Attachment 7 - Hold Harmless Agreement - repair sewer manholes.docx
DOCX document 28 KB Posted
- Attached to
- Repair Sewer Manholes Beale AFB
- Solicitation number
- FA468624F0005
About this file
This document contains a hold harmless agreement pertaining to a federal contract opportunity to repair sewer manholes at Beale Air Force Base. The opportunity involves replacing or resealing grade rings, frames, covers, and raising frames on various manholes across the base to address 6 inches above ground. The contractor must furnish all design, labor, transportation, materials, testing, permits, equipment, and work to repair the manholes and address inflow and infiltration issues. The agreement acknowledges that the project may not be awarded in the current or future fiscal years and reserves the right to award or cancel within 90 days of proposal submission. The contractor agrees to conduct site visits, prepare and revise proposals and designs without liability on the part of the government. Proposal prices negotiated will expire on December 31 of the negotiation year.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Construction Contract
HOLD HARMLESS AGREEMENT
This agreement pertains to the following project:
1123539 – Utility Well and CVIA Agricultural Wells
The Contractor hereby acknowledges that the project above may not be awarded in this or in any future fiscal year. The Government reserves the right to award or cancel the project, not later than 90 days from proposal submission.
The Contractor hereby agrees to conduct a site visit, prepare (and revise as needed) a project proposal and required design/drawings, engage in negotiations, and perform such other acts as are necessary to prepare the project for award without any liability on the part of the Government.
Any project design/cost estimates prepared by the Contractor are done so on a voluntary basis, will be treated as proprietary information, and will not be used for any purpose outside the scope of this effort.
Proposal prices negotiated will expire at midnight, 31 Dec of the year in which negotiations take place. After that date, proposal prices may be renegotiated.
Contractor’s Signature
Title
Company
Date