The attached document is an AF 813 form that describes the requirements for repairing various sewer manholes across Beale Air Force Base (AFB). The purpose of this project is to replace/reseal grade rings, frames, and covers of in-service manholes, raise manhole frames 6 inches above ground, install plugs, repair and seal around pipes, benches, and plugs, and address any inflow and infiltration issues. The contractor must provide all design, labor, supervision, materials, testing, analysis, reports, permits, and equipment necessary to complete the work as outlined in the attached Statement of Work. The solicitation number is FA468624F0005, and the project is being procured by the Department of the Air Force Air Combat Command.

View the file

Other files

File Type Posted
Attachment 1 - Repair Sewer Manholes SON v2.pdf PDF
Attachment 0 - FA468624R00050006 - revision 6.pdf PDF
Attachment 0 - FA468624R00050005 - revision 5.pdf PDF
Attachment 0 - FA468624R00050004 - revision 4.pdf PDF
Attachment 0 - FA468624R00050003 - revision 3.pdf PDF
Attachment 7 - Hold Harmless Agreement - repair sewer manholes - amendment 1.docx DOCX document
Attachment 0 - FA468624R0005 Revision 2.pdf PDF
Solicitation Amendment - FA468624R0005 Revision 1.pdf PDF
Attachment 11 - RFI Repair Sewer Manholes.docx DOCX document
Attachment 3 - Site plan revision 1.pdf PDF
Attachment 0 - Solicitation - FA468624R0005.pdf PDF
Attachment 9 - AF 3064 Progress Schedule.xlsx XLSX spreadsheet
Attachment 4 - Past Performance Questionnaire - Repair Sewer Manholes.pdf PDF
Attachment 6 - AF 3052 - Construction Cost Estimate Breakdown.xlsx XLSX spreadsheet
Attachment 3 - Site Plan.pdf PDF
Attachment 8 - AF66 Submittal schedule.xlsx XLSX spreadsheet
Attachment 1 - Repair Sewer Manholes SON.pdf PDF
Attachment 5 - Bid Schedule - Repair Sewer Manholes.docx DOCX document
Attachment 10 - CONTRACTOR EAL 2024.xlsx XLSX spreadsheet
Attachment 2 - Wage Determinations CA20240007.pdf PDF
Attachment 7 - Hold Harmless Agreement - repair sewer manholes.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4/16/24, 2:53 PM AF FORM 813

about:blank 1/5

REQUEST FOR ENVIRONMENTAL IMPACT ANALYSIS Report Control Symbol (RCS):

WT 1139303

INSTRUCTIONS: Section I to be completed by Proponent; Sections II and III to be completed by Environmental Planning Function. Continue on separate sheets as necessary. Reference appropriate item number(s).

SECTION I - PROPONENT INFORMATION

1. TO (Environmental Planning Function)

9 CES/CEIE

2. FROM (Proponent organization and functional address symbol) Air Force - 9 CES

2a. TELEPHONE NO.

530-634-0642

3. TITLE OF PROPOSED ACTION

Repair Sewer Manholes

4. PURPOSE AND NEED FOR ACTION (Identify decision to be made and need date)

1. What do you intend to accomplish and why is the action necessary?

Repair 23 sewer manholes on Base. Repairing of manholes is necessary to prevent inflow and infiltration to the main in-service sewer system which causes substantial dynamic flow to the base WWTP and spreads bacteria due to surface overflow from the system.

2. What is currently being done to meet the need?

System has been inspected, leak sources have been identified and reported for correction.

3. Provide any additional details related to the Purpose and Need for Action.

The purpose is to reduce the flow volume on WWTP and prevent further spreading of bacteria. Repairing the manholes and leak sources will satisfy the need.

Need Date: 03/29/2024

5. DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES (DOPAA) (Provide sufficient details for evaluation of the total action.)

1. What other alternatives have been considered (to include the no action alternative)?

No action alternative will continue the inflow and infiltration that damage the in-service WWTP system due to a high-volume flow and spreading of bacteria over the ground surface that contaminates the underground water and surrounding atmosphere.

2. What alternatives were eliminated from consideration and why?

Digging and filling around the back side of the manholes were eliminated from the alternative due to the environmental restrictions and high-cost scope compared to the proposed action.

3. Please provide a description of the construction action and timing when it will occur.

Repair of inside the 23 sewer manholes with fill/grout of leaking using Plain Cement Concrete (PCC) for blocking the abounded network lines inside the manholes and replacing the cover of up to two manholes. Work is intended to begin and complete within April, May, and June of 2024.

4. Describe the project location. Attach map(s)/diagram(s) – make sure to include an overview map of where your requested project area is on the installation.

Site map with locations of all manholes is attached

5. Describe additional project requirements: 1) Construction and site preparation requirements (include approx. area of ground to be disturbed); 2) Does the project require a laydown yard or storage area? If so, describe the location and groundwork required.

1) No site preparations required.

2) A specific laydown area is not needed.

6. Describe additional project requirements: 3) Will soil boring/sampling/potholing occur during a design phase? If so, a separate dig permit will be required; 4) Detailed operational activities; 5) Equipment/material lists.

3) N/A. Ground disturbance will not occur.

4) Same as existing.

5) A mobile UBT vehicle will be used, parked on a hard surface close to each work location.

7. Provide any additional details related to the Description of the Proposed Action and Alternatives.

none

Map Attachments:

Access Route Maps.pdf Tab 5. Site plan.pdf

Location Description / Justification:

Within Beale Air Force Base, California. See attached map for the exact locations.

6. PROPONENT APPROVAL (Name and Grade) Ahmad Shir DOD - shir.ahmad

6a. SIGNATURE //Ahmad Shir DOD - shir.ahmad i:0e.t|fedvis|shir.ahmad//

6b. DATE 03/04/2024

SECTION II - PRELIMINARY ENVIRONMENTAL SURVEY (Check appropriate box and describe potential environmental effects including cumulative effects.) (+ = positive effect; 0 = no effect; - = adverse effect; U = unknown effect)

+ 0 - U

7. AIR INSTALLATION COMPATIBLE LAND USE/ZONE USE (Noise, accident potential, encroachment, etc.) X

8. AIR QUALITY (Emissions, Attainment status, state implementation plan, etc.) X

9. WATER RESOURCES (Drinking water, wastewater, quality, quantity, source, water features, etc.) X

10. SAFETY AND OCCUPATIONAL HEALTH (Asbestos/lead-based paint/radiation/chemical exposure, explosives safety quantity distance, bird/wildlife aircraft hazard, etc.)

