UAS RQ-4 REPAIR 69 MXS MISSION AREAS B607
GRAND FORKS AFB, ND JFSD201312 1 156-021
PROJECT NO.
JFSD
201312
APPROVED DISAPPROVED
1 Contractor Warranty. Sec. 01000 Para. 3.3 1 Within 30 days of NTP
2 Base CE Work Clearance Request. Sec. 01000, Para. 4.1 3 As Required
3 Welding Certification AF Form 592, Sec. 01000, Para. 6.1 3 Within 10 days of NTP
4 Project Site Plan. Sec. 01000, Para. 7.2.1 3 Within 10 days of NTP
5 Dirt and Dust Control Plan. Sec. 01000, Para. 7.2.2 3 Within 10 days of NTP
6 Contractor's Health and Safety Plan. Sec. 01000, Para. 7.2.3 3 Prior to start of any work
7 Site Superintendent/ Project Manager Designation Letter. Sec.
01000, Para. 10.1.2 3 -30 days of BO
8 Site Conditions Photographs. Sec. 01000, Para. 12.5 3 Beneficial
Occupancy (BO)
9 Critical Path Method (CPM) Network Schedule. Sec. 01000, Para. 12.6.1 3
NLT + 30 days
BO
10 Schedule Showing Procurement Plans for Materials and Equipment. Sec. 01000, Para. 12.6.2.1 3
NLT + 30 days
BO
11 As-Built Redline Markup Drawings Sect. 01000, Para. 12.8.1 1 NLT + 30 days
BO
12 Final As-Built Drawings. Sec. 01000, Para. 12.8.3 1 At Final
Inspection
13 Real Property Record - Form DD1354. Sec. 01000, Para. 12.9 1 NLT + 90 days
14 Environmental Pollution Control Plans. Sec. 01000, Para. 13.3.1 3 NLT + 90 days
15 Storm Water Protection Plan. Sec. 01000, Para. 13.5 3
16 Waste Disposal Plan. Sec. 01000, Para. 13.6 3
17 Hazardous Materials List, Sec. 01000, Para. 13.7 3
18 Spill Control Plan. Sec. 01000, Para. 13.8 3
19 Dust Control Plan. Sec. 01000, Para. 13.10 3
20 Contractor Quality Control Plan. Sec. 01000, Para. 14.4 3
21 O & M Manuals. Sec. 01000, Para. 16 1
23 SCHEDULE OF SUBMITTALS 3 01 30 00
24 BUILDING DEMOLITION 3 02 41 00
25 ASBESTOS REMOVAL AND DISPOSAL 3 1 02 82 14
26 CONCRETE REINFORCEMENT 3 03 20 00
27 CONCRETE MIX DESIGN 3 03 30 00
28 METAL FABRICATIONS 3 05 50 00
29 FINISH CARPENTRY 3 06 20 00
FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O
TH
E R
M A
TE
R
IA
L
O R
D
A
TA
S
E E
IN
D
IV
ID
U A
L S
P E
C S
E C
TI
O
N S
C O
LO
R
S E
LE
C
TI
O
N
M A
N U
FA
C
TU
R
E
'S
E
C O
M M
E N
D A
TI
O
N S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
C A
TA
LO
G D
A
TA
LI
N
E N
U M
B E
R
S A
M P
LE
S
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E A
N
C
LO
S
E O
U T
DATE CONTRACTOR NOTIFIED REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
O P
E R
A
TI
G
IN
S
TR
U C
TI
O
N
S DATE
TO
CIVIL
ENGR.
RETURN
SUSPENSE
DATE
S H
O P
D R
A W
IN
G
S
BEFORE CONSTR AFTER CONSTR
W A
R R
A N
TY
C
LO
S E
O U
T
SOLICITATION/CONTRACT NO.PROJECT TITLE
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
UAS RQ-4 REAPIR 69 MXS MISSION AREAS B607
GRAND FORKS AFB, NORTH DAKOTA
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
GRAND FORKS AFB, ND JFSD201312 2 156-021
PROJECT NO.
