRIS SHALL BE REMOVED BY CONTRACTOR AND DISPOSE OF OFF
BASE. THE CONTRACTOR SHALL EXERCISE CAUTION TO ENSURE NO DAMAGE OCCURS TO
SLABS OR ASPHALT PAVEMENT ADJACENT TO SLABS BEING REPLACED.
7. CONTRACTOR SHALL REPLACE ALL TIE-DOWN/GROUNDING POINTS THAT ARE REMOVED.
8. PATCH ASPHALT PAVEMENT AS REQUIRED BY CONCRETE PAVEMENT INSTALLATION.
9. PROJECT MUST BE PHASED & COORDINATED TO ALLOW ONE BAY OF BLDG. 4735 TO BE
ACCESSIBLE AT ALL TIMES.
10. CONTRACTOR SHALL HYDRO-SEED ALL DISTURBED AREAS WITH BERMUDA SEED. GRADE
TOPSOIL TO ENSURE POSITIVE DRAINAGE.
INDICATES JOINT TYPE
X
30" CURB/GUTTER
NEW CONCRETE SLABS (15" THICK)
LEGEND
+ GROUND ROD (SEE DETAIL C-6)
N
MAG. VAR. 9°-22'W
JUN '11
NEW CONCRETE
SLAB (TYP.)
NEW 30" CURB
& GUTTER
SEE DETAIL
C-6
B
B
B
B
B
B
NEW ASPHALT PAVEMENT
(2" THICK) MATCH GRADES
A
B
B
B
B
B
B
C
A
A
A
A
ASPHALT
B
A
C
A
A
D
CURB DEPRESSION
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
FA4809-13-R-0006
T
R
F
U
B
T
A P
P R
V D
D A
T E
I
T
S
R
O
F
U
G
D E
S C
R I P
T I O
N R
E V
F
E
H
D
C
B
P R
O J E
T
L E
D R
A W
I N
G
S
H E
M
E
SCALE
DATE
T H
U N
I T
A
T E
S
A
R
C
V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S E
Y M
O U
R
J O
H N
S O
N
A
R
S
E
N
O R
R
O L I N
A
SHEET
DRAWN BY
OF
PROJECT NUMBER
245 3
DRAWING NUMBER
A
678910
G
F
E
H
D
C
B
678910
A
V:\PROJECTS\FY-04\VKAG 04-1402\VKAG 04-1402 C-4.dwg
P R
O J E
A
S E
C O
N T
R A
T A
D
P A
E
L
M
A I N
T E
N A
N C
E
A
P R
O N
S T
A T
G
O
U N
D
P
L A
N
16 DEC 2013
AS SHOWN
CENME
C-4
VKAG 04-1402
D E
S I G
N
030' 30' 90'
1"=30'
GENERAL NOTES:
1. ACCESS TO WORK SITE MUST BE COORDINATED WITH BASE CE AND BASE OPERATIONS.
LEGEND
+ GROUND ROD (SEE DETAIL C-6)
N
MAG. VAR. 9°-22'W
JUN '11
F
F
F
F
F
F
F
F
TYP GROUND POINT
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
FA4809-13-R-0006
T
R
F
U
B
T
A P
P R
V D
D A
T E
I
T
S
R
O
F
U
G
D E
S C
R I P
T I O
N R
E V
F
E
H
D
C
B
P R
O J E
T
L E
D R
A W
I N
G
S
H E
M
E
SCALE
DATE
T H
U N
I T
A
T E
S
A
R
C
V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S E
Y M
O U
R
J O
H N
S O
N
A
R
S
E
N
O R
R
O L I N
A
SHEET
DRAWN BY
OF
PROJECT NUMBER
245 3
DRAWING NUMBER
A
678910
G
F
E
H
D
C
B
678910
A
V:\PROJECTS\FY-04\VKAG 04-1402\VKAG 04-1402 C-5.dwg
P R
O J E
A
S E
C O
N T
R A
T A
D
P A
E
L
M
A I N
T E
N A
N C
E
A
P R
O N
P A
V E
M E
R
I P
I N
G
P
L A
N
16 DEC 2013
AS SHOWN
CENME
C-5
VKAG 04-1402
D E
S I G
N
030' 30' 90'
1"=30'
GENERAL NOTES:
1. ACCESS TO WORK SITE MUST BE COORDINATED WITH BASE CE AND BASE OPERATIONS.
N
MAG. VAR. 9°-22'W
JUN '11
STRIPING DETAIL
SCALE= 1" = 1'-0"
F
F
F
F
F
F
F
F
TYP STRIPING
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
6" 6" 6"
SOLID YELLOW
SOLID BLACKSOLID BLACK
FA4809-13-R-0006
T
R
F
U
B
T
A P
P R
V D
D A
T E
I
T
S
R
O
F
U
G
D E
S C
R I P
T I O
N R
E V
F
E
H
D
C
B
P R
O J E
T
L E
D R
A W
I N
G
S
H E
M
E
SCALE
DATE
T H
U N
I T
A
T E
S
A
R
C
V
G
I N
E E
R
S
Q U
A D
R O
N
S E
Y M
O U
R
J O
H N
S O
N
A
R
S
E
N
O R
R
O L
I N
A
SHEET
DRAWN BY
OF
PROJECT NUMBER
245 3
DRAWING NUMBER
A
678910
G
F
E
H
D
C
B
678910
A
V:\PROJECTS\FY-04\VKAG 04-1402\VKAG 04-1402 C-6.dwg
P R
O J E
A
S E
C O
N T
R A
T A
D
P A
E
L
M
A I N
T E
N A
N C
E
A
P R
O N
C I V
T
A I L
S
16 DEC 2013
AS SHOWN
CENME
C-6
VKAG 04-1402
D E
S I G
N
STATIC GROUND POINTS:
1. STATIC GROUNDING POINTS WILL BE INSTALLED USING A MINIMUM 3-METER (10-FOOT) ROD WITH A CLOSED
EYE. THE 3-METER (10-FOOT) ROD WILL HAVE A DIAMETER OF NOT LESS THAN 19 MILLIMETERS (0.75 INCH)
AND THE TOP WILL BE A CLOSED FORGED EYE OR A SHEPARD'S HOOK BEN WITH CLAMPED SLEEVE, HAVING
AN INSIDE DIAMETER OF NOT LESS THAN 40 MILLIMETERS (1.5 INCH). THE ROD MAY BE COPPER, COPPER-CLAD STEEL, GALVANIZED STEEL, OR COPPER-ZINC-SILLICONE ALLOY.