X

11. HAZARDOUS MATERIALS/WASTE (Use/storage/generation, solid waste, toxic materials, etc.) X

12. BIOLOGICAL RESOURCES (Wetlands/floodplains, threatened or endangered species, etc.) X

13. CULTURAL RESOURCES (Burial sites, archaeological, historical, etc.) X

14. GEOLOGY AND SOILS (Topography, minerals, geothermal, Installation Restoration Program, seismicity, etc.) X https://intelshare.intelink.gov/sites/USAFNEPA/Attachments/1709595805604/Access%20Route%20Maps.pdf https://intelshare.intelink.gov/sites/USAFNEPA/Attachments/1709595805604/Tab%205.%20Site%20plan.pdf about:blank 2/5

15. SOCIOECONOMIC (Employment/population projections, school and local fiscal impacts, etc.) X

16. OTHER (Potential impacts not addressed above, such as Host Nation considerations/concerns for non-US locations.) X

SECTION III - ENVIRONMENTAL ANALYSIS DETERMINATION

17. PROPOSED ACTION QUALIFIES FOR CATEGORICAL EXCLUSION (CATEX) #A2.3.9. ; OR

PROPOSED ACTION DOES NOT QUALIFY FOR A CATEX; FURTHER ENVIRONMENTAL ANALYSIS IS REQUIRED.

18. REMARKS

Categorical exclusion (CATEX) A2.3.9. is applied: "Repairing and replacing real property installed equipment.” None of the unique circumstances that preclude the assignment of a CATEX are known to be present at this time (32 CFR 989 A.2.2). An AF Form 103 is required 30 calendar days before construction begins. Refer to the attached required Beale Environmental Specifications. Note that there are specific requirements outlined in the Biological Resources section of this AFF 813 that need to be followed as they pertain to different portions of the project.

19. ENVIRONMENTAL PLANNING FUNCTION CERTIFICATION

(Name and Grade) Robinson, Michael GS-13

19a. SIGNATURE //Robinson Michael D DOD CIV - michael.d.robinson7 i:0e.t|fedvis|michael.d.robinson7//

19b. DATE 04/16/2024

AF IMT 813, 199990901, V1 THIS FORM CONSOLIDATES AF FORMS 813 AND 814.

PREVIOUS EDITIONS OF BOTH FORMS ARE OBSOLETE.

about:blank 3/5

CONTINUATION SHEET

Review Comments:

Water Resources (03/05/2024 - Avery Joshua DOD - joshua.c.avery)

1. Will a new or modified National Pollutant Discharge Elimination System (NPDES), or HN equivalent, permit be required?

No

2. Would the Project require permitting to discharge effluents into an existing body of water?

No

3. Would the Project impact any existing body of water, floodplain or jurisdictional wetland?

No

4. Are there downstream sedimentation or storm water-born pollution issues that may be impacted by implementing the Project?

No

5. Will the Project comply with the installation’s Storm Water Pollution Prevention Plan or require a modification?

Will comply; No modification required

6. Does the installation drain to an impaired water body and would the Project have the potential to create excessive runoff, sedimentation, and/or erosion as a result of implementing the Project?

No

7. Would the Project have the potential to adversely affect/require mods or substantial changes to installation or community groundwater, wastewater, storm water or other natural or manmade water systems to accommodate regulated wastewater pollutants?

The project would benefit the wastewater system and its ability to accommodate regulated wastewater pollutants

8. Does the installation lack sustainable and adequate potable and process water supplies to support the Project?

No

The proposed action meets requirements.

AICUZ/Land Use (03/06/2024 - Williams Anissa DOD - anissa.f.williams)

1. Will the Project produce excessive noise?

No.

2. Are there any sensitive receptors within the increased noise zones?

No.

3. Will the effects of the Project require changes to the surrounding land use outside the installation boundaries?

No.

4. Will the Project increase the potential for encroachment concerns?

No.

5. Will installation airspace, range, military training route airspace, special use airspace or uncontrolled airspace be affected and/or require modification?

No.

Air Quality (03/06/2024 - Stewart Susan DOD - susan.b.stewart)

1. Will the Project create criteria pollutant and/or hazardous air pollutant emissions during construction and or operations?

Neutral effect. Proposed actions would result in no emission increase or an increase in emissions that is clearly de minimis.

2. Will implementation of the Project require the issuance of a new or modified air permit?

No. Project will not require the issuance of a new or modified air permit.

3. Has the Project been analyzed in Air Conformity Applicability Model (ACAM)? Attach the ACAM report.

Action meets General Conformity Exemption 40 CFR 93.153(c)(2)(iv) and does not require ACAM.

4. Will the Project include source(s) that may be classified as a New Source or a major modification of an existing source?

No. Proposed action will not include source(s) that may be classified as a New Source or a major modification of an existing source.

5. Will mitigation, emissions control devices and/or other management practices be required to minimize or eliminate effects to the region’s air quality condition with regard to attainment of National Ambient Air Quality Standards (NAAQS)?

Project proponents and project Contractors shall adhere to 813 & 103 work clearance Air Quality best management practices throughout duration of project.

*Minimize nuisance dust emissions

*Air Quality (FRAQMD compliance): The contractor/shop shall comply with the Feather River Air Quality Management District (FRAQMD) Standard Mitigation Measures for All Projects, Indirect Source Review Guidelines, and Fugitive Dust Control Mitigation Measures during construction to minimize construction related air quality impacts. Reference: FRAQMD requirements at https://www.fraqmd.org/ceqa-planning about:blank 4/5

*All abrasive blasting shall be performed under permit issued by applicable air quality regulatory agency (FRAQMD) and all abrasive blasting shall be performed/conducted in a manner complying with Title 17 CCR, Division 3, Chapter 1, Subchapter 6. Contractor shall obtain abrasive blasting permit prior to performing blasting work and comply with air quality rules/regulations. Contractor shall only use abrasive blasting media certified for use by California’s Air Resources Board (See section 92530 Certified Abrasives of Subchapter 6, Chapter 1, Division 3 of Title 17)

*Any portable equipment, having a 50 bhp engine or more, brought onto Beale AFB property shall be registered under California Air Resources Board (CARB) Portable Equipment Registration Program (PERP).

