Attachment 06 - Blank Pricing Worksheet.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Bldg 1947 Repair Drop Arms
Solicitation number
FA480326QE0030
Issued by

About this file

This is a blank pricing worksheet template for a federal construction project at Shaw Air Force Base. The worksheet is designed for contractors to submit pricing for solicitation FA480326QE0030, which concerns the repair and replacement of drop arms at Building 1947. The project is managed by the Department of the Air Force Air Combat Command at Shaw AFB in South Carolina.

The pricing template itemizes specific work components including demolition of the existing arm gate and foundation, excavation, concrete curb cutting and footing installation, supply and installation of a HySecurity M30 Drop Arm, installation of loop detectors and photobeams with controllers, control system configuration, one-year preventative maintenance, and labor for project management and superintendence. Contractors must enter unit costs, material costs, labor costs, and direct costs for each line item, with the worksheet automatically calculating totals, overhead, profit margin, and bond costs to arrive at the total contract price. The template includes fields for contractor information, purchase request number, and reference line numbers, and is designated for office use only by the government.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

`FOR OFFICE USE ONLY
Project:B1947 Drop ArmsVLSB -26-0053
Location:Building 1947, Shaw AFB, SC
Contractor:
Address:
PR No.:
ReferenceLine No.ItemUnit of MeasureQuantityMaterial Costs & Labor CostDirect CostLine Total
Unit Cost (Means)Total
1Demolish Arm Gate and Foundation$0.00
Excavation$0.00
Concrete Curb Cutting$0.00
Concrete Footing$0.00
HySecurity M30 Drop Arm$0.00
Install Loop Detector, Photobeams, Controllers$0.00
Control System Configuration$0.00
1-Year Preventative Maintenance$0.00
Project Manager$0.00
Project Superintendant$0.00
General Condtions$0.00

Totals: $0.00 $0.00 $0.00

Total Material&Labor Cost: $0.00

Direct Cost:$0.00
Total Line Item Cost:$0.00
Overhead:0%$0.00
Subtotal:$0.00
Profit:0%$0.00
Subtotal:
Bond:0.0%
Total Contract Price:

File details come from the government source that posted it. Updated .