Attachment 06 - Blank Pricing Worksheet.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Bldg 1947 Repair Drop Arms
- Solicitation number
- FA480326QE0030
About this file
This is a blank pricing worksheet template for a federal construction project at Shaw Air Force Base. The worksheet is designed for contractors to submit pricing for solicitation FA480326QE0030, which concerns the repair and replacement of drop arms at Building 1947. The project is managed by the Department of the Air Force Air Combat Command at Shaw AFB in South Carolina.
The pricing template itemizes specific work components including demolition of the existing arm gate and foundation, excavation, concrete curb cutting and footing installation, supply and installation of a HySecurity M30 Drop Arm, installation of loop detectors and photobeams with controllers, control system configuration, one-year preventative maintenance, and labor for project management and superintendence. Contractors must enter unit costs, material costs, labor costs, and direct costs for each line item, with the worksheet automatically calculating totals, overhead, profit margin, and bond costs to arrive at the total contract price. The template includes fields for contractor information, purchase request number, and reference line numbers, and is designated for office use only by the government.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ` | FOR OFFICE USE ONLY | ||
| Project: | B1947 Drop Arms | VLSB -26-0053 | |
| Location: | Building 1947, Shaw AFB, SC | ||
| Contractor: | |||
| Address: | |||
| PR No.: |
| Reference | Line No. | Item | Unit of Measure | Quantity | Material Costs & Labor Cost | Direct Cost | Line Total | |
| Unit Cost (Means) | Total |
| 1 | Demolish Arm Gate and Foundation | $0.00 |
| Excavation | $0.00 | |
| Concrete Curb Cutting | $0.00 | |
| Concrete Footing | $0.00 | |
| HySecurity M30 Drop Arm | $0.00 | |
| Install Loop Detector, Photobeams, Controllers | $0.00 | |
| Control System Configuration | $0.00 | |
| 1-Year Preventative Maintenance | $0.00 |
| Project Manager | $0.00 |
| Project Superintendant | $0.00 |
| General Condtions | $0.00 |
Totals: $0.00 $0.00 $0.00
Total Material&Labor Cost: $0.00
| Direct Cost: | $0.00 |
| Total Line Item Cost: | $0.00 |
| Overhead: | 0% | $0.00 |
| Subtotal: | $0.00 |
| Profit: | 0% | $0.00 |
| Subtotal: |
| Bond: | 0.0% |
| Total Contract Price: |