Attachment 09 - Questions and Answers.pdf

PDF 186 KB Posted

Attached to
Bldg 1947 Repair Drop Arms
Solicitation number
FA480326QE0030
Issued by

About this file

This is a Questions and Answers document for federal contract solicitation FA480326QE030, issued by the 20th Contracting Squadron at Shaw Air Force Base, South Carolina on 15 September 2026. The solicitation addresses the repair and replacement of drop arms (crash arms) at the facility.

Key clarifications provided include: the correct wage determination is SC20260036; crash arm specifications require Model M30 (not M30C); traffic lights are not required on the new crash arms; existing key control pads, bollards, control panels, hydraulic cabinets, and power feeds do not require replacement; both crash arms may be constructed simultaneously; concrete barrier foundations do not require painting; exit sensor loops are not required; and periodic preventative maintenance is not mandated during the one-year warranty period. The contractor is not responsible for installing and connecting control wires, hooking up loop controls, keypad controls, or programming arm operation. Removed existing crash arms must be disposed of offsite by the contractor. Field personnel may combine the roles of Superintendent, Quality Control, and Site Safety and Health Officer (triple-hat arrangement). Notice to Proceed (NTP) will be issued during the Pre-Construction Meeting to allow the awardee to place material orders; material delivery is approximately 14 weeks after submittal approval, with the performance start date specified in the NTP. All proposals must acknowledge this Questions and Answers document and any amendments to avoid being found nonresponsive. Questions should be directed to Contracting Specialist SrA Tariq Ellis or Contracting Officer SSgt Justin Moechnig.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

20TH FIGHTER WING (ACC)

SHAW AIR FORCE BASE SOUTH CAROLINA

VICTORY BY VALOR

CUI

15 September 2026

MEMORANDUM FOR SOLICITATION

FROM: 20th Contracting Squadron/PKB

321 Cullen Street, Building 216 Shaw Air Force Base, SC 29150

SUBJECT: FA480326QE030, Repair Drop Arms – Questions and Answers

1. The solicitation lists the Wage determination as SC20260030 but the one that was uploaded to the SAM site was SC20260036. Please clarify and provide the correct one.

a. Wage Determination has been updated.

2. The specs for the crash arm lists model asM30. The spec has a M30 & M30C.

Please clarify.

a. M30

3. Does the govt require the new crash arms to have the traffic light attached on the arm?

a. No

4. Do the existing key control pads & bollards require replacement?

a. No

5. Do the existing control panels, hydraulic cabinets & pads require replacement?

a. No

6. Do the crash arms require to be changed one at a time or can both be under construction simultaneously?

a. Simultaneously

7. Do the new concrete barrier foundations require painting?

a. No

8. Will a new power feed to the control box need to be replaced?

a. No

9. Will the govt install & connect the control wire, hook up the loop controls, keypad controls and program operation of the arm?

a. No

10. The typical warranty for govt work is one year for parts & labor after acceptance to correct any issues of operation or failure during the year. The SOW lists a requirement for a one year maintenance warranty. Please clarify if the govt is requiring the need for periodic preventative maintenance during the one year period?

a. No

11. Will the govt take possession of any removed existing crash arms for spare parts or are they required to be disposed of offsite?

a. Disposed offset

12. The existing exit gate does not currently have a exit sensor loop installed, will the new system require an exist loop?

a. No

13. Will the govt require a separate field person for Superintendent, Quality Control & SSHO or can these positions be triple hat for management of the project?

a. Triple Hat

14. Material delivery is approx. 14 weeks after submittal approval, Will NTP be issued after all material is on site?

a. Notice to Proceed (NTP) will be issued to the awardee during the Pre- Construction Meeting. The performance start date listed in the NTP will be the date actual work must begin. The NTP will be issued during the Pre-Con to confirm understanding by both parties and allow the awardee to place orders.

15. All other information as stated in the Solicitation remains unchanged.

16. Note: Please ensure you include acknowledgement of this and all amendments in your proposal. Failure to do so may result in your proposal being found nonresponsive.

17. Please direct all concerns to the Contracting Specialist, SrA Tariq Ellis at tariq.ellis@us.af.mil and the Contracting Officer, SSgt Justin Moechnig at justin.moechnig@us.af.mil.

mailto:tariq.ellis@us.af.mil mailto:justin.moechnig@us.af.mil