PERP Registration numbers must be provided to 9 CES/CEIE Air Quality Manager (530-634-2844) within three (3) business days of arriving on Beale property. Portable equipment includes, but not limited to, air compressors, generators, concrete pumps, tub grinders, wood chippers, water pumps, drill rigs, pile drivers, rock drills, abrasive blasters, aggregate screening and crushing plants, and concrete batch plants.

*Air Quality (Title 13 CCR): In accordance with Title 13 CCR, Section 2485, all diesel-fueled commercial vehicles operating in the State of California with a gross vehicular weight of greater than 10,000 lbs. and are or must be licensed to operate on highways shall not be idled for greater than five (5) minutes at any location. See Title 13 CCR, Section 2485, Subsection (d) for exceptions.

*HAZMAT Disturbance Risk: Project work could disturb hazardous materials such as asbestos or lead based paint, if they are present in the work area. The contract must include the requirement for a hazardous material survey, performed by a state certified lead/asbestos and hazardous materials consultant, as a contractor responsibility. This will ensure that hazardous materials, if present, will be identified and properly managed by the contractor.

* Health & Safety Work Plan: The contractor must submit a Health and Safety Plan and Abatement Work Plan that includes worker health and safety practices for the abatement activities. The Health and Safety Plan must include valid certificates for each worker that will be involved in the abatement showing they have completed required AHERA and OSHA training requirements. A copy must be provided to 9 CES/CEIE Air Quality Program Manager. For more information, contact 530-634-2844

* In the event that unexpected asbestos is found or previously non-friable asbestos material becomes crumbled, pulverized, or reduced to powder the Contractor should immediately stop work.

Contractor/Shop personnel shall provide event details to Beale AFB by immediately notifying the Contracting Officer, 9 CES/CEN Project Manager and 9 CES/CEIE Air Quality Program Manager. The Contractor shall consult with a California Certified Asbestos Consultant to complete applicable testing. If renovation, abatement, removal activities and/or other work practices/processes renders any amount of previously non-friable asbestos containing materials friable, the Contractor/Shop should stop work and shall immediately submit a signed NESHAP notification form via certified mail to US EPA Pacific Southwest, Region 9. A copy of the notification will be submitted to California Air Resources Board (asbestos@arb.ca.gov), the contracting officer and to the 9 CES/CEIE Air Quality Program Manager. For more information, contact 9 CES/CEIE at 530-634-2844.

* Asbestos and LBP Compliance: The contractor/shop must comply with applicable AHERA, EPA, NESHAP and OSHA laws and regulations when working in areas with asbestos or lead hazards.

* Asbestos Abatement Notification: Beale AFB requires notification at least 10-working days prior to any asbestos abatement project, to include any site preparation that would breakup, dislodge or disturb any asbestos containing materials. Notify US EPA Pacific Southwest, Region 9 by submitting a written and signed NESHAP form via certified mail at least 10-working days prior to any project that removes or disturbs regulated asbestos containing materials in excess of specified quantities. A copy of the notification will be submitted to California Air Resources Board (asbestos@arb.ca.gov), the Contracting Officer, the 9 CES/CEIE Air Quality Program Manager, and Beale’s Bio-Environmental office. For more information, contact 9 CES/CEIE at 530-634-2844. Notify Cal-OSHA at least 24 hours prior to removing regulated asbestos containing materials. The contractor must complete all required notifications.

Hazardous Materials/Waste (03/06/2024 - Maresh Eric DOD CIV - eric.g.maresh)

HAZARDOUS AND UNIVERSAL WASTE MANAGEMENT

The contractor must properly identify, accumulate, ship and dispose all hazardous and universal waste generated. All hazardous and universal waste identification, accumulation, shipping and disposal must abide with Federal, State and Department of Defense regulations as specified by:

• The Resource Conservation and Recovery Act (40 CFR 260-282) sets Federal standards for hazardous and universal waste management.

• CA Code of Regulations - Title 22 Social Security; Division 4.5 Environmental Health Standards for the Management of Hazardous Waste.

• Department of Defense rules and policies regarding hazardous and universal waste are summarized in the Beale Air Force Base Hazardous Waste Management Plan (available at the Beale AFB 9 CES/CEIE Environmental Office or at the following website: https://beale.eim.acc.af.mil/9rw/plans_programs/plans/9%20RW%20Plans%20Finalized/Forms/AllItems.aspx).

HAZARDOUS AND UNIVERSAL WASTE IDENTIFICATION

Proper identification of hazardous and universal waste is the responsibility of the contractor during all waste generation processes. The contractor is responsible for determining if a waste is hazardous or not hazardous by expediently complying with hazardous waste and universal identification regulations; Federal (40 CFR 261) and California State (CCR Title 22; Division 4.5; Chapter 11). Results from hazardous and non-hazardous waste identifications and determinations (analysis results and characterization documents) shall be shared with 9 CES/CEIE. Profile documents for hazardous and non-hazardous wastes shall be approved by 9 CES/CEIE. Chemical analysis of hazardous wastes must be performed by a California Department of Public Health Environmental Laboratory Accreditation Program certified laboratory.

Examples of processes which generally produce hazardous and universal wastes may include, but are not limited to: paint removal, media blasting, chemical waste removal, thinner activities, contaminated petroleum activities, demolition, battery removal, lamp removal, electronic waste removal, contaminated equipment/item removal, power transformer removal, treated wood removal and contaminated soil removal.

HAZARDOUS AND UNIVERSAL WASTE ACCUMULATION

Proper accumulation of hazardous and universal waste is the responsibility of the contractor. Accumulations of hazardous and universal waste shall be identified to 9 CES/CEIE within one day of the start of accumulation. Contractors must comply with hazardous and universal waste accumulation regulations; Federal (40 CFR 262, 273, 279) and California State (CCR Title 22; Division 4.5; Chapters 12, 23, 29, 32, 34, 42, 43). Storage (containers, tanks or other storage devices) and labeling of hazardous and universal wastes must be in accordance with 40 CFR 262; subpart C and CCR Title 22; Division 4.5; Chapters 12;

Article 3.

