This document provides the schedule of material submittals for a construction contract at Ellsworth Air Force Base in South Dakota. The schedule requires the contractor to submit items such as manufacturer warranties, catalog data, samples, color selections, shop drawings, test reports and certifications of compliance by specified dates for approval by the civil engineering and contracting offices. It includes the submittal number, description of item with contract reference, number of copies required, submission date, remarks and approval signature fields.

A related federal contract opportunity involves multiple award construction contracts with an estimated total value of $18 million to provide construction, renovation, alteration and repair services at Ellsworth Air Force Base. Services will include trades such as carpentry, roofing, electrical and plumbing. The solicitation targets awards to three service disabled veteran owned small businesses, SBA 8(a) small disadvantaged businesses or HUBZone businesses. The contract period is from date of award to June 2021, with a minimum value of $500 per contract. The solicitation will be issued through beta.SAM.gov and proposals are due in November 2018.

DRAFT Atch 3 Submittal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Solicitation_Amendment_FA469019RA0030013_SF_30.pdf PDF
Atch_31_Follow_on_Q&As_26APR19.pdf PDF
Solicitation_Amendment_FA469019RA0030012_SF_30.pdf PDF
Atch_20f_Bid_Schedule-25_Apr_19.doc DOC document
Atch_30_Follow_on_Q&A_25APR19.pdf PDF
Atch_20b_SOW_Updated_23APR19.pdf PDF
Attach_27_a_Site_Vist_QAs_as_of_6_Mar_19.pdf PDF
Solicitation_Amendment_FA469019RA0030006_SF_30.pdf PDF
Atch_25_Site_Vist_Q&As_14FEB19.pdf PDF
Solicitation_Amendment_FA469019RA0030003_SF_30.pdf PDF
Atch_23_Site_Visit_Minutes.pdf PDF
Atch_20_FOPR_Construct_Bath_House_3JAN19.pdf PDF
Atch_12_General_Provisions_-_8NOV18.pdf PDF
Atch_16b_-_WD_SD180006_Residental-Meade_5_Jan_18.pdf PDF
Atch_20b_SOW_6NOV18.pdf PDF
Atch_17_Determination_of_Resp.pdf PDF
Atch_20_FOPR_Construct_Bath_House.pdf PDF
Atch_20c_Drawing_1_Track_Utilities_Latrine_6NOV18.pdf PDF
Atch_15_Non-Nuclear_Intrusion_Det.pdf PDF
Atch_20g_AF_Form_3052.xls XLS spreadsheet
Atch_4_Spec_Section_01000_-20_Aug_15.pdf PDF
Atch_20d_RMD_KTR_to_Complete.pdf PDF
Atch_3_Submittal_Schedule_-20_Aug_15.pdf PDF
Atch_14_Contractor_Guide_-_16_Jun_15.pdf PDF
Atch_8_Exterior_Signs_-_10_Jun_05.pdf PDF
Atch_6_Design_CompatibilityStandards.pdf PDF
Atch_16d_-_WD_SD180033_Building-Meade_5_Jan_18.pdf PDF
Atch_21,_SECTION_L-_INSTRUCTIONS_TO_OFFERORS_18DEC18.pdf PDF
Atch_20f_Bid_Schedule-17_Oct_18.doc DOC document
Atch_16e_-_WD_SD180035_Building-Penn_5_Jan_18.pdf PDF
Atch_7_Ellsworth_Fire_Protection.pdf PDF
DRAFT_Atch_4_Spec_Section_01000_-20_Aug_15.pdf PDF
DRAFT_Atch_20d_RMD_KTR_to_Complete.pdf PDF
DRAFT_Atch_21_SECTION_L_Instructions,_Conditions,_and_Notices_to_Offerors.pdf PDF
DRAFT_Atch_12_General_Provisions_-_8NOV18.pdf PDF
DRAFT_Atch_16b_-_WD_SD180006_Residental-Meade_5_Jan_18.pdf PDF
DRAFT_Atch_20b_SOW_6NOV18.pdf PDF
DRAFT_Atch_16c_-_WD_SD180001_Heavy-Highway_6_Apr_18.pdf PDF
DRAFT_-_FA469019RA003.pdf PDF
DRAFT_Atch_8_Exterior_Signs_-_10_Jun_05.pdf PDF
DRAFT_Atch_19_PPQ.docx DOCX document
DRAFT_Atch_14_Contractor_Guide_-_16_Jun_15.pdf PDF
DRAFT_Atch_9_Submittal_Form_3000-1_Sep_03.pdf PDF
DRAFT_Atch_20a_GIPR_6NOV18.pdf PDF
DRAFT_Atch_22_SECTION_M_Evaluation_Factors.pdf PDF
DRAFT_Atch_16a_-_WD_SD180002_Residental-Penn_5_Jan_18.pdf PDF
DRAFT_Atch_6_Design_CompatibilityStandards.pdf PDF
DRAFT_Atch_1_Utility_Outages.pdf PDF
DRAFT_Atch_10_Electrical_Systems-15_Jan_15.pdf PDF
DRAFT_Atch_15_Non-Nuclear_Intrusion_Det.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPROVED DISAPPROVED

Attachment 3

S C

H E

D U

LE

S

, L

IS

TI

N

G S

, R E

P O

R

TS

, P

LA

N S

M A

N U

FA

C

TU

R

E R

'S R

E C

O M

M E

N D

A

TI

O N

D A

TE

R

E C

E

IV

E D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

E E

R

IN

G

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

M A

N U

FA

C

TU

R

E R

'S W

A R

R A

N

TY

C A

TA

LO

G D

A

TA

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A

TE

LI

N

E N

U M

B E

R

S A

M P

LE

S

C O

LO

R

S E

LE

C

TI

O

N

ACES Project Title

DATE CONTRACTOR

NOTIFIED

(To be completed by Contract Administrator)

Contract Number:

S U

B M

IT

TA

L N

U M

B E

R S

C O

N

TR

A C

TO

R

R E

S U

B M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

R E

TU

R

N S

U S

P E

N S

E D

A

TE

FI

E

LD

R

E P

O R

TS

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

TE

C

H N

IC

A

L D

A

TA

TE

S

T R

E P

O R

TS

Schedule of Material Submittals - 20 Aug 15

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

Material Submittals Schedule

File details come from the government source that posted it. Updated .