AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment to FA4659-16-R-0004, Repair 69 MXS Mission Areas Building 607, is to:
A. Add answ ers to questions received in response to the solicitation. (see attachment 1)
B. Change key notes 1 and 3 on sheet EY101 to clarify existing conditions. (see attachment 2)
C. Change specif ication section 01 11 00 to remove reference to government supplied equipment. (see attachment 3)
D. Proposal due date is not extended; remains 31 May 16 at 4:00 PM CDT
1. CONTRACT ID CODE PAGE OF PAGES
J 1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-May-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4659-16-R-0004
X 9B. DATED (SEE ITEM 11)
29-Apr-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-May-2016
CODE
319 CONTRACTING FLIGHT
575 TUSKEGEE AIRMEN BLVD
GRAND FORKS AFB ND 58205 6436
FA4659 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4659-16-R-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF DOCUMENTS, EXHIBITS
SECTION J
ITEM # of Pages
1. Schedule of Drawing 2
2. Technical Specification Table of contents 3
3. Building Wage Decision ND20160022 Dated 03/04/2016 5
4. Waiver Green Procurement Form 1
LIST OF EXTERNAL ATTACHMENTS
1. JFSD201312 Technical Specifications 458
2. JFSD201312 Drawings 51
3. JFSD201312 Material Submittal Schedule 4
4. Climatological Summary for Grand Forks AFB, ND 4
5. Financial Institution Reference Sheet 1
6. Past Performance Questionnaire 4
Schedule of Drawings
Ref Number Drawing Name Page Number Date
G-001 Cover Sheet 1 of 51 10/29/2015
G-002 Schedule of Drawings 2 of 51 10/29/2015
G-003 Abbreviations 3 of 51 10/29/2015
G-004 Abbreviations and Legend 4 of 51 10/29/2015
G-005 Egress and Occupancy Plans 5 of 51 10/29/2015
G-006 Fire Protection Plan 6 of 51 10/29/2015
C-101 Staging Plan and Enlarged Staging Plan 7 of 51 10/29/2015
AD101 Demolition Floor Plan 8 of 51 10/29/2015
A-101 Floor Plan 9 of 51 10/29/2015
A-102 Reflected Ceiling Plan and Details 10 of 51 10/29/2015
A-103 Roof Plan and Detail 11 of 51 10/29/2015
A-201 Interior Elevations, Casework, Sections and 12 of 51 10/29/2015
Partial East Exterior Elevation
A-601 Room Finish Schedule and Wall Types 13 of 51 10/29/2015
A-602 Door and Frame Schedule and Types 14 of 51 10/29/2015
A-603 Frame Details 15 of 51 10/29/2015
A-604 Frame Details 16 of 51 10/29/2015
I-101 Furniture Plan 17 of 51 10/29/2015
I-102 Finishes Plan 18 of 51 10/29/2015
FG101 Fire Protection Symbols Legend & General Notes 19 of 51 10/29/2015
FD101 Fire Protection Demolition Floor Plan 20 of 51 10/29/2015
FX101 Fire Protection Floor Plan 21 of 51 10/29/2015
FA101 Fire Alarm Floor Plan 22 of 51 10/29/2015
FA201 Fire Alarm Riser Diagram 23 of 51 10/29/2015
S-401 Enlarged Structural Floor and Foundation Plans 24 of 51 10/29/2015
S-402 Structural Frame Sections 25 of 51 10/29/2015
S-403 Structural Wall Section 26 of 51 10/29/2015
S-404 Structural Entry Canopy Section Looking West 27 of 51 10/29/2015
PG101 Plumbing General Notes, Details and Symbol 28 of 51 10/29/2015
Legend
PD101 Plumbing Demolition Floor Plan 29 of 51 10/29/2015
P-101 Plumbing Floor Plan 30 of 51 10/29/2015
P-201 Plumbing Risers and Fixture Schedules 31 of 51 10/29/2015
MG101 Mechanical General Notes and Symbols Legend 32 of 51 10/29/2015
MD101 Mechanical Demolition Floor Plan 33 of 51 10/29/2015
MD201 Mechanical Piping Demolition Floor Plan 34 of 51 10/29/2015
MH101 Mechanical Floor Plan 35 of 51 10/29/2015
MP101 Mechanical Piping Floor Plan 36 of 51 10/29/2015