At completion of work, the contractor shall not leave hazardous wastes or non-waste chemicals at worksite. All non-waste chemicals shall be retained by the contractor at completion of work.

PCB CONTAMINATED HAZARDOUS WASTES (SUSPECTED OR KNOWN)

• Oil Filled Transformer Disposition - Any waste transformer or electrical equipment (switches, capacitors, etc) which contain insulating liquid shall be tested by the contractor for PCBs prior to disposition.

Results of PCB analysis shall be shared with 9 CES/CEIE. Equipment caps, covers, etc. must be properly secured to prevent spills. Leaking transformers and equipment must be immediately contained. 9 CES/CEIE must be notified immediately of leaking transformers or equipment. Sealed transformers or equipment may not need sampling if manufacturer data verifies PCB content (9 CES/CEIE shall concur with manufacturer data prior to disposal).

• Disposal of PCB contaminated ballasts - Ballasts without a “NO PCB” sticker must be assumed to be hazardous waste upon disposal. Manufacturer data may be used to prove non-presence of PCB’s for ballasts. All ballasts shall be separated as to “PCB” and “No PCB.”

ACCUMULATION AND DISPOSAL OF TREATED WOOD WASTE (TWW)

TWW must be identified, accumulated, labeled and stored according to California hazardous waste regulations (CCR Title 22; Division 4.5; Chapter 34). Accumulation locations and accumulation start dates for TWW must immediately be coordinated with 9 CES/CEIE. TWW accumulations must be properly labeled in accordance with California TWW regulations. Disposal of TWW must be coordinated with 9 CES/CEIE. Copies of landfill weight tickets must be sent to 9 CES/CEIE.

TWW must be stored off the exposed ground by placing it on blocks, on concrete surfaces or in containers. Do not store TWW beyond allowed limits (90 days – block and tarp, 180 days – containment pad, 1 year – container and storage building). Cover TWW during inclement weather to prevent rain water from leaching chemicals out of the TWW. Sawdust from cutting TWW must be collected and managed as TWW. Accumulate TWW away from public access. Contact 9 CES/CEIE if planning to reuse the removed TWW. Keep TWW from mixing with other waste. Label all TWW bundle/shipments with the following information.

TREATED WOOD WASTE – Do not burn or scavenge.

TWW Handler Name:________________________ Address:_______________________ Accumulation Date:_____________

HAZARDOUS AND NON-HAZARDOUS WASTE SHIPPING AND DISPOSAL (BEALE AFB)

All hazardous and non-hazardous waste shipments from Beale AFB must be coordinated through 9 CES/CEIE. These shipments include hazardous waste manifests, non-hazardous waste manifests and bill of lading waste shipments. The contractor shall submit a waste profile (identification document) to 9 CES/CEIE for all wastes generated, before removal from Beale AFB. At least two working days prior to transporting wastes from Beale AFB, the contractor shall make an appointment to deliver all hazardous waste manifests to 9 CES/CEIE for review. Hazardous and non-hazardous waste to be shipped off site about:blank 5/5 shall be inspected by 9 CES/CEIE before leaving Beale AFB. The contractor shall provide the properly completed shipping document to:

9 CES/CEIE

6425 B Street Beale AFB CA 95903-1708

EPA ID # CA7570024508

9 CES/CEIE shall sign all hazardous and non-hazardous waste shipping documents leaving Beale AFB.

AFCEC Restoration (03/07/2024 - Rector Darren DOD CIV - darren.w.rector)

1. Would the Project require CERCLA removals or similar actions under RCRA or other authorities?

2. Will there be any existing permits, new or modified permits, manifests, responsible authorities or agencies, contacts, etc., required as a result of implementing the Project for RCRA, CERCLA, TSCA or UIC regulations?

1. Would the Project require CERCLA removals or similar actions under RCRA or other authorities?

No.

2. Will there be any existing permits, new or modified permits, manifests, responsible authorities or agencies, contacts, etc., required as a result of implementing the Project for RCRA, CERCLA, TSCA or UIC regulations?

No.

Natural Resources (03/28/2024 - Gallentine Tamara DOD - tamara.a.gallentine)

1. Would the Project potentially impact caves, faults, geothermal vents, mineral resources or any other geologic feature? Negative

Cultural Resources (03/28/2024 - Gallentine Tamara DOD - tamara.a.gallentine)

1. Does the Project involve ground disturbance, construction, demolition or other effects that may impact significant historic buildings or structures, or does it create noise, dust, odors, light, or other disturbances to the existing cultural environment? Negative

2. Are the cultural areas of concern subject to potential impacts within the boundaries of the Project? Negative

3. Are there Memoranda of Agreement (MOA) or Programmatic Agreements (PA) in affect within the areas of concern? Negative

4. Will identified historic properties be potentially impacted by the Project? Negative

5. Are there any historic properties (i.e. archaeological sites or buildings/structures/districts eligible for the National Register) that may be impacted by the Project? Negative

Biological Resources (04/04/2024 - Gallentine Tamara DOD - tamara.a.gallentine)

1. Would the Project impact any plants or animals that are listed or candidates for threatened, unique, rare or endangered status?

No impact, If requirements below are adhered to.

2. Will there be any impacts from the construction of the Project on any types of critical, sensitive or unique habitats to include floodplains, wetlands, vernal pools, etc.?

No impact, If requirements below are adhered to.

3. Would there be any potential impacts to Threatened or Endangered species (TES) from implementing the Project’s construction, operation and/or maintenance activities?

No impact, If requirements below are adhered to.

4. Are there any surveyed federal- or state-listed TES within the Project’s region of influence?

Yes

Requirements:

This project is in the vicinity of sensitive, candidate, or listed species and/or their habitats.

Work must be conducted between 1 May and 1 Nov in dry soil conditions determined by the Biological Monitor.

Access to all manhole locations shall be with a vehicle maintained on the pavement/road shoulder except for the following locations:

MH-87: Biological monitor will need to flag access route prior to access. See attached map for access route due to unmapped wetlands in this general area. UTV use only for off pavement portion of route. A steel plate may be needed to cross the drainage/swale closest to the manhole needing repair, if it contains water at the time of work.

