4_RPR North-South Water Bid Schedule - Rev. 22Jul26.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Horizontal Construction Multiple Award Contract (MAC)
Solicitation number
FA4626-26-R-0008
Issued by

About this file

This is a bid schedule for horizontal construction services related to the repair of the North/South Base Water System at Malmstrom Air Force Base, Montana. The schedule contains two primary line items: SLIN 0001AA covering repairs to the Cypress Drive & Locust Street plus 4th Avenue North area, and SLIN 0001AB as an option line item for repairs to the Cedar to Clinic area. Both sections are structured as lump-sum job contracts with multiple sub-components including mobilization, utility improvements, Type II pipe bedding, unlocated utility crossings, surface repairs, bore and jack operations, asbestos pipe removal and disposal, and bonding and taxes. The Cypress Drive area includes 1,250 cubic yards of Type II pipe bedding and 16 unlocated utility crossings, while the Cedar to Clinic area includes 362 cubic yards of Type II pipe bedding and 10 unlocated utility crossings. All unit prices and extended amounts are currently blank ($0), indicating this is a template for contractor pricing submission. The work encompasses water system repair, excavation, pipe installation, surface restoration including asphalt and concrete work, and environmental compliance with Montana, EPA, and OSHA standards for asbestos handling. This bid schedule supports the seed project under the Horizontal Construction Multiple Award Contract (MAC) at Malmstrom AFB with a total lifecycle cap of $25,000,000 and an initial five-year ordering period plus optional two-year extension under NAICS code 237990.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

ITEMSUB-ITEMDESCRIPTIONQUANTITYUNIT OF MEASUREUNIT PRICEEXTENDED AMOUNT
CLIN 0001Informational Only
SLIN 0001AARepair North/South Base Water System (Cypress Dr. & Locust St. + 4th Ave N Area)1Job$ - 0$ - 0
SLIN 0001ABOPTION LINE ITEM: Repair North/South Base Water System (Cedar to Clinic Area)1Job$ - 0$ - 0
TOTAL EVALUATED PRICE$ - 0

AUTHORIZED SIGNATURE:

TYPE NAME:

TITLE:

SLIN 0001AA

CYPRESS DR. & LOCUST ST. + 4TH AVE N

ITEMSUB-ITEMDESCRIPTIONQUANTITYUNIT OF MEASUREUNIT PRICEEXTENDED AMOUNT
CLIN 0001Informational Only
SLIN 0001AAMobilization: The cost of all insurance, permits, security processes, safety, fees, taxes, purchasing permits and licenses, utility location, shop drawings and samples, general administration and overhead, movement of equipment, tools, all work required for traffic control, quality control, storm water control, preparation of stormwater bypass plan, demobilization, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for Mobilization.1Job$ - 0$ - 0
SLIN 0001AAUtility Improvements: Payment shall include all costs for labor, materials, and equipment associated with excavation, Type 1 bedding and backfill, removal and disposal of old pipe, bedding, compaction, new pipe, new valves, couplings and fittings, connection to existing mains and services, removal and replacement of new fire and yard hydrant assemblies, cleaning and disinfection, pressure testing, utility line relocation, asphalt and concrete work, cleanup, and all other incidental items necessary to complete the work.1Job$ - 0$ - 0
SLIN 0001AAType II Pipe Bedding: All costs for Type II Pipe Bedding to replace soft or unsuitable material is measured in cubic yards of material furnished, in-place, for the depth directed. This bid item includes furnishing, placing, and compacting the Type II Bedding material as specified and all other work necessary or incidental to complete the item. Payment quantity is based upon an excavation width of 2.0 feet plus the outside pipe diameter with a minimum payment width of 3.5 feet. If Type II Bedding is placed without the Contracting Officer’s Representative’s authorization, the Type II Bedding is a construction expedient solely for the Contractor's convenience, and no payment is made.1250CY$ - 0$ - 0
SLIN 0001AAUnlocated Utility Crossings: All costs for Unlocated Utility Crossing by numerical count of utility lines that are discovered or damaged that are not shown on the plans or field located by the utility owner during construction which price and payment constitute full compensation for all time, equipment, and labor associated with crossing over or under; notification; standby and coordination that is related to the utility
line. If multiple utility lines are located within 3 feet horizontally, they will be paid as one item.16EA$ - 0$ - 0
SLIN 0001AASurface Repairs: All costs for labor, materials, and equipment for saw cutting (or equivalent); excavation, removal, and off-site disposal of existing surfacing; subgrade preparation and compaction; furnishing, installing, shaping, blading, compacting, and watering crushed gravel materials; furnishing and applying tack oil on adjacent vertical faces; furnishing, installing, hauling, placing, shaping and compacting asphaltic materials and
furnishing the paving mix design and samples of gravel and asphalt cement materials as necessary; Core and Marshall Testing; furnishing and installing expansion joint material; furnishing, installing, finishing and curing concrete and furnishing the concrete mix design as necessary for sidewalks and curb and gutter, concrete testing; furnishing and installing flowable fill material, includes existing vegetation excavation, haul and disposal; topsoil salvage and/or importing; topsoil placement; seed bed preparation; furnishing and installation of seed and sod complete in place; excavation and removal of existing gravel material; off-site disposal of existing gravel material , providing gravel landscaping to match existing surfacing; providing and installing landscape fabric, subgrade preparation and compaction; furnishing, installing, shaping, blading, and cleaning gravel materials; irrigation system repair, and all other work necessary or incidental to the item.1Job$ - 0$ - 0
SLIN 0001AABore & Jack: The item includes furnishing work plan and As-Recorded records; utility locating; exploratory hydrovac excavation; shoring; loading, haul and off-base disposal of excess excavated soil material; furnishing, installing and connecting the pipe; encasement, spacers, end caps, additional boring and pipe installation that is not full depth that is subsequently removed; furnishing all equipment, expendable materials and incidentals for jack and bore drilling, complete; backfill; compaction; cleanup and all other work necessary or incidental to complete the item.1Job$ - 0$ - 0
SLIN 0001AAAsbestos Pipe Removal and Disposal: Payment shall include all costs for labor, materials, and equipment for the removal, wrapping and legal disposal of all asbestos cement pipe in accordance with Montana, EPA and OSHA standards for such procedures, monitoring, and all other incidental items necessary to complete the work.1Job$ - 0$ - 0
SLIN 0001AABonding and Taxes1Job$ - 0$ - 0
TOTAL EVALUATED PRICE$ - 0

