08_JFSD_0607_AD101_Rev_25May16_-_Attachment_2.pdf
PDF 370 KB Posted
- Attached to
- Repair 69 MXS Mission Areas Bldg 607
- Solicitation number
- FA4659-16-R-0004
About this file
Attachment 2
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
330A
330E
C104
330C330D
330B
324A
344B
C110
C111
C108
C109
C107
240B 240A
E
G
D
C
B
A
1514131210
C1
C103
C105 C102
C100
C106
319J
319H
319I
319F
319E
319D
319A
319C
319B
319K
319G
R
R
R
R
R
R
R
R
R
R
R
R18
R
R
R
R
R
R
R
R10
TYP.
R10
TYP.
R10
TYP.
R
R
R
R03
TYP.
R04
TYP.
R
R13
R
R
R
R
R
R07
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
2 R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
TYP.
R
TYP.
R
R
R
R26
R
EXISTING
CEILING JBOX
ABOVE TO
REMAIN
R
R
R
R
R
R
DEMOLITION PLAN FLAG NOTES
AT THIS AREA MARKED WITH AN 'X', REMOVE 8" THICK x
CONCRETE SLAB AND +-2'-0" HIGH SUBGRADE DOWN TO
LEVEL OF ADJACENT MAIN FLOOR SUBGRADE.
REMOVE STONE FACING SHOWN BOLD AND DASHED AND
REMOVE STUD/GWB WALL ABOVE (12'-0" HIGH)
REMOVE 8" CMU WALLS SHOWN THUS FULL
HEIGHT TO STRUCTURE (+-17'-6".)
REMOVE STUD/GWB WALLS SHOWN THUS FULL
HEIGHT (+-9'-0".)
SAWCUT AND REMOVE 8" CMU WALL FULL-HEIGHT AS
REQUIRED FOR NEW OPENING AS SHOWN ON FLOOR PLAN.
REMOVE ROLLING DOOR AND HARDWARE COMPLETE,
INCLUDING BRACES, BRACKETS, BOLTS, ETC.
SAWCUT AND REMOVE CONCRETE SIDEWALK OR SLAB FOR
NEW FOUNDATION.
REMOVE CARPET AND ASBESTOS-CONTAINING MASTIC
UNDER CARPET AT HATCHED AREA
PER SPEC. SECTION 02 82 14.
REMOVE ASBESTOS-CONTAINING PIPE INSULATION AT MECH.
PIPING SHOWN WITH A BOLD, DASHED LINE AS REQUIRED TO
PERFORM THE WORK OF THIS PROJECT PER
SPEC. SECTION 02 82 14. SEE MECHANICAL.
WHITE/GRAY PAINT ON ROOF SUPPORT STRUCTURAL STEEL
COMPONENTS CONTAINS LEAD. SEE "LEAD-BASED PAINT
AWARENESS" NOTE ON SHEET G-001 FOR ADDITIONAL
INFORMATION.
GRAY PAINT ON THIS STEEL OPENING FRAME AND DOOR
CONTAINS LEAD. SEE "LEAD-BASED PAINT AWARENESS"
NOTE ON SHEET G-001 FOR ADDITIONAL INFORMATION.
REMOVE CARPET AND NON-ASBESTOS-CONTAINING VINYL
TILE UNDER CARPET AT STIPPLED AREA.
REMOVE CONCRETE PAD.
REMOVE SHEET METAL AND WOOD TRIM AT REMOVED
LOUVER.
REMOVE KICKPLATES AND PUSH/PULLS ON BOTH DOORS.
REMOVE FLOOR DRAIN. SEE SHEET PD101 FOR ADDITIONAL
REMOVAL INFORMATION.
REMOVE DISPLAY CASE COMPLETE.
SAWCUT AND REMOVE 8" CMU WALL SHOWN HATCHED FOR
NEW DOOR/FRAME. SEE DETAILS FOR NEW LINTEL
REQUIREMENTS.
REMOVE STUB/GWB COLUMN COVER AND
ASBESTOS-CONTAINING PIPE INSULATION; FULL HEIGHT
REMOVE DOOR AND HARDWARE; FRAME TO REMAIN.
REMOVE DOOR LOCKSET. DOOR AND FRAME TO REMAIN.
REMOVE FURRING AND GWB (FULL HEIGHT) SHOWN BOLD
AND DASHED.
REMOVE DOOR, FRAME AND HARDWARE COMPLETE.
REMOVE COLUMN COVER COMPLETE.
REMOVE WOOD STEPS COMPLETE.
REMOVE CASEWORK COMPLETE.
REMOVE CMU AS REQUIRED FOR CLEAN INSTALLATION OF
CANOPY TUBES.
REMOVE DISPLAY CASE. RETURN TO GOVERNMENT.
REMOVE FIRE EXTINGUISHER AND CABINET; SAVE FOR
REUSE IN THIS PROJECT.
