DRAFT_Atch_20d_RMD_KTR_to_Complete.pdf

PDF 592 KB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA469019RA003
Issued by
Department of the Air Force Air Combat Command

About this file

This recovered materials determination form documents the use of EPA-designated recovered content items in a construction contract. The contract requires paper and paper products, park and recreation products, vehicular products, landscaping products, construction products, non-paper office products, and transportation products that may contain recovered materials. The contractor must complete the form to request an exemption if any specified EPA items will not meet recycled content guidelines. It will be reviewed by Ellsworth Air Force Base civil engineering and become part of the contract file.

The related federal contract opportunity is a solicitation for multiple award construction contracts at Ellsworth Air Force Base, South Dakota. The procurement will result in awards to three small disadvantaged, HUBZone, or service-disabled veteran-owned small businesses. The North American Industry Classification code is 237990 and annual size standard is $36.5 million. The indefinite delivery, indefinite quantity contracts will provide new construction, renovation, alteration, demolition and repair services from November 2018 to June 2021, with a minimum value of $500 each and maximum total value of $18 million. The solicitation will be issued via www.fbo.gov on or around November 14, 2018. Prospective contractors must register in www.sam.gov to be eligible for award.

DRAFT Atch 20d RMD

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Atch_31_Follow_on_Q&As_26APR19.pdf PDF
Atch_30_Follow_on_Q&A_25APR19.pdf PDF
Atch_29_Follow_on_Q&As_23APR19.pdf PDF
Atch_20b_SOW_Updated_23APR19.pdf PDF
Solicitation_Amendment_FA469019RA0030009_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030008_SF_30.pdf PDF
Atch_28_-_Follow_on_Q&As.pdf PDF
Solicitation_Amendment_FA469019RA0030005_SF_30.pdf PDF
Atch_26_X-XX_PROJECT_TITLE.dwg DWG drawing
Atch_25_Site_Vist_Q&As_14FEB19.pdf PDF
Atch_24_Site_Visit_Minutes_24JAN19.pdf PDF
Solicitation_Amendment_FA469019RA0030003_SF_30.pdf PDF
Atch_23_Site_Visit_Minutes.pdf PDF
Solicitation_Amendment_FA469019RA0030001_SF_30.pdf PDF
Atch_20_FOPR_Construct_Bath_House_3JAN19.pdf PDF
Atch_18_Past_Performance_Information.docx DOCX document
Atch_22,_SECTION_M_-_EVALUATION_BASIS_FOR_AWARD_2JAN19.pdf PDF
Atch_5_Spec_Section_01800_-20_Aug_15.pdf PDF
Atch_11_Underground_Electrical_20Aug15.pdf PDF
Atch_16a_-_WD_SD180002_Residental-Penn_5_Jan_18.pdf PDF
Atch_1_Utility_Outages.pdf PDF
Atch_12_General_Provisions_-_8NOV18.pdf PDF
Atch_16b_-_WD_SD180006_Residental-Meade_5_Jan_18.pdf PDF
Atch_20b_SOW_6NOV18.pdf PDF
Atch_17_Determination_of_Resp.pdf PDF
Atch_20_FOPR_Construct_Bath_House.pdf PDF
Atch_20c_Drawing_1_Track_Utilities_Latrine_6NOV18.pdf PDF
Atch_15_Non-Nuclear_Intrusion_Det.pdf PDF
Atch_20g_AF_Form_3052.xls XLS spreadsheet
Atch_4_Spec_Section_01000_-20_Aug_15.pdf PDF
Atch_20d_RMD_KTR_to_Complete.pdf PDF
DRAFT_Atch_20f_Bid_Schedule-17_Oct_18.doc DOC document
DRAFT_Atch_13_NAFGeneral_Provisions-21Jan15.pdf PDF
DRAFT_Atch_16e_-_WD_SD180035_Building-Penn_5_Jan_18.pdf PDF
DRAFT_Atch_20_FOPR_Construct_Bath_House.docx DOCX document
DRAFT_Atch_18_Past_Performance_Information.docx DOCX document
DRAFT_Atch_17_Determination_of_Resp.pdf PDF
DRAFT_Atch_4_Spec_Section_01000_-20_Aug_15.pdf PDF
DRAFT_Atch_21_SECTION_L_Instructions,_Conditions,_and_Notices_to_Offerors.pdf PDF
DRAFT_Atch_12_General_Provisions_-_8NOV18.pdf PDF
DRAFT_Atch_16b_-_WD_SD180006_Residental-Meade_5_Jan_18.pdf PDF
DRAFT_Atch_20b_SOW_6NOV18.pdf PDF
DRAFT_Atch_16c_-_WD_SD180001_Heavy-Highway_6_Apr_18.pdf PDF
DRAFT_-_FA469019RA003.pdf PDF
DRAFT_Atch_8_Exterior_Signs_-_10_Jun_05.pdf PDF
DRAFT_Atch_19_PPQ.docx DOCX document
DRAFT_Atch_7_Ellsworth_Fire_Protection.pdf PDF
DRAFT_Atch_16d_-_WD_SD180033_Building-Meade_5_Jan_18.pdf PDF
DRAFT_Atch_20e_6_Percent_Limit_on_Design_Fee_for_Contractors.pdf PDF
DRAFT_Atch_20c_Drawing_1_Track_Utilities_Latrine_6NOV18.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Ellsworth AFB Recovered Materials Determination Form For Construction Contracts Only

PAPER AND PAPER PRODUCTS

PARK AND RECREATION PRODUCTS

VEHICULAR PRODUCTS

LANDSCAPING PRODUCTS

CONSTRUCTION PRODUCTS

NONPAPER OFFICE PRODUCTS

TRANSPORTATION PRODUCTS

MISCELLANEOUS PRODUCTS

This form is to be completed by the Contractor for documentation of exemption for the use if EPA-designated items included in the Green Procurement Program. For questions on whether the product counts as "EPA-designated" or what the required recycled content is, refer to product descriptions on EPA's website at www.epa.gov/osw/conserve/tools/cpg/products. The completed form becomes part of the contracting office contract file. The Contracting Officer will forward a copy of the completed form to 28 CES/CEIE, Attn: Green Procurement Program The EPA-designated items being procured are: (mark below all that apply) Recovered Materials Determination Form

Green Procurement Determination

PROJECT NUMBER:

The following EPA-designated guideline item is included in the specifications for the project number listed above. However, compliance with EPA standard is not attainable.

I have determined that the EPA Guidelines were considered and determined inapplicable, based on the following:

Market Research was performed by calling vendors, but only was able to supply the product.

(insert # of vendors contacted) (enter VENDOR name) This determination is made in accordance with FAR 23.405(b)(2).

Civil Engineering Recommendation 9.0.0.2.20120627.2.874785

CheckBox1: 0
CheckBox1: 1
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 1
CheckBox1: 0
CheckBox1: 0
CheckBox1: 1
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 1
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
TextField1: Opportunity 1070287
TextField1: Opportunity 1070287
TextField2:
DateTimeField2:
DateTimeField3:
TextField4:
SignatureField1:
DateTimeField1:
CheckBox2: 0
CheckBox3: 0
DateTimeField4:

File details come from the government source that posted it. Updated .