JFSD
201312
APPROVED DISAPPROVED
FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O
TH
E R
M A
TE
R
IA
L
TA
S
E E
IN
D
IV
ID
U A
L S
P E
C S
E C
TI
O
N S
C O
LO
R
S E
LE
C
TI
O
N
M A
N U
FA
C
TU
R
E
C O
M M
E N
D A
TI
O
N S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
C A
TA
LO
G D
A
TA
LI
N
E N
U M
B E
R
S A
M P
LE
S
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E A
S
E O
U T
DATE CONTRACTOR NOTIFIED REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
O P
E R
A
TI
TR
U C
TI
O
N
S DATE
TO
CIVIL
ENGR.
RETURN
SUSPENSE
DATE
S H
O P
D R
A W
IN
G
S
BEFORE CONSTR AFTER CONSTR
W A
R R
A N
TY
C
LO
S E
O U
T
SOLICITATION/CONTRACT NO.PROJECT TITLE
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
UAS RQ-4 REAPIR 69 MXS MISSION AREAS B607
GRAND FORKS AFB, NORTH DAKOTA
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
30 ARCHITECTURAL CASEWORK 3 3 3 06 40 00
31 BUILDING INSULATION 3 07 20 00
32 SHEET METAL FLASHING 3 3 3 3 1 07 60 00
33 JOINT SEALERS 3 3 3 07 92 00
34 METAL DOORS AND FRAMES 3 3 08 11 13
35 ALUMINUM DOORS, FRAMES AND WINDOWS 3 3 3 3 1 1 08 11 16
36 WOOD DOORS 3 3 3 1 08 14 00
37 ACCESS DOORS 3 08 30 00
38 HARDWARE 3 3 08 71 00
39 LAMINATED GLASS 3 1 1 08 81 00
40 INSULATED TRANSLUCENT ROOF PANELS 3 3 3 3 1 1 1 08 95 00
41 ACOUSTIC CEILING TILE AND GRID 3 3 1 09 51 00
42 RESILIENT FLOORING 3 3 09 65 00
43 CARPET 3 3 3 1 1 09 68 00
44 WALLCOVERING 3 3 1 09 72 00
45 PAINT AND STAIN 3 3 1 09 90 00
46 MARKERBOARDS 3 3 3 1 10 10 10
47 BLINDS 3 3 3 1 12 51 00
48 FIRE SPRINKLER PRODUCT DATA LAYOUT
DRAWINGS AND CALCULATIONS 3 3 3 1 1 1 1 21 05 00
49 PLUMBING METERS AND GAGES 3 3 3 22 05 00
50 PLUMBING VALVES AND SPECIALTIES 3 3 3 22 05 00
51 PLUMBING IDENTIFICATION 3 3 3 22 05 00
52 JOINT SEALANTS 3 3 3 22 05 00
53 PLUMBING HANGERS, SUPPORTS AND ACCESS
PANELS 3 3 3 22 05 00
54 PLUMBING PIPING AND EQUIPMENT 3 3 3 22 10 00
55 PLUMBING FIXTURES AND RECORD DRAWINGS 3 3 3 22 40 00
GRAND FORKS AFB, ND JFSD201312 3 156-021
PROJECT NO.
JFSD
201312
APPROVED DISAPPROVED
FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O
TH
E R
M A
TE
R
IA
L
TA
S
E E
IN
D
IV
ID
U A
L S
P E
C S
E C
TI
O
N S
C O
LO
R
S E
LE
C
TI
O
N
M A
N U
FA
C
TU
R
E
C O
M M
E N
D A
TI
O
N S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
C A
TA
LO
G D
A
TA
LI
N
E N
U M
B E
R
S A
M P
LE
S
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E A
S
E O
U T
DATE CONTRACTOR NOTIFIED REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
O P
E R
A
TI
TR
U C
TI
O
N
S DATE
TO
CIVIL
ENGR.