SAWCUT AND REMOVE 8" CMU WALL SHOWN HATCHED FOR
DUCT. SEE MECHANICAL FOR SIZE.
PROVIDE STEEL ANGLE LINTEL FOR OPENING SIM TO DETAIL
1X/A-604.
REMOVE WOOD BASE FROM ALL SIDES OF THIS WALL
BUMP-OUT.
MAKE PENETRATIONS AND REMOVE AND REINSTALL ATC AS
REQUIRED FOR MECHANICAL WORK IN THIS AREA. SEE
MECHANICAL DRAWINGS FOR WORK LOCATIONS.
R01
GENERAL SHEET NOTES
1. REMOVE ALL ITEMS SHOWN BOLD AND DASHED COMPLETE UNLESS NOTED OTHERWISE.
2. REMOVE ALL SIGNAGE. RETURN TO GOVERNMENT.
R02
R03
R04
R05
R06
R07
NOTES
DEMOLITION ROOM FINISH SCHEDULE (REMOVE ALL MATERIALS NOTED.)
NO. DESCRIPTION FLOOR BASE
NORTH WALL EAST WALL SOUTH WALL WEST WALL CEILING
MAT. FIN. MAT. FIN. HEIGHTMAT. FIN. MAT. FIN. MAT. FIN.
ATC ACOUSTICAL TILE CEILING
CHR WOOD CHAIR RAIL
CPT CARPET
GWB GYPSUM WALLBOARD
WD WOOD
WDP WOOD PANELING
DEMOLITION ROOM FINISH SCHEDULE LEGEND
C102 CORRIDOR CPT
C105 CORRIDOR STONE
319 ADMINISTRATION CPT WD GWB GWB ATC 8'-6"
319A STORAGE CPT WD GWB GWB GWB GWB ATC 8'-6"
319B SIPR CPT WD GWB GWB GWB GWB ATC 8'-6"
319C RES. ADVISOR CPT WD GWB WDP WDP GWB WDP GWB WDP ATC 8'-6"
319D FIRST SERGEANT CPT WD GWB WDP WDP WDP WDP ATC 8'-6"
319E STORAGE CPT WD GWB GWB ATC 8'-6"
319F STORAGE CPT WD GWB GWB ATC 8'-6"
319G STORAGE CPT WD CMU CMU CMU ATC 8'-6"
319H STORAGE CPT WD GWB ATC 8'-6"
319I OFFICE CPT WD GWB WDP WDP GWB WDP GWB WDP ATC 8'-6"
319J CORRIDOR CPT WD GWB GWB ATC 8'-6"
319K OFFICE CPT WD GWB CHR CHR GWB CHR GWB CHR ATC 8'-6"
320 EMU OFFICE CPT WD GWB GWB GWB ATC 8'-6"
321 OFFICE CPT WD GWB GWB GWB GWB ATC 8'-6"
322 OFFICE CPT WD GWB GWB GWB ATC 8'-6"
323 BREAK ROOM CPT WD GWB GWB GWB ATC 8'-6"
324A ELECTRICAL GWB GWB
325 CONFERENCE CPT WD GWB WDP GWB WDP GWB WDP GWB WDP ATC 8'-6"
326 PROJECTION CPT WD GWB GWB GWB GWB ATC 8'-6"
327 TRAINING OFFICE CPT WD GWB GWB GWB GWB ATC 8'-6"
328 OFFICE CPT WD GWB GWB GWB GWB ATC 8'-6"
R08
R09
R10
R12
R13
R15
R16
R17
R18
R19
R11
R20
R21
R22
R23
R24
R25
R26
R27
R14
R28
R29
R30
R31
R32
R33
AD101
D E
M O
L I T
I O
N
F
L O
O R
P
L A
N
G R
A N
D
F
O R
K S
A
F B
N
D
C O
N T
R A
C T
S
E
L E
M E
N T
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
A B C
D E F G
Sheet of
NUMBER
REFERENCE
SHEET
A I
M
B
I L
I T
Y
C
O M
M A
N D
D E
P A
R T
M E
N T
T
H E
R
C E
D R
A W
I N
G
N
U M
B E
R
P L O
T
S
C A
L E
T
O
F
S
I Z
E
P L O
T
D
A T
E
C H
K
B
Y
D W
N
B
Y
D E
S I G
N E
D
B
Y
F I L
N
M
E
D A
T E
S y m b o l D e s c r i p t i o n D a t e
A p p r o v e d S y m b o l A p p r o v e d D a t e
D e s c r i p t i o n
O
C
G J H
G J H
K L M
O
I S
S U
D
B
D
O N
S T
R U
C T
I O
N
SCALE: 1/8" = 1'-0" 8' 4' 0 8'
DEMOLITION FLOOR PLAN
N
D e m o f o r
M e c h
P T
G M
S
File details come from the government source that posted it. Updated .