Attachment_3_-_SECTION_01_11_00.pdf

PDF 19 KB Posted

Attached to
Repair 69 MXS Mission Areas Bldg 607
Solicitation number
FA4659-16-R-0004
Issued by

About this file

Attachment 3 - Section 01 11 00

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UAS Repair 69 MXS Areas B607 01 11 00-1 156-021 Grand Forks AFB, ND JFSD201312 May 2016

DIVISION 1 – GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF THE WORK

PART 1 - GENERAL

1.1 WORK UNDER THIS CONTRACT

A. This includes all material, labor, tools, expendable equipment, utility and transportation services, and all incidental items necessary to perform and complete, in a workmanlike manner, the work required for the combined construction, including general, mechanical, and electrical work for the project as described in the Drawings and Project Manual.

1.2 WORK PERFORMED BY OTHERS

A. Contractor shall provide access for work to be performed by Others, and shall assist in coordinating their work schedule with the project schedule. Contractor shall ensure that any coordination required to allow Others to properly install their work takes place in a timely manner so as to not cause a problem with the schedule or sequence of construction.

B. Work to be performed under separate Contracts:

1. Appliance Contract for miscellaneous commercial and residential appliances (including furnishing and Setting in place of appliances; mechanical and electrical connections shall be included in this Combined Contract)

2. Furniture

3. Furnishings, fixtures and equipment (except as shown on the Drawings)

4. Signage

5. Vending machines

6. Trash receptacles

7. Recycling containers

8. Safes

9. Metal filing cabinets

10. Miscellaneous shelving and cabinets not specifically included as Educational Architectural

Casework on the Drawings

11. Televisions/monitors, DVD players and mounts

12. Government secure network equipment and cabling

13. Office supplies and equipment

14. Copy and fax machines

15. Shredders

16. Network and PC printers

17. Scanners

18. Computer system equipment

19. UPS systems and equipment

20. Communications racks

21. Fiber distributor centers

22. Security cameras, equipment, monitors, rough-in boxes, conduit and cabling/terminations

23. Security alarm system, rough-in boxes, conduit and cabling/terminations

24. Telephone system equipment (rough-in boxes, conduit and cabling/terminations included under this Combined Contract)

25. Technical and special equipment not specified hereinafter*

26. Other items noted on the Drawings or specified hereinafter*

* All wall-mounted items by Others require solid wood blocking in stud space to be installed as a part of this Combined Contract.

1.3 GOVERNMENT-FURNISHED/CONTRACTOR-INSTALLED (GFCI) ITEMS

A. Not used.

UAS Repair 69 MXS Areas B607 01 11 00-2 156-021 Grand Forks AFB, ND JFSD201312 May 2016

B. Items to be removed by the Contractor and reinstalled by him under this Contract are as noted in Sections 02 20 00 and 02 41 00.

C. Items to be removed by the Contractor but to remain the property of the Government or others are as noted in Sections 02 20 00 and 02 41 00.

D. Existing items to be removed or relocated by the Government are as noted in Sections 02 20 00 and 02 41 00.

1.4 VERIFICATION

A. Prior to commencement of work, verify all existing conditions, control points, principal lines and elevations, presence of underground utilities at or related to the site and existing building, and also examine all adjacent facilities upon which work is in any way dependent. In the event of any inconsistency or conflict between existing conditions and the bidding documents, immediate notice of such inconsistency or conflict shall be given to the Contracting Officer. Do not undertake any phase of the work affected by such inconsistency or conflict, pending the issuance of instructions by the Contracting Officer.

B. Elevations of existing grades, floors, tops of walls, roof edges, beams and locations of existing columns, walls and similar items are based on drawings of the existing building furnished by the Government. The Government assumes no responsibility for the accuracy of the information on existing drawings. It is the intent of the Contract Drawings to integrate new work with existing work, and the Contractor shall verify actual conditions.

1.5 PROTECTION

A. Provide protections necessary to prevent damage to existing buildings, finishes, improvements, landscaping and trees, parking, streets, walks, etc. to remain in place. Restore damaged buildings, finishes, improvements, etc. to their original conditions as acceptable to the Government.

END OF SECTION

File details come from the government source that posted it. Updated .