This document is a Standard Form 30 (SF-30) Amendment to a federal solicitation for a small business set-aside contract. The amendment (Amendment 0002) extends the proposal due date from August 6 to August 8, 2025, for a project at Fort Bliss involving electrical power installation for a portable Sensitive Compartmented Information Facility (SCIF). The project requires providing labor, personnel, supervision, management, tools, equipment, transportation, and materials to place electrical power at the El Paso portable SCIF, with the work to be completed in accordance with manufacturer standards, applicable US laws, and commercial practices.

The amendment removes previous language about site visit attendance invalidating proposals and adds three new photo attachments (Outside SCIF, QA Sheet dated 8-5-25, Rack 1, and Rack 2) to assist contractors with proposal preparation. The procurement is specifically structured as a 100% small business set-aside with a project value between $25,000 and $100,000, issued by the Department of the Air Force Global Strike Command for the 7 ASOS (Airborne Special Operations Squadron) at Fort Bliss, Texas.

View the file

Other files

File Type Posted
QA Sheet (8-5-25).xlsx XLSX spreadsheet
Outside SCIF.jpg JPG image
Rack 1.jpg JPG image
Rack 2.jpg JPG image
Solicitation Amendment 0001.pdf PDF
QA Sheet.docx DOCX document
TX20250245_WD_06-13-2025.pdf PDF
40ft Adjoined SCIF Drawings 1.03.24 REV.3.pdf PDF
2025 7ASOS Fac Power Data.pdf PDF
ASOS Site_2 .jpg JPG image
Solicitation - FA466125R0011.pdf PDF
7ASOS SOW Electrical_Communications_SCIF_2.pdf PDF
ASOS Site_1.jpg JPG image
ASOS Site_3.jpg JPG image
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

Created On:

05 Aug 2025, 14:49 PM Central Daylight Time

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section A - Solicitation/Contract Form

The following modifications were made:

Information From To

Contract Description

***The purpose of this Amendment is to remove the verbiage Offerors not in attendance will have their proposal declared as invalid during evaluation of proposals. The Site Visit is Optional and all offerors regardless of attendance to the Site visit will have valid proposals.***

The contractor shall provide all necessary labor, personnel, supervision, management, tools, equipment, transportation, materials and any other items necessary to provide and place electrical power at the Fort Bliss, El Paso portable SCIF in accordance with this statement of work, any attached appendices, manufacturer standards, applicable US laws, commercial standards and business practices.

This requirement is 100% small business set aside. The magnitude of this project falls within the range of $25,000 to $100,000, as defined in FAR 36.204(b).

***The purpose of this amendment is to extend the proposal due date from August 6 to August 8. This extension allows Contractors additional time to review the attached Questions and Answers and make any necessary revisions to their proposals. Additionally, three photos have been included with this amendment to further assist with proposal preparation.***

The contractor shall provide all necessary labor, personnel, supervision, management, tools, equipment, transportation, materials and any other items necessary to provide and place electrical power at the Fort Bliss, El Paso portable SCIF in accordance with this statement of work, any attached appendices, manufacturer standards, applicable US laws, commercial standards and business practices.

This requirement is 100% small business set aside. The magnitude of this project falls within the range of $25,000 to $100,000, as defined in FAR 36.204(b).

Section C - Description/Specifications/Statement of Work

The Requirements Text has been modified to:

***The purpose of this amendment is to extend the proposal due date from August 6 to August 8. This extension allows Contractors additional time to review the attached Questions and Answers and make any necessary revisions to their proposals. Additionally, three photos have been included with this amendment to further assist with proposal preparation.***

The contractor shall provide all necessary labor, personnel, supervision, management, tools, equipment, transportation, materials and any other items necessary to provide and place electrical power at the Fort Bliss, El Paso portable SCIF in accordance with this statement of work, any attached appendices, manufacturer standards, applicable US laws, commercial standards and business practices.

This requirement is 100% small business set aside. The magnitude of this project falls within the range of $25,000 to $100,000, as defined in FAR 36.204(b).

Section J - List of Attachments

The following Attachment(s) were added:

Outside SCIF QA Sheet (8-5-25) Rack 1 Rack 2

The following Attachment(s) were deleted:

Q&A Sheet

FA466125R00110002

SUMMARY OF CHANGES
Solicitation/Contract Form
Description/Specifications/Statement of Work
List of Attachments
IDCode: J
Page: 1
Pages: 2
AmendNo: 0002
EffDate: 29 Jul 2025
ReqNo:
ProjNo: 0001
IssCode: FA4661
AdmCode:
IssuedBy: FA4661 7 CONS CD

381 3RD ST, CP 325 696 2285

DYESS AFB, TX 79607-1581

UNITED STATES

MARSHAL KHINNO, Email: marshal.khinno@us.af.mil Telephone: 696-2353 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA466125R0011
SolDate: 18 Jul 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is to extend the proposal due date from August 6 to August 8. This extension allows Contractors additional time to review the attached Questions and Answers and make any necessary revisions to their proposals. Additionally, three photos have been included with this amendment to further assist with proposal preparation.
ContNameTitle:
CoNameTitle:
ContDate:
CODate: