Solicitation Amendment FA480324R00400002 SF 30.pdf

PDF 603 KB Posted

Attached to
Shaw AFB Multi Building Demolition and Abatement - Solicitation
Solicitation number
FA480324R0040
Issued by

About this file

This document is a solicitation amendment for a federal contract opportunity. The amendment extends the period of performance for the demolition and asbestos abatement of multiple buildings at Shaw AFB from 154 days to 210 days, with a revised period of performance from September 16, 2024 to April 14, 2025. The contract requires the demolition of 6 buildings (B1413 Base Theater, B1047 Aerospace Physiology, B115 Maintenance Hangar, B5004 Palmetto Heights Gate House, B202 Locomotive Barn, and B1102 Picnic Shelter) and the abatement of asbestos in those buildings, per the Statement of Work. The amendment also provides revised attachments including the Statement of Work, wage determinations, as-builts, asbestos surveys, and questions and answers. The contract will be awarded to the responsible offeror whose proposal conforms to the solicitation and is most advantageous to the government, with technical capability and past performance being more important than price.

View the file

Other files

File Type Posted
Version 2 - Site Visit sign in - Project Multi-Building Demo.pdf PDF
B202 2024-08-26.pdf PDF
Solicitation Amendment - FA480324R00400006.pdf PDF
B1724 2024-12-11.pdf PDF
B115 2024-08-26.pdf PDF
Base Map.pdf PDF
Version 2 -Questions and Answers.pdf PDF
01 SOW VLSB 23-0010 Demo Theater and Others 2024-12-11.pdf PDF
Version 1 - Questions and Answers - 26 Aug 24.pdf PDF
Solicitation Amendment FA480324R00400006 SF 30.pdf PDF
Version 1 - Site Visit - 7 Aug 24.pdf PDF
B1413 Theater Multiple Asbuilts.pdf PDF
B396 Asbuilts.pdf PDF
B1724.pdf PDF
B1047 Asbuilts addition 94.pdf PDF
B5237 Slab and Sign.pdf PDF
Wage determination Rev 23.pdf PDF
Solicitation Amendment - FA480324R00400005.pdf PDF
Version 1 - Questions and Answers - 26 Aug 24.docx DOCX document
B1908HWST.pdf PDF
B1047 Asbuilts addition 71.pdf PDF
01 SOW VLSB 23-0010 Demo Theater and Others 2024-11-05.pdf PDF
Solicitation Amendment FA480324R00400005 SF 30.pdf PDF
B212 Pavilion.pdf PDF
Solicitation Amendment FA480324R00400004 SF 30.pdf PDF
Solicitation Amendment - FA480324R00400004.pdf PDF
Solicitation Amendment FA480324R00400003 SF 30.pdf PDF
Solicitation Amendment - FA480324R00400003.pdf PDF
Building 202.pdf PDF
_Building 115 AsBuilts.pdf PDF
01 SOW 2024-08-26.docx DOCX document
B1047 2024-08-26.pdf PDF
Questions and Answers CE.docx DOCX document
Site visit sign in sheet.pdf PDF
B1413 2024-08-26.pdf PDF
Solicitation Amendment - FA480324R00400002.pdf PDF
Shaw AFB Contractor Request Template (2024) (WORK PURPOSES).docx DOCX document
Site visit SIGNED.pdf PDF
Solicitation Amendment FA480324R00400001 SF 30.pdf PDF
B1047 AsBuilts 1of3.pdf PDF
Building 202.pdf PDF
B1102 2024-07-01.pdf PDF
Wage Determination.pdf PDF
Solicitation - FA480324R0040.pdf PDF
B5004 2024-07-12.pdf PDF
Asbestos Survey 01047.pdf PDF
B1047 Asbuilts addition 3of3.pdf PDF
Asbestos Survey - BLDG 1413 1991 R.pdf PDF
Building 5004.pdf PDF
01 SOW VLSB 23-0010 Demo Theater and Others 2024-08-01.docx DOCX document
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO CHANGED

BY

Description

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the demolition of Building 1413 Base Theater IAW Statement of Work.

Period of Performance: 154 Days ADC

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the demolition of Building 1413 Base Theater IAW Statement of Work.

Period of Performance: 210 Days ADC

INFORMATION FROM TO CHANGED

BY

Description

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the demolition of Building 1047 Aerospace Physiology IAW Statement of Work.

Period of Performance: 154 Days ADC

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the demolition of Building 1047 Aerospace Physiology IAW Statement of Work.

Period of Performance: 210Days ADC

INFORMATION FROM TO CHANGED

BY

Description

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the demolition of Building 115 Maintenance Hangar IAW Statement of Work.

