Combined Synopsis - FA480326QE0030_3 Sep 26.pdf
PDF 165 KB Posted
- Attached to
- Bldg 1947 Repair Drop Arms
- Solicitation number
- FA480326QE0030
About this file
This is a Combined Synopsis/Solicitation for construction repair services at Shaw Air Force Base, South Carolina. The solicitation (FA480326QE030) seeks qualified small business contractors to remove and install new drop arms at Building 1947. The project magnitude is estimated between $250,000 and $500,000 as a firm fixed-price contract. The proposal due date is September 21, 2026, at 10:00 AM EST, with a mandatory site visit scheduled for September 10, 2026, at 10:00 AM EDT. All interested small business contractors must submit the Base Access Request Form by September 8, 2026, at 12:00 PM EDT to attend the site visit.
The contractor is responsible for providing all plans, labor, materials, equipment, permits, transportation, and performing all operations necessary to complete the work in accordance with the Statement of Work. Work must commence within 10 calendar days of the Notice to Proceed, with a period of performance of 30 calendar days from receipt of NTP. The contract will remain open until one-year preventative maintenance is fulfilled. Performance and Payment Bonds are required within 10 calendar days of award in the amount of 100 percent of the award price. Wage Determination SC20260030 (dated May 18, 2026) for Sumter County, South Carolina, applies to this contract. Liquidated damages are assessed at $991.21 for the first day of delay and $313.77 for each subsequent calendar day until completion. Contractors must be registered in the System for Award Management (SAM) prior to award. Payment submissions must be made electronically through the Wide Area Workflow (WAWF) system. The solicitation is set aside for 100 percent Total Small Business concerns under NAICS code 238990 (Specialized Trade Contractors).
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combined Synopsis Solicitation
Repair Drop Arms Building 1947
Shaw AFB, SC
Proposal Due Date: 9/21/2026/10:00 A.M EST
Solicitation Number: FA480326QE030
Notice Type: Combined Synopsis/Solicitation
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
North American Industry Classification System (NAICS) Code: 238990
Product Service Code: Z2JZ
Set-Aside Status: 100% Total Small Business Set-Aside
MAGNITUDE OF CONSTRUCTION PROJECT: BETWEEN $250,000.00 - $500,000.00
CLIN 0001 Repair Drop Arms Bldg 1947 1 Job $ Total: $
Contractor is responsible for providing all plan, labor, material, equipment, permits, and transportation and performing all operations necessary to remove and install new drop arms at B1947, in strict accordance with contract documents, especially the Statement of Work.
Shaw AFB, SC
MAINT & REPAIR
Work shall commence within 10 calendar days of the issuance of the notice to proceed
Commencement can include evidence that (i) costs have been incurred or materials have been ordered specific to the performance of this contract, or (ii) a substantial physical step toward on-site repair has commenced.
Period of Performance (PoP) for this task order is 30 calendar days from receipt of Notice to Proceed. Please note the contract will remain open until the 1-year preventative maintenance is fulfilled.
Site Visit: A mandatory site visit will be held on 10 September 2026 at 10:00am EDT.
All Small Business Contractors are invited. Contractors interested in attending this site visit must fill and submit the Base Access Request Form (Attachment 08) via email by no later than 08 September 2026 at 12:00pm EDT directly to the CS, SrA Tariq Ellis at tariq.ellis@us.af.mil and courtesy copy the CO, SSgt Justin Moechnig at justin.moechnig@us.af.mil. Subcontractors are encouraged to attend. All questions generated during the site visit must be submitted in writing to the CO and CS NLT 11 September 2026 at 10:00am EDT. No other site visits will be conducted.
Performance and Payment Bonds are required IAW FAR 52.228-15. Performance and Payment bonds in the penal amount of percent of the award price, shall be submitted within 10 calendar days of award. The Government will not issue Notice to Proceed (NTP) until acceptance of bonds and applicable insurance, and acceptance of key personnel qualifications. The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price. The requirement for additional bonding for any modification issued under this project will be determined by the CO.
Wage Determinations: The most current Wage Determination for Sumter County SC is SC20260030 dated 18 May 2026 is applicable to this solicitation.
