JFSD260019 Bid Schedule.xlsx

XLSX spreadsheet 60 KB Posted

Attached to
Flooring Requirement Contract Solicitation
Solicitation number
FA465927Q0001
Issued by

About this file

This is a bid schedule template for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for flooring replacement and maintenance services at Grand Forks Air Force Base, North Dakota. The contract covers a five-year base period plus a six-month extension option, with pricing escalation set at 8% annually after the first year. The schedule itemizes labor, materials, and equipment costs across multiple flooring categories including demolition and disposal, carpet installation (modular and broadloom), luxury vinyl tile (LVT), rubber flooring, and resilient base/accessory installation. Line items specify unit quantities and pricing for each service type, with columns for unit prices with markup, material cost markups, and annual totals. All costs must include overhead, profit, and bid bond where applicable, with material pricing to be updated based on Air Force Commodities Contract rates.

The solicitation (FA465927Q0001) was issued by the 319th Contracting Squadron as a firm-fixed-price Requirements Contract and requests quotes by December 2, 2026 at 3:00 PM CST. Submissions must be sent electronically to SSgt Asante Nieves or Ms. Monique Padilla at the provided email addresses. The contract scope includes flooring verification, removal, patching, surface preparation, installation, debris disposal, and material furnishing in accordance with attached specifications. The current applicable wage determination applies, with updates prior to award or task order issuance taking precedence. Task order-specific costs for shipping, handling, storage, hazardous material testing, and additional floor preparation are identified separately and will be determined on a per-task-order basis.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDIQ QTY