Period of Performance: 154 Days ADC

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the demolition of Building 115 Maintenance Hangar IAW Statement of Work.

Period of Performance: 210 Days ADC

INFORMATION FROM TO CHANGED

BY

Description

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the demolition of Building 5004 Palmetto Heights Gate House IAW Statement of Work.

Period of Performance: 154 Days ADC

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the demolition of Building 5004 Palmetto Heights Gate House IAW Statement of Work.

Period of Performance: 210 Days ADC

INFORMATION FROM TO CHANGED

BY

Description

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the demolition of Building 202 Locomotive Barn IAW Statement of Work.

Period of Performance: 154 Days ADC

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the demolition of Building 202 Locomotive Barn IAW Statement of Work.

Period of Performance: 210 Days ADC

FA480324R00400002

INFORMATION FROM TO CHANGED

BY

Description

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the demolition of Building 1102 Picnic Shelter IAW Statement of Work.

Period of Performance: 154 Days ADC

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the demolition of Building 1102 Picnic Shelter IAW Statement of Work.

Period of Performance: 210 Days ADC

INFORMATION FROM TO CHANGED

BY

Description

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the asbestos abatement of Building 1413 Base Theater IAW Statement of Work.

SQUARE FOOTAGE MATERIAL

Period of Performance: 154 Days ADC

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the asbestos abatement of Building 1413 Base Theater IAW Statement of Work.

SQUARE FOOTAGE MATERIAL

Period of Performance: 210 Days ADC

INFORMATION FROM TO CHANGED

BY

Description

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the asbestos abatement of Building 1413 Base Theater IAW Statement of Work.

LINEAR FOOTAGE MATERIAL

Period of Performance: 154 Days ADC

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the asbestos abatement of Building 1413 Base Theater IAW Statement of Work.

LINEAR FOOTAGE MATERIAL

Period of Performance: 210 Days ADC

INFORMATION FROM TO CHANGED

BY

Description

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the asbestos abatement of Building 1413 Base Theater IAW Statement of Work.

FIRE DOORS

Period of Performance: 154 Days ADC

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the asbestos abatement of Building 1413 Base Theater IAW Statement of Work.

FIRE DOORS

Period of Performance: 210 Days ADC

INFORMATION FROM TO CHANGED

BY

Description

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the asbestos abatement of Building 1047 Aerospace Physiology IAW Statement of Work.

SQUARE FOOTAGE MATERIAL

Period of Performance: 154 Days ADC

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the asbestos abatement of Building 1047 Aerospace Physiology IAW Statement of Work.

SQUARE FOOTAGE MATERIAL

Period of Performance: 210 Days ADC

INFORMATION FROM TO CHANGED

BY

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items

Description and non-personal services necessary for the asbestos abatement of Building 1047 Aerospace Physiology IAW Statement of Work.

LINEAR FOOTAGE MATERIAL

Period of Performance: 154 Days ADC and non-personal services necessary for the asbestos abatement of Building 1047 Aerospace Physiology IAW Statement of Work.

LINEAR FOOTAGE MATERIAL

Period of Performance: 210 Days ADC

INFORMATION FROM TO CHANGED

BY

Description

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the asbestos abatement of Building 115 Maintenance Hangar IAW Statement of Work.

SQUARE FOOTAGE MATERIAL

Period of Performance: 154 Days ADC

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the asbestos abatement of Building 115 Maintenance Hangar IAW Statement of Work.

SQUARE FOOTAGE MATERIAL

Period of Performance: 210 Days ADC

INFORMATION FROM TO CHANGED

BY

Description

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the asbestos abatement of Building 115 Hangar Maintenance IAW Statement of Work.

LINEAR FOOTAGE MATERIAL

Period of Performance: 154 Days ADC

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the asbestos abatement of Building 115 Hangar Maintenance IAW Statement of Work.

LINEAR FOOTAGE MATERIAL

Period of Performance: 210 Days ADC

INFORMATION FROM TO CHANGED

BY

Description

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the asbestos abatement survey of all buildings except the 1102 picnic area IAW Statement of Work.

ASBESTOS SURVEYS FOR EACH

BUILDING EXCEPT THE 1102 PICNIC

AREA

Period of Performance: 154 Days ADC

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the asbestos abatement survey of all buildings except the 1102 picnic area IAW Statement of Work.