MH-P35: See attached maps for access route due to unmapped wetlands in this general area. UTV use only for off pavement portion of route. Note: This area is riddled with rodent/snake holes/pathways.

Weed eating may be done prior to access.

MH-439: See attached maps for access route. Use the old sidewalk for vehicle/equipment access. No wetlands in this work/access route area.

Demoed Bldg Area – See attached maps. This area has been re-sized to a smaller area due to unmapped wetlands.

If other manholes need off-road/UTV access, this will require Natural Resources assessment and approval.

Legal (04/16/2024 - Wright William M DOD - william.m.wright) The proposed action meets requirements.

I have reviewed the action along with the proposed CATEX (32 C.F.R. Part 989 subsection A2.3.9: Repairing and replacing real property installed equipment.) and find that this action is appropriate under this categorical exclusion. If you have any questions, please let me know.

Attachments:

411/412

Gavin Mandery

Demoed Bldg.

N

MH-312

MH-297

MH-66/69

MH-87

Warren shingle

P35

W8

Four Bridges

E17

Will need a steel plate if drainage contains water

From this point east, a UTV must be used to access the manhole

J

N

K

Warren Shingle

Unnamed

J

Unnamed

Warren Shingle

N

Unnamed

MH-87

0 200 400100 Feet

Yellow line is required access route.

Stay to route due to unmapped wetlands.

Warren Shingle

MH-439

0 50 10025 Feet

Access Route

5705 5706

Unnamed

Unnamed

MH-P35

0 100 20050 Feet

Access Route (watch for snakes in this area) Stay to route due to unmapped wetlands

F S tre et

E S tre et

5th Street

Gavin Mandery Drive

Beale AFB e103 000001

Map

0 160 320 480

Feet e103NO 000001 Beale Roads Beale Boundary

Underground Storage Tank Above Ground Storage Tanks

$1 Manhole Existing Electrical Pole

Water Features Deep Water Ditch Seep Stream Swale Vernal Pool Wetland

Map Created by CEMML 2023

Review Environmental Protection Measures before starting work.

Any questions may be directed to the Environmental Field Inspector at 530-913-5379. The only work allowed 12 hours before, during, or after a rain event is the installation and/or maintenance of erosion control measures.

*** Actions outside project boundaries have not been approved ***

1289378649C Cross-Out

Beale AFB Environmental Specifications

Beale AFB, CA 12-12-2023

Beale AFB, CA December 2023

Table of Contents - 1

Table of Contents

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 NOTIFICATION OF NON-COMPLIANCE

1.4 SUBCONTRACTORS

1.5 ENVIRONMENTAL PERMITS AND CERTIFICATIONS

1.6 ENVIRONMENTAL FINES AND PENALTIES

1.7 DEFINITIONS

1.7.1 Accumulation

1.7.2 Air Pollution

1.7.3 Bill of Lading

1.7.4 Conditionally Exempt Small Quantity Generator

1.7.5 Container

1.7.6 Characteristic Waste

1.7.7 Disposal

1.7.8 Disposal Facility

1.7.9 Disposal Site

1.7.10 Dust

1.7.11 Environmental Pollution

1.7.12 Excluded Hazardous Waste

1.7.13 Extremely Hazardous Waste

1.7.14 Generator or Producer

1.7.15 Hazardous Constituent

1.7.16 Hazardous Material (Hazmat)

1.7.17 HAZMART

1.7.18 Hazardous Waste (HW)

1.7.19 Incompatible Waste

1.7.20 Manifest

1.7.21 Natural Resources

1.7.22 Non-RCRA Hazardous Waste

1.7.23 Open Burning

1.7.24 Particulate Matter

1.7.25 Post-Consumer Material

1.7.26 Qualified Biologist

1.7.27 RCRA

1.7.28 RCRA Hazardous Waste

1.7.29 Recovered Material

1.7.30 Recyclability

1.7.31 Recyclable Material

1.7.32 Recycling

1.7.33 Residue

1.7.34 Satellite Accumulation

1.7.35 Solid Waste

1.7.36 Spill

1.7.37 Storage

1.7.38 Take

1.7.39 Tank

1.7.40 Treatment

1.7.41 Universal Waste

Table of Contents - 2

1.7.42 Vernal Pool

1.7.43 Waste Prevention

1.7.44 Wetlands

1.8 ENVIRONMENTAL MANAGEMENT SYSTEM (EMS)

1.8.1 References

1.8.2 Submittals

1.8.3 EMS Performance

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.1 GENERAL ENVIRONMENTAL REQUIREMENTS