AUTHORIZED SIGNATURE:

TYPE NAME:

TITLE:

Option SLIN 0001AB

CEDAR TO CLINIC

ITEMSUB-ITEMDESCRIPTIONQUANTITYUNIT OF MEASUREUNIT PRICEEXTENDED AMOUNT
CLIN 0001Informational Only
SLIN 0001ABMobilization: The cost of all insurance, permits, security processes, safety, fees, taxes, purchasing permits and licenses, utility location, shop drawings and samples, general administration and overhead, movement of equipment, tools, all work required for traffic control, quality control, storm water control, preparation of stormwater bypass plan, demobilization, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for Mobilization.1Job$ - 0$ - 0
SLIN 0001ABUtility Improvements: Payment shall include all costs for labor, materials, and equipment associated with excavation, Type 1 bedding and backfill, removal and disposal of old pipe, bedding, compaction, new pipe, new valves, couplings and fittings, connection to existing mains and services, removal and replacement of new fire and yard hydrant assemblies, cleaning and disinfection, pressure testing, utility line relocation, asphalt and concrete work, cleanup, and all other incidental items necessary to complete the work.1Job$ - 0$ - 0
SLIN 0001ABType II Pipe Bedding: All costs for Type II Pipe Bedding to replace soft or unsuitable material is measured in cubic yards of material furnished, in-place, for the depth directed. This bid item includes furnishing, placing, and compacting the Type II Bedding material as specified and all other work necessary or incidental to complete the item. Payment quantity is based upon an excavation width of 2.0 feet plus the outside pipe diameter with a minimum payment width of 3.5 feet. If Type II Bedding is placed without the Contracting Officer’s Representative’s authorization, the Type II Bedding is a construction expedient solely for the Contractor's convenience, and no payment is made.362CY$ - 0$ - 0
SLIN 0001ABUnlocated Utility Crossings: All costs for Unlocated Utility Crossing by numerical count of utility lines that are discovered or damaged that are not shown on the plans or field located by the utility owner during construction which price and payment constitute full compensation for all time, equipment, and labor associated with crossing over or under; notification; standby and coordination that is related to the utility
line. If multiple utility lines are located within 3 feet horizontally, they will be paid as one item.10EA$ - 0$ - 0
SLIN 0001ABSurface Repairs: All costs for labor, materials, and equipment for saw cutting (or equivalent); excavation, removal, and off-site disposal of existing surfacing; subgrade preparation and compaction; furnishing, installing, shaping, blading, compacting, and watering crushed gravel materials; furnishing and applying tack oil on adjacent vertical faces; furnishing, installing, hauling, placing, shaping and compacting asphaltic materials and
furnishing the paving mix design and samples of gravel and asphalt cement materials as necessary; Core and Marshall Testing; furnishing and installing expansion joint material; furnishing, installing, finishing and curing concrete and furnishing the concrete mix design as necessary for sidewalks and curb and gutter, concrete testing; furnishing and installing flowable fill material, includes existing vegetation excavation, haul and disposal; topsoil salvage and/or importing; topsoil placement; seed bed preparation; furnishing and installation of seed and sod complete in place; excavation and removal of existing gravel material; off-site disposal of existing gravel material , providing gravel landscaping to match existing surfacing; providing and installing landscape fabric, subgrade preparation and compaction; furnishing, installing, shaping, blading, and cleaning gravel materials; irrigation system repair, and all other work necessary or incidental to the item.1Job$ - 0$ - 0
SLIN 0001ABAsbestos Pipe Removal and Disposal: Payment shall include all costs for labor, materials, and equipment for the removal, wrapping and legal disposal of all asbestos cement pipe in accordance with Montana, EPA and OSHA standards for such procedures, monitoring, and all other incidental items necessary to complete the work.1Job$ - 0$ - 0
SLIN 0001ABBonding and Taxes1Job$ - 0$ - 0
TOTAL EVALUATED PRICE$ - 0

AUTHORIZED SIGNATURE:

TYPE NAME:

TITLE: