This is a Salient Characteristics document outlining the specifications and requirements for a containerized high pressure nitrogen generator/compressor system to be delivered to Dyess Air Force Base for the Department of the Air Force Global Strike Command under solicitation FA466126Q0078.
The system must be either skid-mounted or trailer-mounted with a minimum flow rate of 26 scfm at 95.5% nitrogen purity and adjustable capacity. Technical specifications include a minimum storage pressure of 500 psig, discharge pressure of at least 400 psig, and 480VAC three-phase 60Hz power requirements. The unit must not exceed dimensions of 156" long by 78" wide by 74" tall and weigh no more than 5,000 pounds. The design shall incorporate an air compressor feeding nitrogen membranes connected to a nitrogen booster compressor with 900 scf on-board storage capacity, enabling continuous operation for a minimum of 24 hours without interruption. The contractor must complete preliminary testing and system tuning prior to delivery and conduct eight-hour acceptance testing at Simpro's facility to verify all production specifications are met without issue. Installation must be completed within 120 days and ready for testing, excluding delays related to payment, parts availability, and force majeure. The contractor shall provide electronic operational manuals including vendor-supplied documentation, onsite installation and setup at Dyess Air Force Base, a minimum of three days of onsite training by a system expert, and a minimum one-year warranty covering parts, workmanship, and performance of the installed equipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q and A For Nitrogne Generator 17 Sep (Amendment 3).docx | DOCX document | |
| Q and A For Nitrogne Generator 17 Sep.docx | DOCX document | |
| RFQ FA466126Q0078 - Nitrogen Generator 17 Sep 26.docx | DOCX document | |
| Attachment 1 Salient Characteristics - updated 17 Sep.docx | DOCX document | |
| Attachment 1 Generator Salient Characteristics.docx | DOCX document | |
| Attachment 2 FA466126Q0078 T C.pdf | ||
| RFQ FA466126Q0078 - Nitrogen Generator.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM
NUMBER
| Description |
| QUANTITY |
| UNIT |
| 0001 |
| Scope: |
Containerize high pressure nitrogen compressor system meeting the following specifications
| 1 |
| EA |
| 0001.1 |
| Skid Mounted or Trailer Mounted |
| 1 |
| EA |
| 0001.2 |
| This is the minimum Flow rate: 26 scfm @ 95.5% Nitrogen & be adjustable |
| 1 |
| EA |
| 0001.3 |
| Storage Pressure must meet a minimum 500psig |
| 1 |
| EA |
| 0001.4 |
| Discharge Pressure must be at a minimum of 400psig |
| 1 |
| EA |
| 0001.5 |
| Power: 480vac, 3ph, 60hz |
| 1 |
| EA |
| 0001.6 |
| Product must fit within the following Dimensions: 156” long x 78” wide x 74” tall |
| 1 |
| EA |
| 0001.7 |
| Weight: must not exceed 5,000 pounds |
| 1 |
| EA |
| 0001.8 |
| Design: Air Compressor feed to N2 Membranes to N2 Booster Compressor. Storage capacity @ 900 scf on board. |
| 1 |
| EA |
| 0001.9 |
| Self-generating nitrogen cart must be able to run sufficiently without any interruptions for a minimum of 24 hours |
| 1 |
| EA |
| 0002 |
| Testing: |
Unit acceptance testing will be operated for 8 hours meeting all production specifications without issue.
Preliminary testing will be required for system adjustments and tuning. Testing will be at Simpro’s facility.
Preliminary testing should be completed by the manufacture prior to arrival, this is required for system adjustments and fine tuning, prior to delivery.
Testing and acceptance by the unit will be conducted at the unit after setup and before training.
| 1 |
| EA |
| 0003 |
| Manuals and documentation: |
Manuals will be electronic versions, including operational manuals and manuals supplied by vendors. This will also include CD’s if the vendor supplied.
| 1 |
| EA |
| 0004 |
| Provide onsite installation within 120 days ready for testing, excluding payment delays, parts available, and force majeure. |
| 1 |
| EA |
| 0005 |
| Company will provide a system matter expert/trainer to complete onsite training for a minimum of 3 days at Dyess Air Force Base |
| 1 |
| EA |
| 0006 |
| Provide a minimum one-year warranty for parts, workmanship, and performance of onsite equipment at Dyess Air Force Base |
| 1 |
| EA |
File details come from the government source that posted it. Updated .