Attachment 9 - AF 3064 Progress Schedule.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Repair Sewer Manholes Beale AFB
Solicitation number
FA468624F0005
Issued by

About this file

This document contains a federal contract solicitation and progress schedule template. The solicitation is for repair of sewer manholes at Beale Air Force Base, requiring design, labor, materials, equipment, transportation, testing, analysis, reports, and permits to repair manholes, replace or reseal grade rings and covers, raise frames, install plugs, seal around pipes and benches, and address inflow and infiltration issues. The Air Combat Command of the Department of the Air Force is listed as the contracting agency. The progress schedule template includes sections for contract and project information, work elements, scheduled and actual progress percentages, and approval signatures.

View the file

Other files

File Type Posted
Attachment 1 - Repair Sewer Manholes SON v2.pdf PDF
Attachment 0 - FA468624R00050006 - revision 6.pdf PDF
Attachment 12 - AF 813 Repair Sewer Manholes.pdf PDF
Attachment 0 - FA468624R00050005 - revision 5.pdf PDF
Attachment 0 - FA468624R00050004 - revision 4.pdf PDF
Attachment 0 - FA468624R00050003 - revision 3.pdf PDF
Attachment 7 - Hold Harmless Agreement - repair sewer manholes - amendment 1.docx DOCX document
Attachment 0 - FA468624R0005 Revision 2.pdf PDF
Solicitation Amendment - FA468624R0005 Revision 1.pdf PDF
Attachment 11 - RFI Repair Sewer Manholes.docx DOCX document
Attachment 3 - Site plan revision 1.pdf PDF
Attachment 0 - Solicitation - FA468624R0005.pdf PDF
Attachment 4 - Past Performance Questionnaire - Repair Sewer Manholes.pdf PDF
Attachment 6 - AF 3052 - Construction Cost Estimate Breakdown.xlsx XLSX spreadsheet
Attachment 3 - Site Plan.pdf PDF
Attachment 8 - AF66 Submittal schedule.xlsx XLSX spreadsheet
Attachment 1 - Repair Sewer Manholes SON.pdf PDF
Attachment 5 - Bid Schedule - Repair Sewer Manholes.docx DOCX document
Attachment 10 - CONTRACTOR EAL 2024.xlsx XLSX spreadsheet
Attachment 2 - Wage Determinations CA20240007.pdf PDF
Attachment 7 - Hold Harmless Agreement - repair sewer manholes.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

0
CONTRACT PROGRESS SCHEDULEForm Approved OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintianing the data needed, and completing and reviewing the collection of information. Send comments regarding this burden or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Heaquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT RETURN your form to either of thes addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
1. CONTRACT NO.8. PROJECT TITLE10. APPROVAL RECOMMENDED BY:
DATE SIGNEDINSTALLATION ENGINEER'S SIGNATURE
2. START DATE
3. COMPLETION DATE9. SUBMITTED BY:
4. PURCHASE REQUEST NO.DATE SIGNEDCONTRACTOR'S NAME (Last, First, Middle Initial) Address (Street, City, State, Zip Code)CONTRACTOR'S SIGNATURE11. APPROVED BY:
5. PROJECT NO.DATE SIGNEDCONTRACTING OFFICER'S SIGNATURE
6. ACTUAL START DATE
7. ACTUAL COMPLETION DATE
LINE NO.WORK ELEMENTS%WEEKS

1 SUBCONTRACTOR SELECTION MATERIAL SUBMITTAL

8 FINAL CLEANUP AND PROJECT CLOSEOUT

100% 100%

90% 90%

80% 80%

70% 70%

60% 60%

50% 50%

40% 40%

30% 30%

20% 20%

10% 10%

0% 0%

SCHEDULED PROGRESS COMPLETED THIS PERIOD: SCHEDULED PROGRESS COMPLETED CUMULATIVE:100%0.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0
0.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0
ACTUAL PROGRESS COMPLETED:

&"Arial,Bold"&14AF FORM 3064, JUN 90

Sheet2

Sheet3

File details come from the government source that posted it. Updated .