3.1.1 Open Burning

3.1.2 Historical and Archeological Findings

3.1.3 Unidentified Materials

3.2 SOLID WASTE

3.2.1 References

3.2.2 Submittals

3.2.3 Management Procedures

3.3 HAZARDOUS MATERIALS (HAZMAT)

3.3.1 References

3.3.2 Submittals

3.3.3 Base HAZMART

3.3.4 Coordination Process for HAZMAT usage on Base

3.3.5 Tracking HAZMAT

3.3.6 Tracking Usage of HAZMAT

3.3.7 HAZMAT Storage

3.3.8 Best Management Practices (BMPs)

3.3.9 Spill Control and Clean Up

3.4 WASTEWATER AND STORM WATER POLLUTION PREVENTION

3.4.1 References

3.4.2 Submittals

3.4.3 Permits

3.4.4 Fees

3.4.5 Sites Requiring Site-Specific Construction Storm Water Permits 17

3.4.6 Sites Not Requiring Site-Specific Construction Storm Water

Permits

3.4.7 Water

3.4.8 Maintenance, Monitoring, and Inspections

3.4.9 Required Best Management Practices

3.5 PETROLEUM OIL AND LUBRICANT (POL)

3.5.1 References

3.5.2 Submittals

3.5.3 Management Procedures

3.6 NATURAL AND CULTURAL RESOURCES

3.6.1 References

3.6.2 Submittals

3.6.3 Land Use Controls

3.6.4 Project Site Access

3.6.5 Temporary Excavation and Embankments

3.6.6 Protection and Restoration of Landscape Features

3.6.7 Migratory Birds and Sensitive Plant and Animal Species

3.6.8 Natural Resource Conservation Measures and Best Management Practices

3.6.8.1 General Conservation

3.6.8.2 Wetland and Vernal Pool Conservation

Table of Contents - 3

3.6.9 Post Work Cleanup

3.6.10 Cultural Resources

3.7 AFFIRMATIVE PROCUREMENT

3.7.1 References

3.7.2 Submittals

3.7.3 Certification

3.8 HAZARDOUS AND NON-HAZARDOUS WASTE MANAGEMENT

3.8.1 References

3.8.2 Submittals

3.8.3 Management Procedures

3.8.4 Government Supplied Information

3.8.5 Scheduling

3.9 SOIL MANAGEMENT

3.9.1 References (RESERVED)

3.9.2 Submittals

3.9.3 Backfill

3.9.4 Stockpiling

3.9.5 Soil Characterization

3.9.6 Disposal

3.9.7 Dumping

3.10 AIR QUALITY

3.10.1 References

3.10.2 Submittals

3.10.3 Management Procedures

3.11 PESTICIDES

3.11.1 References

3.11.2 Submittals

3.11.3 Approval

3.11.4 Applicator Certification

3.11.5 Storage

3.11.6 Mixing

3.11.7 Usage Report

3.11.8 Disposal

3.12 RADIOACTIVE MATERIAL (RAM)

3.12.1 References (RESERVED)

3.12.2 Submittals

3.12.3 Permitted & Non-Permitted RAM Containing Items

3.12.4 Radiation Emitters

3.13 FLUORESCENT LIGHT TUBES AND HIGH INTENSITY DISCHARGE (HID) LAMPS . 60

3.13.1 References

3.13.2 Submittals

3.13.3 Management Procedures

3.14 SPILLS

3.14.1 References

3.14.2 Submittals

3.14.3 Management Procedures

3.15 ASBESTOS

3.15.1 References

3.15.2 Submittals

3.15.3 Management Procedures

3.16 LEAD BASED PAINT (LBP)

3.16.1 References

3.16.2 Submittals

3.16.3 Management Procedures

Table of Contents - 4

PART 4 ATTACHMENTS

Page - 1

ENVIRONMENTAL GENERAL REQUIREMENTS

PART 1 GENERAL

The work covered by this Section consists of performing all work required for environmental compliance, conservation and pollution prevention on Beale AFB during, and as a result of, construction or service contract operations under this contract. The control of environmental pollution requires consideration of the effects of the activities of the Contractor on air, water, and land resources and base wide facility, utility, and real property assets.

1.1 REFERENCES

The Contractor and all subcontractors shall comply with all applicable Federal, State, and local laws and regulations concerning environmental pollution prevention, control, and protection of resources, as well as Air Force, Department of Defense requirements and the specific requirements included or referenced under these environmental requirements or stated elsewhere in the contract specifications. Follow most current versions of all items. All Air Force and Beale specific plans, forms, and permits referenced herein are available upon request through the Contracting Officer.

1.2 SUBMITTALS

Submittal requirements for this section are outlined in specific subsections.

1.3 NOTIFICATION OF NON-COMPLIANCE

The Contractor, and all associated work areas under this contract, is subject to inspection by regulatory (Federal, state, and local), Air Force, and Beale AFB agencies/personnel. Upon receipt of non-compliance notification from the Contracting Officer, the Contractor shall immediately take corrective action as directed by the Contracting Officer.

1.4 SUBCONTRACTORS

The requirements of these specifications shall be included in any subcontract written under this contract. Compliance with the provisions of the specifications by subcontractors shall be the responsibility of the Contractor.

1.5 ENVIRONMENTAL PERMITS AND CERTIFICATIONS

The Contractor is responsible for obtaining all applicable environmental permits and certifications necessary to accomplish all work.

Requirements for specific permits and certifications are included in subsequent subsections.

Page - 2

1.6 ENVIRONMENTAL FINES AND PENALTIES

The Contractor agrees to indemnify the Government, its officers, agents, and employees against liability and costs associated with the intentional or negligent noncompliance of environmental laws, regulations, or requirements by the Contractor, its officers, agents, employees, or subcontractors to the extent such noncompliance arises out of the manufacture or delivery of supplies, services or construction by or for the account of the Government.

1.7 DEFINITIONS

1.7.1 Accumulation

The temporary holding of hazardous waste during waste generation activities for a specific limit of time past the accumulation start date.

1.7.2 Air Pollution

The generation and/or release to the atmosphere of one or more air contaminants, as defined in 40 CFR 50, in the outdoor atmosphere in excess quantities of regulatory thresholds, or for a duration of time, that is determined by the Contracting Officer or his authorized representative, to be injurious to human health or which unreasonably interferes with enjoyment of life or use of property.

1.7.3 Bill of Lading

A shipping document containing information required by DOT for commodities and hazardous materials.

1.7.4 Conditionally Exempt Small Quantity Generator

There are no conditionally exempt small quantity generators on Beale AFB. All hazardous waste, to include Contractor generated hazardous waste, must be properly handled, stored and disposed in accordance with the Beale AFB Hazardous Waste Management Plan.

1.7.5 Container

Title 22, Section 66260.10 defines a container as “any device that is open or closed, and portable in which a material can be stored, handled, treated, transported, recycled or disposed of.” Containers include portable tanks. Title 13, Section 1160.3(j) defines containers as any covered or uncovered receptacle to be used for transporting hazardous waste and having a capacity greater than 110 U.S. gallons (416.4 liters).

1.7.6 Characteristic Waste

Wastes are considered hazardous if containing one of the following characteristics: ignitable, corrosive, reactive or toxic. Note that California’s criteria for corrosive and toxic wastes are more inclusive than USEPA.

Page - 3

1.7.7 Disposal

Disposal is defined as the discharge, deposit, injection, dumping, spilling, leaking, or placing of any solid waste or hazardous waste into or on any land or water so that such solid waste or hazardous waste or any constituent thereof may enter the environment or be emitted into the air or discharged into the waters, including ground water.

1.7.8 Disposal Facility

A facility or part of a facility at which hazardous waste is intentionally placed into or on any land or water, and at which waste will remain after closure.

1.7.9 Disposal Site

The location where any final deposition of hazardous waste occurs.