CLAUSES INCORPORATED BY REFERENCE
252.204-7006 Billing Instructions OCT 2005 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports DEC 2018
CLAUSES INCORPORATED BY FULL TEXT
RFO 52.211-12 – Liquidated Damages-Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $991.21 for the first day of delay and $313.77 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause
(End of clause)
252.232-7006 Wide Area Workflow Payment Instructions (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a)Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii)For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Invoice 2 in 1
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance-based payment request.
(v)For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 Issue By DoDAAC FA4803 Admin DoDAAC FA4803 Inspect By DoDAAC F3U3CE Ship To Code N/A Ship From Code N/A Mark For Code N/A Service Approver (DoDAAC) FA4803 Service Acceptor (DoDAAC) FA4803 Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(4) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the Contracting Officer.
justin.moechnig@us.af.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
ACC Ombudsman
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerers, potential offerers, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of 0MB Circular A-76 competition performance decisions)
(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Deputy Director of Contracting, AFICC/KC (OL- ACC), 114 Thompson Street, Bldg 586, Room 129, Langley AFB, VA 23665, telephone (757) 764-5372 (DSN 574-5372) email: acc.a7k1@us.af.mil.
Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the contracting officer.
Contractor Access to Department of the Air Force Installations
The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Department of the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate, and a second valid form of identification/REAL ID to obtain a vehicle pass.
During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with DAFI 31-101, Integrated Defense, and DODMAN5200.02_DAFMAN 16-1405 , Air Force Personnel Security Program.
Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
The contractor shall provide an after-hours contact number or after-hours email in the Emergency Mass Notification System (EMNS) for each of their personnel, whose normal place of duty is on a DoD installation or within a DoD facility. The contractor shall comply with any additional requirements in DAFMAN 10-206 for emergency operational reporting. Foreign Nationals may participate and may remove themselves from the Emergency Mass Notification System at any time.
To update information, personnel can access the globe icon on their system desktop screens and choose the “Access Self Service” option.
Section I - Contract Clauses
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-11 Certification And Disclosure Regarding Payments To SEP 2024 Influence Certain Federal Transactions 52.203-12 Limitation On Payments To Influence Certain Federal JUN 2020 Transactions 52.203-17 Contractor Employee Whistleblower Rights and Requirement NOV 2023 To Inform Employees of Whistleblower Rights 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier (Deviation Date) Subcontract Awards
52.204-13 System for Award Management Maintenance (Deviation Date) 52.204-19 Incorporation by Reference of Representations and DEC 2014 Certifications.
52.209-6 Protecting the Government's Interest When Subcontracting (Deviation Date) With Contractors Debarred, Suspended, or Proposed for Debarment 52.209-10 Prohibition on Contracting With Inverted Domestic (Deviation Date) Corporations 52.211-13 Time Extensions SEP 2000 52.219-8 Utilization of Small Business Concerns OCT 2018 52.219-28 Post-Award Small Business Program Representation MAY 2020 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards – Overtime (Deviation Date) Compensation 52.222-6 Construction Wage Rate Requirements (Deviation Date) 52.222-7 Withholding of Funds (Deviation Date) 52.222-8 Payrolls and Basic Records (Deviation Date) 52.222-9 Apprentices and Trainees (Deviation Date) 52.222-10 Compliance with Copeland Act Requirements (Deviation Date) 52.222-11 Subcontracts (Labor Standards) (Deviation Date) 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations MAY 2014 52.222-14 Disputes Concerning Labor Standards (Deviation Date) 52.222-15 Certification of Eligibility MAY 2014 52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-50 Combating Trafficking in Persons JAN 2019 52.222-54 Employment Eligibility Verification OCT 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons. (Deviation Date) 52.225-11 Buy American--Construction Materials Under Trade (Deviation Date) Agreements 52.227-1 Authorization and Consent JUN 2020 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets FEB 2021 52.228-12 Prospective Subcontractor Requests for Bonds DEC 2022 52.228-13 Alternative Payment Protections JUL 2000 52.228-15 Performance and Payment Bonds--Construction JUN 2020 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014
52.232-16 (Dev) Progress Payments JUN 2020 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award OCT 2018 Management 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business MAR 2023 Subcontractors 52.233-1 Disputes MAY 201 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions (Deviation Date) 52.236-3 Site Investigation and Conditions Affecting the Work (Deviation Date) 52.236-5 Material and Workmanship (Deviation Date) 52.236-6 Superintendence by the Contractor (Deviation Date) 52.236-7 Permits and Responsibilities (Deviation Date) 52.236-8 Other Contracts (Deviation Date) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Deviation Date) 52.236-10 Operations and Storage Areas (Deviation Date) 52.236-11 Use and Possession Prior to Completion (Deviation Date) 52.236-12 Cleaning Up (Deviation Date) 52.236-13 Accident Prevention (Deviation Date) 52.236-14 Availability and Use of Utility Services (Deviation Date) 52.236-15 Schedules for Construction Contracts (Deviation Date) 52.236-17 Layout of Work (Deviation Date) 52.236-21 Specifications and Drawings for Construction (Deviation Date) 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes (Deviation Date) 52.244-6 Subcontracts for Commercial Items (Deviation Date) 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2025 52.249-1 Alt I Termination for Convenience of the Government (Fixedprice) (Short Form) (Apr 1984) - Alternate I APR 1984 52.249-10 Default (Fixed-Price Construction) APR 1984 52.249-14 Excusable Delays APR 1984 252.203-7000 Requirements Relating to Compensation of Former DoD Officials SEP 2011 252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies JAN 2023 252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.219-7011 Notification to Delay Performance JUN 1998 252.227-7033 Rights in Shop Drawings APR 1966
252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2022
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (Deviation Date) The Government contemplates award of a Firm Fixed Price (FFP) contract resulting from this solicitation.
(End of provision)
52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (Deviation Date)
(a) Definitions. As used in this clause-- Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and (iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4) such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if--
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)).
The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: (3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute. (d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) \1\ Item 1 Foreign construction material.... ........... ___ ........ ....... ………. ___ ................ ........ ___ Domestic construction material... ........ ___ ............... .............. ___ .................. ...... ___ Item 2 Foreign construction material.... ......... ___ ............. ........ ……. ___ ............... ......... ___ Domestic construction material... ....... ___ .................. ............. ___ ................. ....... ___ Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include other applicable supporting information.
(End of clause)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far (End of clause)
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any Defense Acquisition Regulation System (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements. (d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work.
The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
Section J - List of Documents, Exhibits and Other Attachments
Attachment 01 – Statement of Work – 3 Apr 26 Attachment 02 – Drop Arm Locations and Images Attachment 03 – HySecurity Arm Attachment 04 – DD Form 1354 Attachment 05 – Schedule of Material Submittals Attachment 06 – Blank Pricing Worksheet Attachment 07 – DBA WD SC20260036 Attachment 08 – Base Access Request Form
Section K - Representations, Certifications and Other Statements of Offerors
52.209-7 Information Regarding Responsibility Matters Deviation Date
52.225-10 Notice of Buy American Requirement--Construction Materials
MAY 2014
52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements
MAY 2014
(End of provision)
Section L - Instructions, Conditions and Notices to Bidders
52.204-7 System for Award Management OCT 2018
52.233-2 SERVICE OF PROTEST (Deviation Date)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from them.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://acquistion.gov/
(End of provision)
INSTRUCTIONS TO OFFERORS:
Submission: Quotes must be submitted electronically to the Contracting Officer and Contract Specialist via email no later than Monday, 21 September 2026, 10:00 AM
EST.
1. Submit signed and dated quote, other than cost and pricing data (price breakdown that includes labor and materials price matrix excel spreadsheet) detailing the direct labor, fringe, overhead, G&A, and profit rates used to develop the labor matrix that identifies all labor categories, including Occupational Code/Title, and technical narrative, and Quality Control Plan (QCP) to the email specified below at or before the specified time in this solicitation. Only emailed quotations will be accepted.
Email to SSgt Justin Moechnig, Contracting Officer, justin.d.moechnig@us.af.mil and the Contract Specialist, Tariq Ellis at tariq.ellis@us.af.mil.
2. Attached files must be Microsoft compatible and virus/malware free. Electronic media suspected by Government computers as possibly containing virus/malware will not be opened or considered. Facsimile will not be accepted.
If Government responses to technical questions affect the Statement of Work (SOW) requirements, an amendment to solicitation will be issued.