RETURN
SUSPENSE
DATE
S H
O P
D R
A W
IN
G
S
BEFORE CONSTR AFTER CONSTR
W A
R R
A N
TY
C
LO
S E
O U
T
SOLICITATION/CONTRACT NO.PROJECT TITLE
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
UAS RQ-4 REAPIR 69 MXS MISSION AREAS B607
GRAND FORKS AFB, NORTH DAKOTA
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
56 O & M MANUALS 1 23 00 00
57 RECORD DRAWINGS 1 23 00 00
58 MECHANICAL IDENTIFICATION 3 3 3 23 05 00
59 MECHANICAL VIBRATION CONTROL, ACCESS PANELS
AND JOINT SEALANTS 3 3 3 23 05 00
60 PIPE SUPPORTS & ANCHORS 3 3 3 23 05 00
61 PIPING VALVES, FITTINGS, METERS, GAUGES AND
SPECIALTIES 3 3 3 23 05 00
62 TEST & BALANCE REPORTS 3 3 1 23 05 93
63 HVAC INSULATION DATA SHEETS AND MATERIAL
SCHEDULE 3 3 3 23 07 00
ELECTRIC CONTROL AND FACILITIES MANAGEMENT
EQUIPMENT, INSTALLATION DRAWINGS AND
CONTROLS SEQUENCES
3 3 1 23 09 00
65 ELECTRIC CONTROL AND FACILITIES MANAGEMENT
OPERATION AND MAINTENANCE MANUALS 3 3 1 23 09 00
66 VARIABLE FREQUENCY DRIVES 3 3 3 23 09 33
HYDRONIC PIPING, SPECIALTIES, LAYOUT
DRAWINGS, SYSTEM TESTING AND SYSTEM
CLEANING
3 3 3 23 21 13
68 BRAZING CERTIFICATION 3 3 3 23 21 13
69 HYDRONIC SYSTEM TESTING AND CLEANING 3 3 3 23 25 00
70 GLYCOL SOLUTION AND CHEMICAL FEEDERS 3 3 3 23 25 00
71 DIFFUSERS, REGISTERS, GRILLES AND LOUVERS 3 3 3 23 30 00
72 AIR DISTRIBUTION DUCTWORK, DUCT LINER,
SPECIALTIES AND LAYOUT DRAWINGS 3 3 3 23 30 00
73 AIR FILTERS, DAMPERS, FIRE DAMPERS AND SMOKE
DAMPERS 3 3 3 23 30 00
74 AIR TERMINAL UNITS 3 3 3 23 30 00
75 FANS 3 3 3 23 34 00
76 AIR HANDLING UNITS 3 3 3 23 73 13
77 FAN COILS 3 3 3 23 82 00
78 PANELBOARDS 3 3 3 1 1 26 24 16
79 TRANSFORMERS 3 3 3 1 1 26 22 13
80 CONDUIT AND JUNCTION BOXES 3 3 3 1 26 05 33
GRAND FORKS AFB, ND JFSD201312 4 156-021
PROJECT NO.
JFSD
201312
APPROVED DISAPPROVED
FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O
TH
E R
M A
TE
R
IA
L
TA
S
E E
IN
D
IV
ID
U A
L S
P E
C S
E C
TI
O
N S
C O
LO
R
S E
LE
C
TI
O
N
M A
N U
FA
C
TU
R
E
C O
M M
E N
D A
TI
O
N S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
C A
TA
LO
G D
A
TA
LI
N
E N
U M
B E
R
S A
M P
LE
S
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E A
S
E O
U T
DATE CONTRACTOR NOTIFIED REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
O P
E R
A
TI
TR
U C
TI
O
N
S DATE
TO
CIVIL
ENGR.
RETURN
SUSPENSE
DATE
S H
O P
D R
A W
IN
G
S
BEFORE CONSTR AFTER CONSTR
W A
R R
A N
TY
C
LO
S E
O U
T
SOLICITATION/CONTRACT NO.PROJECT TITLE
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
UAS RQ-4 REAPIR 69 MXS MISSION AREAS B607
GRAND FORKS AFB, NORTH DAKOTA
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
81 JUNCTION BOXES 3 3 3 1 26 05 34
82 CONDUCTORS 3 3 3 1 26 05 19
83 WIRING DEVICES - SWITCHES, RECEPTACLES AND
DEVICE WALL PLATES 3 3 3 3 3 1 1 26 27 26
84 FUSES 3 3 3 1 1 26 28 13
85 INTERIOR LIGHTING FIXTURES 3 3 3 3 1 1 26 51 13
86 EXTERIOR LIGHTING FIXTURES 3 3 3 3 1 1 26 51 13
87 FIRE ALARM SYSTEMS 3 3 3 1 1 28 31 10
88 CIRCUIT AND MOTOR DISCONNECTS 3 3 3 1 1 26 28 16
89 MOTOR STARTERS 3 3 3 1 1 26 29 13
90 OCCUPANCY SENSORS 3 3 3 1 1 SEE LIGHTING PLANS
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
Sheet1
File details come from the government source that posted it. Updated .