Version 2 -Questions and Answers.pdf
PDF 96 KB Posted
- Solicitation number
- FA480324R0040
About this file
This is a Questions and Answers document for solicitation FA480324R0040, which covers demolition and abatement work at Shaw AFB. The Q&A addresses five key items: 1) Confirmation that all CLINs must have pricing for proposal evaluation, 2) Contractor responsibility for obtaining and paying for hazardous material surveys, 3) Clarification that two outdoor structures (B1102 Picnic Shelter and B212 Pavilion) do not require hazardous material surveys, 4) Notice that missing as-built drawings for buildings B202 and B115 will be added to SAM.gov, and 5) Clarification regarding B1724 work tasks.
For B1724, the document specifies two components: the Mobile Storage Building is to be removed as directed in the SOW, while the Compressor Cover structure has already been removed and only requires cutting anchor bolts flush with the concrete slab. The document references a revised Statement of Work and sketch for additional details.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
FA480324R0040 – Demolition and Abatement
1. Will we need to add pricing to the asbestos CLIN structure? Yes, we need ALL the CLINS to have a price next to it. If one of these line items has no price, then we will not be able to evaluate your proposal. Please make sure that every line item has a price next to it.
2. Please confirm the contractor is responsible for obtaining and paying for updated hazardous material (i.e. ACM, ORM, Lead) surveys? Yes, except as noted in question #3 below
3. Please confirm which buildings will require and will not require a hazardous material survey? The two outdoor picnic shelters will not require surveys: B1102 Picnic Shelter and B212 Pavilion.
4. No as-built drawings, sketch's, or maps are provided for buildings B202 Locomotive Barn and B115 Maintenance Hangar. Please confirm whether this information will be available prior to the proposal due date?
B202 and B115 map was deleted on accident but will be added on SAM.gov.
5. The structure for the Compressor Cover near B1724 appears to have already been removed. What work is required?
There are two parts to the B1724 work task:
a. B1724 Mobile Storage Building – no change. Remove the Mobile Storage Building as directed in the SOW.
b. Compressor Cover – The compressor cover structure has already been removed. Cut the anchor bolts flush with the concrete slab.
See the revised Statement of Work and revised sketch for details.