Attachment 7 - Hold Harmless Agreement - repair sewer manholes - amendment 1.docx
DOCX document 28 KB Posted
- Attached to
- Repair Sewer Manholes Beale AFB
- Solicitation number
- FA468624F0005
About this file
This document contains a hold harmless agreement pertaining to solicitation number FA468624F0005 for repair of sewer manholes at Beale Air Force Base. The agreement acknowledges that the project may not be awarded in the current or future fiscal years. It details that the contractor will conduct a site visit, prepare and revise proposals and required designs without liability to the government. Any estimates prepared by the contractor are proprietary. Proposal prices negotiated will expire 90 days from submission. The purpose of the solicitation is to repair various sewer manholes across Beale AFB by replacing or resealing grade rings, frames, covers, and raising frames 6 inches above ground. The contractor will furnish all design, labor, transportation, materials, testing, analysis, reports, permits, and equipment to repair sewer manholes and address inflow and infiltration issues. The solicitation is issued by the Department of the Air Force Air Combat Command.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Construction Contract
HOLD HARMLESS AGREEMENT
This agreement pertains to the following project:
11790270 – Repair Sewer Manholes
The Contractor hereby acknowledges that the project above may not be awarded in this or in any future fiscal year. The Government reserves the right to award or cancel the project, not later than 90 days from proposal submission.
The Contractor hereby agrees to conduct a site visit, prepare (and revise as needed) a project proposal and required design/drawings, engage in negotiations, and perform such other acts as are necessary to prepare the project for award without any liability on the part of the Government.
Any project design/cost estimates prepared by the Contractor are done so on a voluntary basis, will be treated as proprietary information, and will not be used for any purpose outside the scope of this effort.
Proposal prices negotiated will expire at midnight, 90 days from proposal submission of the year in which negotiations take place. After that date, proposal prices may be renegotiated.
Contractor’s Signature
Title
Company
Date