M-401 Mechanical Controls 37 of 51 10/29/2015
M-402 Mechanical Controls 38 of 51 10/29/2015
M-501 Mechanical Details 39 of 51 10/29/2015
M-502 Mechanical Details 40 of 51 10/29/2015
M-601 Mechanical Schedules 41 of 51 10/29/2015
M-602 Mechanical Schedules 42 of 51 10/29/2015
EG101 Electrical General Notes and Symbols Legend 43 of 51 10/29/2015
ED101 Electrical Demolition Floor Plan 44 of 51 10/29/2015
EL101 Lighting Floor Plan 45 of 51 10/29/2015
EP101 Power Floor Plan 46 of 51 10/29/2015
EY101 Special Systems Floor Plan 47 of 51 05/17/2016
EY102 Special Systems Floor Plan & Details 48 of 51 10/29/2015
E-301 Enlarged Lighting Floor Plans 49 of 51 10/29/2015
E-401 Electrical Riser Diagrams & Schedules and 50 of 51 10/29/2015
Electrical Details
E-601 Electrical Schedules 51 of 51 10/29/2015
Technical Specification Table of contents
Division 0 – Procurement and Contracting Requirements
Technical Provisions 01000-00
Division 1 - General Requirements
Summary of The Work 01 11 00 REVISED 17 May 16
Coordination 01 14 00
Definitions and Standards 01 19 00
Testing Laboratory Services 01 40 00
Materials and Equipment 01 60 00
Division 2 – Existing Conditions
Building Demolition 02 41 00
Asbestos Removal and Disposal 02 82 14
Attachment: Asbestos and Lead-Based Paint Survey Report 25 Pages
Division 3 - Concrete
Concrete Formwork 03 10 00
Expansion and Contraction Joints 03 15 00
Concrete Reinforcement 03 20 00
Cast-In-Place Concrete 03 30 00
Non-Shrink Grout 03 36 00
Division 4 - Masonry
Unit Masonry 04 20 00
Division 5 - Metals
Metal Fabrications 05 50 00
Division 6 – Wood, Plastics and Composites
Rough Carpentry 06 10 00
Finish Carpentry 06 20 00
Wood Treatment 06 30 00
Architectural Casework 06 40 00
Division 7 - Thermal and Moisture Protection
Building Insulation 07 20 00
Flashing and Sheet Metal 07 60 00
Joint Sealers 07 92 00
Division 8 - Openings
Metal Doors and Frames 08 11 13
Aluminum Doors, Windows and Frames 08 11 16
Wood Doors 08 14 00
Access Doors 08 30 00
Hardware and Specialties 08 71 00
Glazing 08 81 00
Insulated Translucent Roof Panels 08 95 00
Division 9 – Finishes
Color Schedule 09 06 90
Gypsum Drywall 09 29 00
Acoustical Treatment 09 51 00
Resilient Flooring 09 65 00
Carpet 09 68 00
Wallcovering 09 72 00
Painting 09 90 00
Division 10 - Specialties
Visual Communications Specialties 10 10 00
Division 11 – Not Used
Division 12 - Blinds 12 51 00
Divisions 13 thru 20 – Not Used
Division 21 – Fire Suppression
Fire Protection General Provisions 21 00 00
Fire Protection 21 05 00
Division 22 – Plumbing
Plumbing Submittals 22 00 10
Basic Plumbing Materials and Methods 22 05 00
Plumbing Insulation 22 07 00
Plumbing Piping and Equipment 22 10 00
Plumbing Fixtures 22 40 00
Division 23 – Heating, Ventilating, and Air Conditioning
Mechanical General Provisions 23 00 00
Mechanical Submittals 23 00 10
Air Duct Cleaning 23 01 31
Basic HVAC Materials and Methods 23 05 00
Testing, Adjusting and Balancing 23 05 93
HVAC Insulation 23 07 00
Building Management and Control System 23 09 00
Variable Frequency Drives 23 09 33
Sequence of Operation 23 09 93
Hydronic Piping and Specialties 23 21 13
Hydronic Systems Treatment 23 25 00
Air Distribution 23 30 00
Air Handlers 23 73 13
HVAC Equipment 23 82 00
Divisions 24 & 25 – Not Used
Division 26 – Electrical
General Electrical 26 05 00
Wires and Cables 26 05 19
Grounding 26 05 26
Supporting Devices 26 05 29
Raceways 26 05 33
Electrical Boxes and Fittings 26 05 34
Electrical Identification 26 05 53