JFSD260019 REPLACE FLOORING BASIC CONTRACT (IDIQ); BID SCHEDULE
Year 1Year 2Year 3Year 4Year 56-month Extension Year 5 pricing
Line Item and DescriptionUnitQuantityNTE CostMaterial Mark-Up %Unit Price w/ Mark-UpTotalQuantityNTE Cost*Unit Price w/ Mark-UpTotalQuantityNTE Cost*Unit Price w/ Mark-UpTotalQuantityNTE Cost*Unit Price w/ Mark-UpTotalQuantityNTE Cost*Unit Price w/ Mark-UpTotalQuantityUnit Price w/ Mark-UpTotal
Demolition and Disposal: (Includes all labor, equipment, staging, disposal, staff transportation, etc. Include Overhead and Profit)
AARemove and dispose of VCT (Non ACM)sy1500$0.001500$0.001500$0.001500$0.001500$0.00750$0.00$0.00
ABRemove and dispose of resilient flooring (Non ACM)sy100$0.00100$0.00100$0.00100$0.00100$0.0050$0.00$0.00
ACRemove and dispose of broadloom carpetsy2000$0.002000$0.002000$0.002000$0.002000$0.001000$0.00$0.00
ADRemove and dispose of modular carpetsy5000$0.005000$0.005000$0.005000$0.005000$0.002500$0.00$0.00
AERemove and dispose of resilient wall baself2500$0.002500$0.002500$0.002500$0.002500$0.001250$0.00$0.00
AFRemove and dispose of wood baself0$0.001000$0.000$0.001000$0.000$0.000$0.00$0.00
AGRemove and dispose of transition striplf100$0.00100$0.00100$0.00100$0.00100$0.0050$0.00$0.00
Carpet (CPT); FURNISH: (Material Only, Utilizing AF Carpet Program NTE Material Pricing. Include Contractor Overhead, Profit, & Bid Bond in Mark-Up; Exclude Shipping and Material Handling) - Prices to be updated when the new AF Commodities Contract prices are available.
BAModular Carpet A (Typical Tiles)sy4000$0.00$0.004000$0.00$0.00$0.004000$0.00$0.00$0.004000$0.00$0.00$0.004000$0.00$0.00$0.002000$0.00$0.00
BBModular Carpet B (Plank / Linear)sy4000$0.00$0.004000$0.00$0.00$0.004000$0.00$0.00$0.004000$0.00$0.00$0.004000$0.00$0.00$0.002000$0.00$0.00
BCModular Carpet C (Plain / Solid)sy500$0.00$0.00500$0.00$0.00$0.00500$0.00$0.00$0.00500$0.00$0.00$0.00500$0.00$0.00$0.00250$0.00$0.00
BDBroadloom with Standard Backingsy500$0.00$0.00500$0.00$0.00$0.00500$0.00$0.00$0.00500$0.00$0.00$0.00500$0.00$0.00$0.00250$0.00$0.00
BEModular Walk-Off Carpetsy50$0.00$0.0050$0.00$0.00$0.0050$0.00$0.00$0.0050$0.00$0.00$0.0050$0.00$0.00$0.0025$0.00$0.00
BFLow VOC Wet Adhesive; Modular Carpetpail100$0.00$0.00100$0.00$0.00$0.00100$0.00$0.00$0.00100$0.00$0.00$0.00100$0.00$0.00$0.0050$0.00$0.00
BGLow VOC Wet Adhesive; Broadloom Carpetpail14$0.00$0.0014$0.00$0.00$0.0014$0.00$0.00$0.0014$0.00$0.00$0.0014$0.00$0.00$0.007$0.00$0.00
Carpet (CPT); INSTALL: (Include all labor, equipment, staging, staff transportation, typical floor prep, bid bond, etc.; Include Overhead and Profit; Exclude Carpet and Adhesive Materials)
CAModular Carpet, Installsy7000$0.007000$0.007000$0.007000$0.007000$0.003500$0.00$0.00
CBBroadloom Carpet, Installsy500$0.00500$0.00500$0.00500$0.00500$0.00250$0.00$0.00
CCBroadloom Carpet on Stairs, Installsy15$0.0015$0.0015$0.0015$0.0015$0.008$0.00$0.00
CDWalk Off Carpet, Installsy50$0.0050$0.0050$0.0050$0.0050$0.0025$0.00$0.00
Carpet (CPT); FURNISH & INSTALL: (Include all materials, labor, equipment, adhesives, tools, typical prep, staff transportation, bid bond etc.; Include all Overhead and Profit; Exclude Shipping and Material Handling)
DAFloor surface sealantsy150$0.000$0.00150$0.000$0.00150$0.000$0.00$0.00
DBAdhesive for high moisture/PHpail0$0.002$0.000$0.002$0.000$0.000$0.00$0.00
Resilient Flooring, Luxury Vinyl Tile (LVT); FURNISH & INSTALL: (Include all materials, labor, equipment, adhesives, tools, typical prep, staff transportation, bid bond etc.; Include all Overhead and Profit; Exclude Shipping and Material Handling)
EALVT-01sf1350$0.00150$0.00150$0.00150$0.00150$0.0075$0.00$0.00
EBLVT-02sf2250$0.00250$0.00250$0.00250$0.00250$0.00125$0.00$0.00
ECLVT-03sf2250$0.00250$0.00250$0.00250$0.00250$0.00125$0.00$0.00
EDLVT-04sf1350$0.00150$0.00150$0.00150$0.00150$0.0075$0.00$0.00
Resilient Flooring, Rubber; FURNISH & INSTALL: (Include all materials, labor, equipment, adhesives, tools, typical prep, staff transportation, bid bond etc.; Include all Overhead and Profit; Exclude Shipping and Material Handling)
EERubber tilesf250$0.00250$0.00250$0.00250$0.00250$0.00125$0.00$0.00
EFRubber stair tread w/ nosinglf75$0.0075$0.0075$0.0075$0.0075$0.0038$0.00$0.00
EGRubber tread / riser units, w/ nosinglf75$0.0075$0.0075$0.0075$0.0075$0.0038$0.00$0.00
EHRubber stair riser or wall baself75$0.0075$0.0075$0.0075$0.0075$0.0038$0.00$0.00
Resilient Flooring Accessories; FURNISH & INSTALL: (Include all materials, labor, equipment, adhesives, tools, typical prep, staff transportation, bid bond etc.; Include all Overhead and Profit; Exclude Shipping and Material Handling)
EIResilient base: 4" covelf2500$0.002500$0.002500$0.002500$0.002500$0.001250$0.00$0.00
EJFurnish and install resilient base: 6" covelf500$0.00500$0.00500$0.00500$0.00500$0.00250$0.00$0.00
EKFurnish and install resilient base: 4" straightlf200$0.00200$0.00200$0.00200$0.00200$0.00100$0.00$0.00
ELFurnish and install resilient base: 6" straightlf100$0.00100$0.00100$0.00100$0.00100$0.0050$0.00$0.00
EMFurnish and install resilient transition striplf60$0.0060$0.0060$0.0060$0.0060$0.0030$0.00$0.00
ENFurnish and install resilient nosinglf30$0.0030$0.0030$0.0030$0.0030$0.0015$0.00$0.00
Yearly Totals (Material, Labor, OH&P):Year 1$0.00Year 2$0.00Year 3$0.00Year 4$0.00Year 5$0.006-month Extension$0.00
Overall Bid Total:$0.00
Task Order Specific Costs, Examples: (The below line item costs are subject to inclusion on future individual task orders, when applicable.)
FAShipping, ,Handling, Storage (Do not enter bid price)lot$0.00$0.00$0.00$0.00$0.00$0.00
FBHazardous Material Testing (Do not enter bid price)lot$0.00$0.00$0.00$0.00$0.00$0.00
FCAdditional Floor Prep (Do not enter bid price)$0.00$0.00$0.00$0.00$0.00$0.00
FD(TBD per task order)$0.00$0.00$0.00$0.00$0.00$0.00
FE(TBD per task order)$0.00$0.00$0.00$0.00$0.00$0.00

*Bidding Note: For bidding purposes, enter the first year NTE price of the selected carpet material from the AF Carpet Program, and apply 8% escalation to each year after the first.

&"MS Sans Serif,Bold"&18&KFF0000

File details come from the government source that posted it. Updated .