This is a Schedule of Material Submittals template for a construction project at Shaw Air Force Base involving the repair of Building 1947 drop arms and replacement of command gates under Solicitation No. FA480326QE0030. The document outlines the submission requirements and timeline for various construction-related materials and documentation that contractors must provide to the Project Engineer and Contract Administrator throughout the project lifecycle.

The schedule identifies seven specific submittal requirements with corresponding deadlines and approval workflows. Key submissions include: a construction schedule due within one week after Notice to Proceed (NTP); work permits required after NTP and two weeks prior to starting work; Operation and Maintenance manuals, Drop Arm Equipment specifications, and foundation drawings all due after NTP with varying advance notice requirements; and a concrete mix cut sheet specifying PSI ratings. Each line item includes columns for tracking certification of compliance, shop drawings, samples, color selections, manufacturer recommendations, warranties, and catalog data as applicable. The document establishes a process for submission dates, receipt dates, civil engineering review dates, return suspense dates, and final approval or disapproval notation, with provisions for contractor resubmittals as needed. This template ensures systematic documentation and approval of all materials prior to installation or commencement of work activities related to the drop arm repair project.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NCOC-A

PROJECT NUMBER :PROJECT TITLE:SOLICITATION/CONTRACT NO.:
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSOTHERREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1Construction Schedulex1 Week after NTPWithin 1 week of NTP
2Work PermitxAfter the NTP and Two Weeks Prior to starting work
3O&M ManualsxxxWith the Drop Arm submittal
4Drop Arm Equipment SubmittalxxxxxAfter the NTP and Prior to starting work
5Concrete Mix cut sheetxPSI rating of the concrete
6Foundation DrawingsxAfter the NTP and Two Weeks Prior to starting work
7
8
9
10
11
12
13
14
15
16
17
18
19

Solicitation No. F38604-99-1480 Attachment 6

AF FORM 66

(Computer Generated) PAGE &P of &N

File details come from the government source that posted it. Updated .