Attachment 11 - RFI Repair Sewer Manholes.docx

DOCX document 16 KB Posted

Attached to
Repair Sewer Manholes Beale AFB
Solicitation number
FA468624F0005
Issued by

About this file

This request for information and accompanying questions and answers document provide details for a federal contract opportunity to repair sewer manholes at Beale Air Force Base in California. The purpose of the project is to repair various sewer manholes across the base by replacing or resealing grade rings, frames, covers, and addressing inflow and infiltration issues. Work will include raising frames of manholes six inches above ground where applicable, installing plugs, repairing and sealing around pipes and benches, and addressing any other inflow and infiltration problems identified. The contractor will be required to furnish all labor, supervision, transportation, materials, testing, reports, permits, and equipment necessary to complete the repair work. The solicitation number for this opportunity is FA468624F0005 and is being issued by the Department of the Air Force Air Combat Command.

View the file

Other files

File Type Posted
Attachment 1 - Repair Sewer Manholes SON v2.pdf PDF
Attachment 0 - FA468624R00050006 - revision 6.pdf PDF
Attachment 12 - AF 813 Repair Sewer Manholes.pdf PDF
Attachment 0 - FA468624R00050005 - revision 5.pdf PDF
Attachment 0 - FA468624R00050004 - revision 4.pdf PDF
Attachment 0 - FA468624R00050003 - revision 3.pdf PDF
Attachment 7 - Hold Harmless Agreement - repair sewer manholes - amendment 1.docx DOCX document
Attachment 0 - FA468624R0005 Revision 2.pdf PDF
Solicitation Amendment - FA468624R0005 Revision 1.pdf PDF
Attachment 3 - Site plan revision 1.pdf PDF
Attachment 0 - Solicitation - FA468624R0005.pdf PDF
Attachment 9 - AF 3064 Progress Schedule.xlsx XLSX spreadsheet
Attachment 4 - Past Performance Questionnaire - Repair Sewer Manholes.pdf PDF
Attachment 6 - AF 3052 - Construction Cost Estimate Breakdown.xlsx XLSX spreadsheet
Attachment 3 - Site Plan.pdf PDF
Attachment 8 - AF66 Submittal schedule.xlsx XLSX spreadsheet
Attachment 1 - Repair Sewer Manholes SON.pdf PDF
Attachment 5 - Bid Schedule - Repair Sewer Manholes.docx DOCX document
Attachment 10 - CONTRACTOR EAL 2024.xlsx XLSX spreadsheet
Attachment 2 - Wage Determinations CA20240007.pdf PDF
Attachment 7 - Hold Harmless Agreement - repair sewer manholes.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Repair Sewer Manholes I&I Project

No.
QUESTIONS
ANSWERS
1
Project scope states to raise the frames of manholes 6” above ground. Please identify which manholes this applies to.
General term in the scope. Upon the site check of the manholes, this scope does not apply to the current list of manholes.
2
SN #2 states demo building ties into abandoned line. Please clarify scope. Does this mean remove/excavate existing pipes to building? Or just cap/plug at manhole?
The Scope for the remained pipe at the Demoed Building at (South of Gavin Mandry/4th

Street). is to drill the existing concrete in the pipe carefully (do not break the pipe) refill by concrete to stop infiltration.

3
SN calls out drill & grout. Please clarify what drill & grout scope entails.
4
Are any of the manholes in environmentally sensitive areas? If so, is there an 813 for those particular sites? Example MH87
AF-813 is in process. Environmental protection requirements will be provided for the manholes.
5
Are there any concerns or restrictions to access manholes located within environmentally sensitive areas?
Based on the site check, one or two manholes will need access that requires environmental assessment, which will be provided upon approval of the af-813.
Please confirm if manhole 402 is part of scope.
Manhole 402 is not part of the scope
6
Please confirm if manhole 405 is part of scope.
Manhole 405 is part of the scope (SON adjusted).
7
Do we plug the east side of MH439?
Manhole 439, 335, and similar which are abandoned and isolated from the current service line, must be filled with PCC (Plain Cement Concrete) 12” over the pipe level to stop infiltration to the system from all sides.
8
Do you want to replace the ring or riser on MH505?
Inflow from the joints of the top ring was identified at MH505.

Seal the existing leaking joint if possible or replace the ring if needed.

9
SON, B., states: "The Contractor shall furnish all design, labor, supervision…" Is design part of the requirement?
Desing is not required. A work plan will be needed to document the pre-repair scopes and will be updated as an as built when the repair is completed for reporting and record purposes.
10
Can contractor park work vehicle on shoulder of road directly next to manhole site(s)?
Locations for equipment close to the manholes will be identified through the af-813 approval.