Attachment 14 - Electrical lines as built - Well no.9.pdf

PDF 3 MB Posted

Attached to
Replace Utility Well #9 Beale AFB Federal contract opportunity
Solicitation number
FA468624R0006
Issued by
Department of the Air Force Air Combat Command

About this file

This document appears to be an attachment providing electrical as-built drawings and details for Well #9 at Beale AFB. The drawings show the layout and specifications for a new 225kVA pad-mounted transformer, 200A panelboard, underground ductbank and feeder loop, new pole lighting, and a 3-way pad-mounted switch. The intent is to replace the existing electrical infrastructure to support the replacement of Well #9, as described in Solicitation FA468624R0006 for the "Replace Utility Well #9 Beale AFB" project. Key details include the use of 12.47kV underground distribution feeders, 15kV EPR cable, and concrete-encased ductbank. The drawings provide GPS coordinates for the underground alignment and indicate the electrical work is to be coordinated with the 9 CES/CEIE group. This attachment provides the technical specifications and as-built details for the electrical system upgrades required under the stated federal contract opportunity.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE 8916 ENLARGED VIEW - WELL#6

SITE 8915 ENLARGED VIEW - WELL#5

SITE 8914 ENLARGED VIEW - WELL#4

SITE 8999 ENLARGED VIEW - WELL#9

1. NEW 225KVA, 12.47KV-277/480V, 3PH, 4W PAD MOUNTED

TRANSFORMER WITH LOOP FEED SWITCHES. SEE SINGLE

LINE DIAGRAM ON SHEET E-501 FOR DETAILS.

2. NEW PANEL FEEDER: (4)#1/0 CU & (1)#6CU GND IN 3"

CONDUIT. SEE STRUCTURAL DRAWINGS FOR MOUNTING

STRUCTURE.

3. NEW 200A, 277/480V, 3PH, 4W NEMA3R, PANELBOARD. SEE

SINGLE LINE DIAGRAM ON SHEET E-501 FOR DETAILS.

4. THE INTENT OF THIS PROJECT IS TO PLACE THE NEW

UNDERGROUND DUCTBANK AND HANDHOLES WITHIN THE

BOUNDARY OF THE CAR PATH. THE ALIGNMENT OF THE

ELECTRICAL UNDERGROUND DUCTBANK AS SHOWN ON

THE PLANS ARE FOR APPROXIMATE REFERENCE LOCATION

ONLY, AND MAY NOT REFLECT ALL THE EXISTING FIELD

CONDITIONS OR ENVIRONMENTAL CONDITIONS AS

COORDINATED WITH 9 CES/CEIE PRIOR TO INSTALLATION.

THE EXACT LOCATION OF ALL UNDERGROUND ALIGNMENTS

WILL BE GPS MARKED AT THE POINT OF CONNECTION AND

EVERY 100'. GPS DATA WILL BE RECORDED AND SUBMITTED

ON THE AS-BUILT CONSTRUCTION DOCUMENTS.

5. PROVIDE NEW 12.47KV UNDERGROUND DUCTBANK AND

DISTRIBUTION FEEDER LOOP FOR THIS LINE, (3)#1/0 CU,

15KV, EPR, IN 5" CONDUIT, PLUS (1)5" SPARE CONDUIT,

ENCASED IN CONCRETE. TYPICAL FOR CIRCUIT D5A. SEE

SINGLE LINE DIAGRAM, SHEET E-501 FOR DETAILS. ALL

CONDUITS TO TURN-UP INTO TRANSFORMER'S OR

SWITCH'S HOUSING.

6. NEW POLE LIGHT FIXTURE. SEE DETAIL 3/E-802.

7. POLE LIGHT FIXTURE CIRCUIT FEEDER: (2)#12CU & (1)#12CU

GND IN 1/2" CONDUIT. SEE SINGLE LINE DIAGRAM ON SHEET

E-501 FOR DETAILS.

8. PROVIDE NEW 12.47KV UNDERGROUND DUCTBANK AND

DISTRIBUTION FEEDER LOOP FOR THIS LINE, (3)#1/0 CU,

15KV, EPR, IN 5" CONDUIT, PLUS (1)5" SPARE CONDUIT,

ENCASED IN CONCRETE FOR CIRCUIT D5A; AND (3)#1/0 CU,

15KV, EPR, IN 5" CONDUIT FOR CIRCUIT D5B TO SWITCH

PART OF TRANSFORMER. SEE SINGLE LINE DIAGRAM,

SHEET E-501 FOR DETAILS. ALL CONDUITS TO TURN-UP

INTO TRANSFORMER'S HOUSING.

9. NEW 3-WAY, 200A, NON-FUSED, 15KV PAD MOUNTED

SWITCH. SEE SINGLE LINE DIAGRAM ON E-502 FOR DETAILS.

10. EXISTING POWER POLE. FURNISH AND INSTALL STEPS AND

NEW RISER FOR CIRCUIT D7. SEE SINGLE LINE DIAGRAM

SHEET E-502 AND POLE DETAIL 2/E-802.

11. PROVIDE NEW 12.47KV UNDERGROUND DUCTBANK AND

DISTRIBUTION FEEDER FOR CIRCUIT D7, THIS LINE: (3)#1/0

CU, 15KV, EPR, IN 5" CONDUIT IN CONCRETE.

12. PROVIDE NEW 12.47KV UNDERGROUND DUCTBANK

FEEDER, (3)#1/0CU, 15KV, EPR, IN 5" CONDUIT IN CONCRETE.

Electrical Sheet Notes:

Web: dinter.com

Airfield Electrical

ENGINEERING CONFIDENCE

385 Gentry Way

Reno, NV 89502

Ph: 775.826.4044

Fax: 775.826.4190

J-4676.1

Design build team:

THESE MODIFIED OR AS-BUILTS DRAWINGS HAVE BEEN

PREPARED, IN WHOLE OR IN PART, ON THE BASIS OF

INFORMATION COMPILED AND FURNISHED BY OTHERS

UNDER AGREEMENT WITH THE OWNER OF THE PROJECT.

DINTER ENGINEERING CO. IS NOT RESPONSIBLE FOR ANY

ERRORS OR OMISSIONS WHICH HAVE BEEN

INCORPORATED INTO THIS DOCUMENT AS A RESULT.

CAREFUL EXAMINATION OF ACTUAL CONSTRUCTION

SHOULD BE UNDERTAKEN PRIOR TO EXCAVATION,

CUTTING, MODIFICATION, OR CONNECTION OF

SUBSEQUENT CONSTRUCTION.

DATE: 09/14/2023

TIMOTHY A. PROCKISH PE

DINTER ENGINEERING CO.