ASBESTOS SURVEYS FOR EACH

BUILDING EXCEPT THE 1102 PICNIC

AREA

Period of Performance: 210 Days ADC

Deliveries or Performance

The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Period of Performance 02 Sep 2024 to 03 Feb 2025 16 Sep 2024 to 14 Apr 2025

Place of Performance - DoDAAC: F3U3CE

INFORMATION FROM TO

Delivery 154 Calendar Days, From Date of Award to completion of performance

210 Calendar Days, From Date of Award to completion of performance

INFORMATION FROM TO

Period of Performance 02 Sep 2024 to 03 Feb 2025 16 Sep 2024 to 14 Apr 2025

Place of Performance - DoDAAC: F3U3CE

INFORMATION FROM TO

Delivery 154 Calendar Days, From Date of Award to completion of performance

210 Calendar Days, From Date of Award to completion of performance

INFORMATION FROM TO

Period of Performance 02 Sep 2024 to 03 Feb 2025 16 Sep 2024 to 14 Apr 2025

Place of Performance - DoDAAC: F3U3CE

INFORMATION FROM TO

Delivery 154 Calendar Days, From Date of Award to completion of performance

210 Calendar Days, From Date of Award to completion of performance

INFORMATION FROM TO

Period of Performance 02 Sep 2024 to 03 Feb 2025 16 Sep 2024 to 14 Apr 2025

Place of Performance - DoDAAC: F3U3CE

INFORMATION FROM TO

Delivery 154 Calendar Days, From Date of Award to completion of performance

210 Calendar Days, From Date of Award to completion of performance

INFORMATION FROM TO

Period of Performance 02 Sep 2024 to 03 Feb 2025 16 Sep 2024 to 14 Apr 2025

Place of Performance - DoDAAC: F3U3CE

INFORMATION FROM TO

Delivery 154 Calendar Days, From Date of Award to completion of performance

210 Calendar Days, From Date of Award to completion of performance

INFORMATION FROM TO

Period of Performance 02 Sep 2024 to 03 Feb 2025 16 Sep 2024 to 14 Apr 2025

Place of Performance - DoDAAC: F3U3CE

INFORMATION FROM TO

Delivery 154 Calendar Days, From Date of Award to completion of performance

210 Calendar Days, From Date of Award to completion of performance

INFORMATION FROM TO

Period of Performance 02 Sep 2024 to 03 Feb 2025 16 Sep 2024 to 14 Apr 2025

Place of Performance - DoDAAC: F3U3CE

INFORMATION FROM TO

Delivery 154 Calendar Days, From Date of Award to completion of performance

210 Calendar Days, From Date of Award to completion of performance

INFORMATION FROM TO

Period of Performance 02 Sep 2024 to 03 Feb 2025 16 Sep 2024 to 14 Apr 2025

Place of Performance - DoDAAC: F3U3CE

INFORMATION FROM TO

Delivery 154 Calendar Days, From Date of Award to completion of performance

210 Calendar Days, From Date of Award to completion of performance

INFORMATION FROM TO

Period of Performance 02 Sep 2024 to 03 Feb 2025 16 Sep 2024 to 14 Apr 2025

Place of Performance - DoDAAC: F3U3CE

INFORMATION FROM TO

Delivery 154 Calendar Days, From Date of Award to completion of performance

210 Calendar Days, From Date of Award to completion of performance

INFORMATION FROM TO

Period of Performance 02 Sep 2024 to 03 Feb 2025 16 Sep 2024 to 14 Apr 2025

Place of Performance - DoDAAC: F3U3CE

INFORMATION FROM TO

Delivery 154 Calendar Days, From Date of Award to completion of performance

210 Calendar Days, From Date of Award to completion of performance

INFORMATION FROM TO

Period of Performance 02 Sep 2024 to 03 Feb 2025 16 Sep 2024 to 14 Apr 2025

Place of Performance - DoDAAC: F3U3CE

INFORMATION FROM TO

Delivery 154 Calendar Days, From Date of Award to completion of performance

210 Calendar Days, From Date of Award to completion of performance

INFORMATION FROM TO

Period of Performance 02 Sep 2024 to 03 Feb 2025 16 Sep 2024 to 14 Apr 2025

Place of Performance - DoDAAC: F3U3CE

INFORMATION FROM TO

Delivery 154 Calendar Days, From Date of Award to completion of performance

210 Calendar Days, From Date of Award to completion of performance

INFORMATION FROM TO

Period of Performance 02 Sep 2024 to 03 Feb 2025 16 Sep 2024 to 14 Apr 2025

Place of Performance - DoDAAC: F3U3CE

INFORMATION FROM TO

Delivery 154 Calendar Days, From Date of Award to completion of performance

210 Calendar Days, From Date of Award to completion of performance

INFORMATION FROM TO

Period of Performance 02 Sep 2024 to 03 Feb 2025 16 Sep 2024 to 14 Apr 2025

Place of Performance - DoDAAC: F3U3CE

INFORMATION FROM TO

Delivery 154 Calendar Days, From Date of Award to completion of performance

210 Calendar Days, From Date of Award to completion of performance

List of Attachments

The following attachments were added:

01 SOW 2024-08-26

B1047 2024-08-26 B115 2024-08-26 B1413 2024-08-26 B202 2024-08-26 B5004 2024-07-12 Questions & Answers CE response

The following attachments were deleted:

01 SOW VLSB 23-0010 Demo Theater and Others 2024-08-01 B1047 2024-07-01 B1047 AsBuilts 1of3 B1047 Asbuilts 2of3 B1047 Asbuilts addition 3of3 B1413 2024-07-12 Building 202 Building 5004 _Building 115 AsBuilts

Miscellaneous text in this section has been modified to:

1. Statement of Work (26 Aug 24)

2. Wage Determinations

3. As-builts (FOR BUILDING LAYOUT ONLY)

4. Asbestos Survey

5. Q&A

Evaluation Factors for Award

Miscellaneous text in this section has been modified to:

52.212-2 FAR Provision Evaluation-- and (Nov 2021)Commercial Products Commercial Services

(a) The Government will award a contract resulting from this to the responsible whose conforming to the will be solicitation offeror offer solicitation most advantageous to the Government, price and other factors considered. The following factors be used to evaluate : shall offers

(i) technical capability;

(ii) price;

(iii) past performance (CPARS).

Technical and , when combined, are past performance considered to be more important when compared to price.

(b) Options. The Government will evaluate for award (Contractors please note: Options are not applicable for this acquisition) offers purposes by adding the total price for all to the total price for the basic requirement. The Government determine that an is options may offer unacceptable if the prices are significantly unbalanced. Evaluation of not obligate the Government to exercise the (s). option options shall option

(c) A written notice of award or acceptance of an , mailed or otherwise furnished to the successful within the time for acceptance offer offeror specified in the , result in a binding contract without further action by either party. Before the 's specified expiration time, the offer shall offer Government accept an (or part of an ), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is may offer offer received before award.

(End of provision)

(52.212-2 ADDENDUM) Evaluation Process:

Step 1: Evaluate all proposals for responsiveness.

Step 2: Sort all timely proposals from lowest to highest based upon offeror's Total Evaluated Price (TEP).

Step 3: Evaluate all proposals based on CPARS.

Step 4: The technical capability of each offeror will be evaluated based on the submittal of a technical narrative, and offeror's ability to meet technical requirements within the specified timeline. Each offeror's technical narrative ( ) no more than 10 pages will receive a rating ( ) based on the submission of a written, technical proposal describing the offeror's acceptable/unacceptable approach to meeting the technical requirements of the demolition and site services IAW SOW dated 26 August 2024, for the following facilities:

B1413 Base Theater

B1047 Aerospace Physiology

B115 Maintenance Hangar

B5004 Palmetto Heights Gate House

B202 Locomotive Barn

B1102 Picnic Shelter

The narrative must include assumptions, risks, and constraints. The narrative must also provide sufficient information to adequately support a submittal of a Gantt Chart, including market conditions (i.e. supply chain delays, labor shortages, if applicable). The chart will not count towards the narrative maximum and must outline all major work elements showing 10-page a logical sequence of events, complete services IAW the SOW and be realistic to the offeror's TEP. Narratives that include executive summaries, and/or vague or general statements about company capabilities will receive a rating of unacceptable.

Step 5: The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government.

IDCode: J
Page: 1
Pages: 9
AmendNo: 0002
EffDate: 26 Aug 2024
ReqNo:
ProjNo:
IssCode: FA4803
AdmCode:
IssuedBy: FA4803 20 CONS LGCA

321 CULLEN ST BLDG 216, CP 803 895 5403

SHAW AFB, SC 29152-5125

UNITED STATES

Jeesenia Nauta Criollo, Email: jeesenia.nauta_criollo@us.af.mil Telephone: 965-5623 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA480324R0040
SolDate: 07 Aug 2024
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is to:

1. Address questions that have been made regarding this requirement.

2. Upload drawings, Statement of Work and Q&A that have been revised and dated 26 August 2024.

3. The period of performance has been extended from 154 calendar days to 210 calendar days. Period of performance will start 16 September 2024 and end 14 April 2025.

Note: All other terms and conditions remain unchanged.

ContNameTitle:
CoNameTitle: Cesar Tapia-Caballero, CO, USAF
ContDate:
CODate: 26 Aug 2024

File details come from the government source that posted it. Updated .