3. Contractor must be registered in the System for Award Management (SAM) with all required information prior to award.
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 252) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of provision)
252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND
CERTIFICATIONS (OCT 2025)
Substitute the following paragraphs (b), (d) and (e) for paragraphs (b) and (d) of the provision at FAR 52.204-8:
(b)(1) If the provision at FAR 52.204-7, System for Award Management, is included in this solicitation, or paragraph
(e) of this provision applies.
(2) If the provision at FAR 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (e) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
__ (i) Paragraph (e) applies.
__ (ii) Paragraph (e) does not apply, and the Offeror has completed the individual representations and certifications in the solicitation.
(d)(1) The following representations or certifications in the SAM database are applicable to this solicitation as indicated:
(i) 252.204-7016, Covered Defense Telecommunications Equipment or Services- Representation. Applies to all solicitations.
(ii) 252.209-7003, Reserve Officer Training Corps and Military Recruiting on Campus-- Representation. Applies to all solicitations with institutions of higher education.
(iii) 252.216-7008, Economic Price Adjustment--Wage Rates or Material Prices Controlled by a Foreign Government. Applies to solicitations for fixed-price supply and service contracts when the contract is to be performed wholly or in part in a foreign country, and a foreign government controls wage rates or material prices and may during contract performance impose a mandatory change in wages or prices of materials.
(iv) 252.225-7042, Authorization to Perform. Applies to all solicitations when performance will be wholly or in part in a foreign country.
(v) 252.225-7049, Prohibition on Acquisition of Certain Foreign Commercial Satellite Services-Representations. Applies to solicitations for the acquisition of commercial satellite services.
(vi) 252.225-7050, Disclosure of Ownership or Control by the Government of a Country that is a State Sponsor of Terrorism. This applies to all solicitations expected to result in contracts of $150,000 or more
(vii) 252.229-7012, Tax Exemptions (Italy)--Representation. Applies to solicitations when contract performance will be in Italy.
(viii) 252.229-7013, Tax Exemptions (Spain)--Representation. Applies to solicitations when contract performance will be in Spain.
(ix) 252.247-7022, Representation of Extent of Transportation by Sea. Applies to all solicitations except those for direct purchase of ocean transportation services or those with an anticipated value at or below the simplified acquisition threshold.
(2) The following representations or certifications in SAM are applicable to this solicitation as indicated by the Contracting Officer: [Contracting Officer check as appropriate.] ____ (i) 252.209-7002, Disclosure of Ownership or Control by a Foreign Government.
____ (ii) 252.225-7000, Buy American--Balance of Payments Program Certificate.
____ (iii) 252.225-7020, Trade Agreements Certificate.
____ Use with Alternate I.
____ (iv) 252.225-7031, Secondary Arab Boycott of Israel.
____ (v) 252.225-7035, Buy American--Free Trade Agreements--Balance of Payments Program Certificate.
____ Use with Alternate I.
____ Use with Alternate II.
____ Use with Alternate III.
____ Use with Alternate IV.
____ Use with Alternate V.
____ (vi) 252.226-7002, Representation for Demonstration Project for Contractors Employing Persons with Disabilities.
____ (vii) 252.232-7015, Performance-Based Payments-Representation.
(e) The offeror has completed the annual representations and certifications electronically via the SAM Web site at https://www.acquisition.gov/. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in FAR 52.204-8(c) and paragraph (d) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer, and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below ____ [offeror to insert changes, identifying change by provision number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR/DFARS Clause # Title Date Change Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications located in the SAM database.
Section M - Evaluation Factors for Award
BASIS FOR AWARD
52.212-2 EVALUATION--COMMERCIAL ITEMS (NOV 2021)
(a) The Government will award a contract resulting from this solicitation to the responsible submitter whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered.
Factor 1: The government will evaluate Drop Arms specifications to confirm brand name or equal capability.
Factor 2: The government will evaluate price to determine lowest price technically acceptable.
Evaluation Process: The Government will assess the quotes received and identify the lowest quote that provides the most advantageous solution. The Government reserves the right to select a quote that provides higher technical confidence over a lower-priced quote. The Government intends to evaluate quotes and award an order without communications or interchanges but reserves the right to contact offerors if it is in the Government's best interest.
File details come from the government source that posted it. Updated .