Transformers 26 22 13
Panelboards 26 24 16
Wiring Devices 26 27 26
Fuses 26 28 13
Circuit and Motor Disconnects 26 28 16
Motor Starters 26 29 13
Luminaires 26 51 13
Division 27 – Communications
Telecommunication Conduit Systems 27 05 28
Telecommunication Cabling Systems 27 10 10
Division 28 – Electronic Safety and Security Fire Alarm System – Existing 28 31 10
Divisions 29 and 30 – Not Used
Division 31 – Earthwork
Earthwork 31 10 00
Building Earthwork 31 10 10
Divisions 33 thru 49 – Not Used
General Decision Number: ND160022 03/04/2016 ND22
Superseded General Decision Number: ND20150022
State: North Dakota
Construction Type: Building
County: Grand Forks County in North Dakota.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least
$10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/08/2016
1 03/04/2016
BOIL0647-006 01/01/2014
Rates Fringes
BOILERMAKER......................$ 32.75 26.42
ELEC1426-007 06/01/2014
ELECTRICIAN......................$ 27.59 11.37
IRON0512-006 05/01/2015
IRONWORKER, STRUCTURAL...........$ 29.80 23.74
PLAS0633-003 05/01/2015
CEMENT MASON/CONCRETE FINISHER...$ 27.90 13.60
PLASTERER........................$ 23.92 12.83
* PLUM0300-020 01/04/2016
PIPEFITTER.......................$ 31.99 13.82
SHEE9010-002 06/09/2014
SHEET METAL WORKER (HVAC Duct
Installation Only)...............$ 26.45 13.95
SUND2012-003 08/18/2014
BRICKLAYER.......................$ 23.47 12.34
CARPENTER........................$ 19.16 3.88
DRYWALL FINISHER/TAPER...........$ 21.48 6.66
DRYWALL HANGER AND METAL STUD
INSTALLER........................$ 19.60 4.34
INSULATOR - MECHANICAL
(Duct, Pipe & Mechanical
System Insulation)...............$ 15.80 2.60
LABORER: Common or General......$ 12.99 2.81
LABORER: Mason Tender - Brick...$ 15.32 0.00
LABORER: Mason Tender -
Cement/Concrete..................$ 14.54 3.41
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 26.00 3.82
OPERATOR: Crane.................$ 26.18 9.39
OPERATOR: Forklift..............$ 23.06 15.47
OPERATOR: Loader................$ 23.75 0.00
PAINTER (BRUSH AND ROLLER),
Excludes Drywall
Finishing/Taping.................$ 21.86 8.41
PLUMBER..........................$ 21.64 4.98
ROOFER...........................$ 16.37 2.84
SHEET METAL WORKER, Excludes
HVAC Duct Installation...........$ 27.27 7.76
TRUCK DRIVER: Dump Truck........$ 19.81 5.42
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or
"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
WAIVER GREEN PROCUREMENT FORM
(Documentation of Non Purchases)
This form is to be utilized by the contractor to record non-purchases of Green Procurement
Products Listed on the EPA’s Web Site www.epa.gov/cpg/products.htm
ITEM:______________________________________________
I have determined that the following Affirmative Procurement Product was considered for purchase but will not be purchased for the following reasons:
Item is not available within a reasonable period of time.
Date Needed: _________________ Date Item would be available: _______________
Item fails to meet a performance standard in the specifications.
Specifically, Item Cost More than the Green Procurement Item.
Price of Green Procurement Item ________________________________________
Price of Non-Green Procurement Item ____________________________________
Contractor Name Contractor Signature Date
COR/Inspector Name COR/Inspector Signature Date
Contracting Officer Name Contracting Officer Signature Date http://www.epa.gov/cpg/products.htm
(End of Summary of Changes)