1.7.10 Dust

Minute solid particles caused to be suspended by natural forces or by mechanical processes such as, but not limited to, the following operations: crushing, grinding, milling, drilling, demolishing, shoveling, conveying, covering, bagging, mixing, general vehicle operations and sweeping.

1.7.11 Environmental Pollution

The presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to man; or degrade the utility of the environment for aesthetic or recreational purposes.

1.7.12 Excluded Hazardous Waste

Any hazardous waste or mixture of hazardous wastes in which a significant percentage of the waste is recycled and reused at the same location the waste is originally generated. Excluded Recyclable Materials must be labeled and properly managed while being accumulated on site.

1.7.13 Extremely Hazardous Waste

The list of extremely hazardous wastes is provided in Title 22, CCR Section 66261.110.

1.7.14 Generator or Producer

Any person, by site, whose act or process produces hazardous waste, identified or listed in 40 CFR Part 261 or Chapter 11 of Title 22 CCR or whose act first causes a hazardous waste to become subject to regulation. Beale AFB is the generator for hazardous wastes generated on Base.

Page - 4

1.7.15 Hazardous Constituent

Hazardous constituent (a) constituent identified in Appendix VIII to Chapter 11 of CCR Section C; (b) any other element, chemical compound, or mixture of compounds which is a component of a hazardous waste or leachate and which has a physical or chemical property that causes the waste or leachate to be identified as a hazardous waste.

1.7.16 Hazardous Material (Hazmat)

Any substance defined by OSHA as a hazardous substance requiring a Safety Data Sheet, including, but not limited to, any chemicals, paints, adhesives, sealing compounds, strippers, glues, petroleum products, natural or synthetic gases, pesticides and all compounds containing hazardous substances.

1.7.17 HAZMART

The HAZMART is the central issuing, storing and tracking function for all hazardous materials stored or used on Beale AFB.

1.7.18 Hazardous Waste (HW)

A waste is hazardous if it is listed as a hazardous waste or exhibits one or more of the following characteristics as defined in 40 CFR Part 261 and Section 66261.3 of Title 22 CCR: Ignitability, Corrosivity, Reactivity and/or Toxicity.

1.7.19 Incompatible Waste

A hazardous waste which is unsuitable for (a) placement in a particular device or facility because it may cause corrosion or decay of containment materials (e.g. container inner liners or tank walls);

(b) commingling with another waste or material under uncontrolled conditions because the commingling might produce heat or pressure, fire or explosion, violent reaction, toxic dusts, mists, fumes, or gases.

1.7.20 Manifest

The shipping document, EPA Form 8700-22 (rev. March 2005), which is originated and signed by the generator in accordance with the instructions included in the appendix to Chapter 12 of Title 22 CCR.

1.7.21 Natural Resources

All plants, animals, water, soil and rocks, and ecosystems existing within the boundaries of Beale Air Force Base.

1.7.22 Non-RCRA Hazardous Waste

All hazardous waste regulated in the State of California pursuant to Title 22 CCR, Section 66261.101 excluding waste regulated by the Resource Conservation and Recovery Act (RCRA) as defined in 40 CFR 261.

Page - 5

1.7.23 Open Burning

Any outdoor fire from which the products of combustion are emitted directly into the open air without passing through a stack, chimney, or duct.

1.7.24 Particulate Matter

Any material, liquid or solid, other than water, which is suspended in air or other gases.

1.7.25 Post-Consumer Material

Any material or finished product that has served its intended use and has been discarded for disposal or recovery having completed its life as a consumer item.

1.7.26 Qualified Biologist

A qualified biologist has the training and education required to perform the prescribed task. For work on Beale AFB, a biologist must be approved by the Beale AFB Environmental Office and/or the United States Fish and Wildlife Service to be considered a qualified biologist

1.7.27 RCRA

Resource Conservation and Recovery Act (RCRA) is the federal statute used to regulate facilities that generate, treat, store, or dispose of hazardous waste.

1.7.28 RCRA Hazardous Waste

All RCRA hazardous wastes are identified in 40 CFR 261 and Title 22 CCR, Section 66261.100.

RCRA hazardous waste typically meets the characteristics of ignitability, corrosivity, reactivity, or toxicity; is a listed hazardous waste in CCR Article 4 and not excluded from 40 CFR Part 261, Subpart D by the USEPA pursuant to 40 CFR Sections 260.20 and 260.22; or is identified as a hazardous waste pursuant to Title 22 CCR Sections 66261.3 (a)(2)(B), 66261.3(a)(2)(D), 66261.3(a)(2)(B), or 66261.3(c)(2). A hazardous waste is presumed to be RCRA hazardous waste unless or until a generator determines that the waste is non- RCRA hazardous waste regulated under California law pursuant to Section 66261.101.

1.7.29 Recovered Material

Waste materials and by-products that have been recovered or diverted from solid waste, but not including those materials and by-products generated from, and commonly reused within, an original manufacturing process.

1.7.30 Recyclability

Ability of a product or material to be recovered from, or otherwise diverted from, the solid waste stream for the purpose of recycling.

Page - 6

1.7.31 Recyclable Material

A solid waste that is capable of being recycled, including, but not limited to, any of the following: (a) a residue; (b) a spent material, including but not limited to a used or spent stripping or plating solution or etchant; (c) material that is contaminated to such an extent that it can no longer be used for the purpose for which it was originally purchased or manufactured; (d) a byproduct listed in Section 66261.31 or Section 66261.32 Title 22 CCR; (c) any retrograde material that has not been used, distributed, nor reclaimed through treatment by the original manufacturer or owner by the later of the following dates: (1) one year after the date the material became a retrograde material; (2) if the material has been returned to the original manufacturer, one year after the material is returned to the original manufacturer.

Typical recyclable materials include, but are not limited to: aluminum cans, asphalt, books, ceiling tiles, construction debris, corrugated cardboard, copper tubing, magazines, newspapers, office paper, used oil, metal cans, plastic bottles, glass bottles, scrap metals, tires, wire/metal cable and wood pallets.

1.7.32 Recycling

The series of activities, including collection, separation and processing, by which products or other materials are recovered from the solid waste stream for use in the form of raw materials in the manufacture of new products other than fuel for producing heat or power by combustion.