2. THE COPPER CLADDING SHALL BE NOT LESS THAN 0.25 MM (0.010 INCH) THICK AT ANY POINT.
3. ON APRONS, STENCIL THE PAVEMENT NEAR EACH STATIC GROUND WITH THE LEGEND "STATIC GROUND
ONLY" IN 102-MILLIMETER (4-INCH) BLOCK LETTERS. BLACK LETTERING ON A YELLOW BACKGROUND THAT
EXTENDS A MINIMUM OF 51 MM (21 IN) BEYOND THE OUTERMOST EDGES OF THE LETTERS IS
RECOMMENDED.
4. THE MAXIMUM RESISTANCE OF NEW STATIC GROUNDS, MEASURED IN ACCORDANCE WITH IEEE STANDARD
81, SHOULD NOT EXCEED 10,000 OHMS UNDER NORMAL DRY CONDITIONS.
THIS SHEET
SEE JOINT DETAILS
1 1/4" DIA. X 20" DOWEL
PAINT AND OIL
ONE END OF DOWEL
15"
AT 15" O.C.
THICKNESS
1/2
A
LONGITUDINAL CONSTRUCTION JOINT
FOR NEW CONCRETE PAVEMENTS
NTS
SEE JOINT DETAILS THIS SHEET
B
TRANSVERSE CONTRACTION JOINT
FOR NEW CONCRETE PAVEMENTS
NTS
INITIAL SAW CUT
THICKNESS MINIMUM)
THICKENED EDGE DETAIL
NTS
C
5' MIN
EXPANSION JOINT BETWEEN
NEW AND EXISTING CONCRETE
NTS
D
5/8" EXPANSION
JOINT MAT.
V A
R I E
S
EXISTING CONCRETE
THIS SHEET
SEE JOINT DETAIL
5' MIN.
NEW CONCRETE
EXPANSION JOINT MATERIAL
EITHER SPECIFIED OR EXISTING
JOINT BOTTOM
SEPARATING TAPE
POURED JOINT SEALANT
NOTES:
1. SEPARATING TAPE OR NONABSORBENT TAPE REQUIRED TO
PREVENT JOINT SEALANT FROM FLOWING INTO SAWCUT, TO
SEPARATE NONCOMPATIBLE MATERIALS AND TO PREVENT
JOINT SEALANTS FROM BONDING TO BOTTOM OF RESERVOIR.
2. TOP OF SEALANT WILL BE 1/4" BELOW TOP OF PAVEMENT.
3. IF REPAIRING EXISTING JOINT, REMOVE EXISTING JOINT
MATERIAL DOWN THE THE REQUIRED DEPTH.
4. D/W=S SHALL BE 1.0<S<1.5 OR PER MANUFACTURER'S
RECOMMENDATIONS.
AIRFIELD PAVEMENT SURFACE
EXPANSION JOINT SEALANT DETAIL
NTS
SAWCUT OR BUTT
CRACK
SEALER
JOINT
POURED
SURFACE
PAVEMENT
RECESS=1/4"
BACKER
MATERIAL
JOINT
BOTTOM
JOINT SEALANT DETAIL
NTS
INITIAL
FOREIGN OBJECT DEBRIS FENCE DETAIL
NTS
SANDBAGS
(AS REQUIRED)
MESH, STAPLED
COVERED WITH BURLAP
2"x4" 12GA. WWF
(PRESSURE TREATED)
2"X4"
SANDBAGS (AS REQUIRED)
4' O.C.
FENCE SUPPORTS
WARNING LIGHT (LOCATE 16' 0C)
BATTERY OPERATED FLASHING
TO CONSTRUCTION
SECTION BB
(COPPERWELD OR APPRV'D EQUAL)
3/4"Ø x 10'-0" GROUND ROD
COMPRESSED ON ROD
COPPER SLEEVE
A
2"
SECTION AA
(COPPERWELD OR APPRV'D EQUAL)
3/4"Ø x 10'-0" GROUND ROD
7"
PLAN
B
B
A A
STATIC /GROUND ROD DETAIL
NTS
JOINT SEALANT
2'-6"
6"
FA4809-13-R-0006
| 1 G-1 LOCATION PLAN AND DRAWING INDEX |
| 2 C-1 PHASING PLAN |
| 3 C-2 EXISTING SITE AND DEMOLITION PLAN |
| 4 C-3 SLAB REPLACEMENT PLAN |
| 5 C-4 STATIC GROUND PLAN |
| 6 C-5 PAVEMENT STRIPING PLAN |
| 7 C-6 CIVIL DETAILS |
File details come from the government source that posted it. Updated .