DRAFT_Atch_3_Submittal_Schedule_-20_Aug_15.pdf
PDF 21 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA469019RA003
About this file
This document provides the schedule of material submittals for a construction contract at Ellsworth Air Force Base in South Dakota. The schedule requires the contractor to submit items such as manufacturer warranties, catalog data, samples, color selections, shop drawings, test reports and certifications of compliance by specified dates for approval by the civil engineering and contracting offices. It includes the submittal number, description of item with contract reference, number of copies required, submission date, remarks and approval signature fields.
A related federal contract opportunity involves multiple award construction contracts with an estimated total value of $18 million to provide construction, renovation, alteration and repair services at Ellsworth Air Force Base. Services will include trades such as carpentry, roofing, electrical and plumbing. The solicitation targets awards to three service disabled veteran owned small businesses, SBA 8(a) small disadvantaged businesses or HUBZone businesses. The contract period is from date of award to June 2021, with a minimum value of $500 per contract. The solicitation will be issued through beta.SAM.gov and proposals are due in November 2018.
DRAFT Atch 3 Submittal Schedule
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPROVED DISAPPROVED
Attachment 3
S C
H E
D U
LE
S
, L
IS
TI
N
G S
, R E
P O
R
TS
, P
LA
N S
M A
N U
FA
C
TU
R
E R
'S R
E C
O M
M E
N D
A
TI
O N
D A
TE
R
E C
E
IV
E D
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O C
IV
IL
E N
G
IN
E E
R
IN
G
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
M A
N U
FA
C
TU
R
E R
'S W
A R
R A
N
TY
C A
TA
LO
G D
A
TA
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
TE
LI
N
E N
U M
B E
R
S A
M P
LE
S
C O
LO
R
S E
LE
C
TI
O
N
ACES Project Title
DATE CONTRACTOR
NOTIFIED
(To be completed by Contract Administrator)
Contract Number:
S U
B M
IT
TA
L N
U M
B E
R S
C O
N
TR
A C
TO
R
R E
S U
B M
IT
TA
L
FI
N
A L
A P
P R
O V
A L
REMARKS
R E
TU
R
N S
U S
P E
N S
E D
A
TE
FI
E
LD
R
E P
O R
TS
O P
E R
A
TI
N G
IN
S
TR
U
C
TI
O N
S
TE
C
H N
IC
A
L D
A
TA
TE
S
T R
E P
O R
TS
Schedule of Material Submittals - 20 Aug 15
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E
S H
O P
D R
A W
IN
G
S
Material Submittals Schedule