1.7.33 Residue

The hazardous materials remaining in a packaging, including a tank car, after its contents have been unloaded to the maximum extent practicable and before the packaging is either refilled or cleaned of hazardous materials and purged to remove any hazardous vapors.

1.7.34 Satellite Accumulation

Under Federal and State Law, a generator may accumulate up to 55 gallons of hazardous waste (or one quart of acutely or extremely hazardous waste) without a permit at the initial point of accumulation for up to one year, provided specific requirements are met. Not considered storage, see Title 22, CCR, Sections 66262.34(e)(1)(B) and 66262.35.

1.7.35 Solid Waste

Solid Waste is any discarded material. While there are some regulatory exclusions in 40 CFR 261.4(a), if these materials exhibit any characteristic of hazardous wastes under Title 22 CCR, Division 4.4, Chapter 11, Article 3, they may be regulated as California non- RCRA hazardous wastes under 22 CCR § 66261.101(b)(2).

Thus, a Solid Waste is any material — liquid, gaseous or solid — that is deemed as waste because it is no longer needed, is excess, has

Page - 7 exceeded its shelf life, is spill residue, has been abandoned or is no longer usable for its intended purpose.

Solid waste also includes, but is not limited to: chemicals, contaminated clothing, empty containers, garbage, packaging, construction and demolition debris, refuse and all other discarded materials that are generated during construction, industrial, residential, and commercial activities.

1.7.36 Spill

Any unauthorized or unpermitted release of a hazardous material outside of the primary container. The spill could be due to human error, faulty equipment, failed containers, or natural mishap.

1.7.37 Storage

The containment of material, either for a temporary period or for a period of a year or potentially longer, in such a manner as not to constitute disposal or use of such material.

1.7.38 Take

To harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, collect, or attempt to engage in any such conduct (Endangered Species Act, 16 USC § 1531-1544). Harm further includes significant habitat modification or degradation that results in death or injury to listed species by significantly impairing essential behavioral patterns, including breeding, feeding, or sheltering. Take of a protected species could result in fines or work stoppages and individuals could be prosecuted, fined, and/or imprisoned.

1.7.39 Tank

A device designed to contain an accumulation of a substance which is constructed primarily of non-earthen materials (e.g., wood, concrete, steel, plastic) which provide structural support. A “portable tank” (without structural support, etc.) is defined as a container.

1.7.40 Treatment

Any method, technique, or process, including but not limited to, neutralization, filtration and dilution, designed to change the physical, chemical, or biological character or composition of any hazardous waste so as to render such waste non-hazardous, safer for transport, amenable for recovery, amenable for storage, or reduced in volume. This includes any activity or processing designed to change the physical form or chemical composition of hazardous waste to render it non-hazardous.

1.7.41 Universal Waste

Universal wastes are hazardous wastes that must be managed in compliance with the standards defined in 22 CCR, Division 4.5, Chapter 23 to avoid being managed under the stringent standards of other hazardous wastes. Examples of “universal” waste are:

a. Batteries (as described in 22 CCR § 66273.2)

Page - 8

b. Mercury switches and thermostats (§ 66273.4)

c. Lamps (§ 66273.5)

d. Aerosol cans

e. Electronic devices (§ 66273.3) and cathode ray tubes (§ 66273.6)

1.7.42 Vernal Pool

A vernal pool is a seasonal wetland that occurs in California’s grasslands where soils are poorly drained. These pools are full of water in the winter rainy season and dry up in the spring and remain dry throughout the summer and most of the fall. Vernal pools on Beale AFB are protected federal wetlands and harbor many rare species of plants and animals, some of which are protected under the Endangered Species Act. Vernal pools must not be disturbed and must be protected from unnatural run-on and contamination.

1.7.43 Waste Prevention

Any change in the design, manufacturing, purchase, or use of materials or products (including packaging) to reduce their amount or toxicity before they are discarded. Waste prevention also refers to the reuse of products or materials.

1.7.44 Wetlands

Those areas that are inundated or saturated by surface or ground water at a frequency and duration under normal circumstances sufficient to support, and that normally do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, vernal pools and similar areas.

1.8 ENVIRONMENTAL MANAGEMENT SYSTEM (EMS)

Beale AFB is committed to excellence in all aspects of environmental stewardship activities using the Air Force Environmental Management System (EMS). This commitment to, and use of, EMS applies to all activities, products and services associated with Beale AFB, partner units and contractors. Beale AFB is committed to compliance with applicable environmental laws, regulations, and policy; reducing risks to the mission; preventing pollution and continuously improving environmental performance. The Beale AFB goal is 100 percent compliance with all applicable federal, state, and local environmental requirements while sustaining our mission. Beale AFB will promote environmental quality throughout the mission by integrating and maintaining an effective EMS; protecting human health and the environment; incorporating environmental commitments to applicable policies and programs;

encouraging an environmental culture across all levels of management;

enhancing relations with regulatory agencies; partnering with all stakeholders to promote resource conservation and achieving continual improvement to environmental performance.

Page - 9

1.8.1 References

a. Beale AFB Environmental Policy

b. AFI 32-7001, Environmental Management

c. ISO 14001

1.8.2 Submittals

a. Written Conformance

1.8.3 EMS Performance

Contractors shall perform work in a manner that is consistent with Beale AFB EMS and conforms to all applicable environmental laws, regulations and policies. The Contractor will review and post the Beale EMS Environmental Policy Letter in the workplace. Policy letter is available at (https://www.beale.af.mil/Library/Units/Environmental- Information/). EMS training (one-time requirement) must be completed before start of work. The Contractor shall provide information to demonstrate written conformance with these requirements upon request (Submittal 1.8.2(a)).

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.1 GENERAL ENVIRONMENTAL REQUIREMENTS

3.1.1 Open Burning

The Contractor is prohibited from open burning on Beale AFB.

3.1.2 Historical and Archeological Findings

If the Contractor has a reasonable suspicion of a discovery of any item (bones, artifacts, structures, etc.) or area of historical or archaeological interest not specified in the contract during the completion of work, the Contractor shall leave the area undisturbed, render it safe for and from workers and the public, and immediately report the finding to the Cultural Resource Program Manager and Contracting Officer.

3.1.3 Unidentified Materials

3.1.3.1 Asbestos Containing Material (ACM)

If the Contractor believes they have discovered any ACM not…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .