This is a bid schedule for the Repair North/South Base Water System project at Malmstrom Air Force Base, Montana, part of a Horizontal Construction Multiple Award Contract (MAC). The schedule contains two main line items: SLIN 0001AA for repairs in the Cypress Drive and Locust Street plus 4th Avenue North area, and SLIN 0001AB as an optional line item for repairs in the Cedar to Clinic area.
SLIN 0001AA includes mobilization costs (insurance, permits, safety, traffic control, stormwater management, and demobilization); utility improvements covering excavation, pipe removal/replacement, hydrant assembly work, and testing; Type II pipe bedding measured at 1,250 cubic yards; 16 unlocated utility crossings; surface repairs including asphalt, concrete, and landscaping work; bore and jack operations; and bonding and taxes. SLIN 0001AB (optional) contains similar line items with the exception that Type II pipe bedding is reduced to 362 cubic yards and unlocated utility crossings total 10 each; the bore and jack operations are not included in this option. All unit prices and extended amounts are shown as zero dollars, indicating this is a template or informational bid schedule awaiting contractor pricing submission. Both sections require authorized signatures from the contracting parties. The schedule is formatted to allow contractors to insert unit prices and calculate extended amounts for the lump sum job items and measured quantity items.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| ITEM | SUB-ITEM | DESCRIPTION | QUANTITY | UNIT OF MEASURE | UNIT PRICE | EXTENDED AMOUNT |
| CLIN 0001 | Informational Only | |||||
| SLIN 0001AA | Repair North/South Base Water System (Cypress Dr. & Locust St. + 4th Ave N Area) | 1 | Job | $ - 0 | $ - 0 | |
| SLIN 0001AB | OPTION LINE ITEM: Repair North/South Base Water System (Cedar to Clinic Area) | 1 | Job | $ - 0 | $ - 0 | |
| TOTAL EVALUATED PRICE | $ - 0 |
AUTHORIZED SIGNATURE:
TYPE NAME:
TITLE:
SLIN 0001AA
CYPRESS DR. & LOCUST ST. + 4TH AVE N
| ITEM | SUB-ITEM | DESCRIPTION | QUANTITY | UNIT OF MEASURE | UNIT PRICE | EXTENDED AMOUNT | ||
| CLIN 0001 | Informational Only | |||||||
| SLIN 0001AA | Mobilization: The cost of all insurance, permits, security processes, safety, fees, taxes, purchasing permits and licenses, utility location, shop drawings and samples, general administration and overhead, movement of equipment, tools, all work required for traffic control, quality control, storm water control, preparation of stormwater bypass plan, demobilization, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for Mobilization. | 1 | Job | $ - 0 | $ - 0 | |||
| SLIN 0001AA | Utility Improvements: Payment shall include all costs for labor, materials, and equipment associated with excavation, Type 1 bedding and backfill, removal and disposal of old pipe, bedding, compaction, new pipe, new valves, couplings and fittings, connection to existing mains and services, removal and replacement of new fire and yard hydrant assemblies, cleaning and disinfection, pressure testing, utility line relocation, asphalt and concrete work, cleanup, and all other incidental items necessary to complete the work. | 1 | Job | $ - 0 | $ - 0 | |||
| SLIN 0001AA | Type II Pipe Bedding: All costs for Type II Pipe Bedding to replace soft or unsuitable material is measured in cubic yards of material furnished, in-place, for the depth directed. This bid item includes furnishing, placing, and compacting the Type II Bedding material as specified and all other work necessary or incidental to complete the item. Payment quantity is based upon an excavation width of 2.0 feet plus the outside pipe diameter with a minimum payment width of 3.5 feet. If Type II Bedding is placed without the Contracting Officer’s Representative’s authorization, the Type II Bedding is a construction expedient solely for the Contractor's convenience, and no payment is made. | 1250 | CY | $ - 0 | $ - 0 | |||
| SLIN 0001AA | Unlocated Utility Crossings: All costs for Unlocated Utility Crossing by numerical count of utility lines that are discovered or damaged that are not shown on the plans or field located by the utility owner during construction which price and payment constitute full compensation for all time, equipment, and labor associated with crossing over or under; notification; standby and coordination that is related to the utility | |||||||
| line. If multiple utility lines are located within 3 feet horizontally, they will be paid as one item. | 16 | EA | $ - 0 | $ - 0 | ||||
| SLIN 0001AA | Surface Repairs: All costs for labor, materials, and equipment for saw cutting (or equivalent); excavation, removal, and off-site disposal of existing surfacing; subgrade preparation and compaction; furnishing, installing, shaping, blading, compacting, and watering crushed gravel materials; furnishing and applying tack oil on adjacent vertical faces; furnishing, installing, hauling, placing, shaping and compacting asphaltic materials and | |||||||
| furnishing the paving mix design and samples of gravel and asphalt cement materials as necessary; Core and Marshall Testing; furnishing and installing expansion joint material; furnishing, installing, finishing and curing concrete and furnishing the concrete mix design as necessary for sidewalks and curb and gutter, concrete testing; furnishing and installing flowable fill material, includes existing vegetation excavation, haul and disposal; topsoil salvage and/or importing; topsoil placement; seed bed preparation; furnishing and installation of seed and sod complete in place; excavation and removal of existing gravel material; off-site disposal of existing gravel material , providing gravel landscaping to match existing surfacing; providing and installing landscape fabric, subgrade preparation and compaction; furnishing, installing, shaping, blading, and cleaning gravel materials; irrigation system repair, and all other work necessary or incidental to the item. | 1 | Job | $ - 0 | $ - 0 | ||||
| SLIN 0001AA | Bore & Jack: The item includes furnishing work plan and As-Recorded records; utility locating; exploratory hydrovac excavation; shoring; loading, haul and off-base disposal of excess excavated soil material; furnishing, installing and connecting the pipe; encasement, spacers, end caps, additional boring and pipe installation that is not full depth that is subsequently removed; furnishing all equipment, expendable materials and incidentals for jack and bore drilling, complete; backfill; compaction; cleanup and all other work necessary or incidental to complete the item. | 1 | Job | $ - 0 | $ - 0 | |||
| SLIN 0001AA | Bonding and Taxes | 1 | Job | $ - 0 | $ - 0 | |||
| TOTAL EVALUATED PRICE | $ - 0 |
AUTHORIZED SIGNATURE:
TYPE NAME:
TITLE:
Option SLIN 0001AB
CEDAR TO CLINIC
| ITEM | SUB-ITEM | DESCRIPTION | QUANTITY | UNIT OF MEASURE | UNIT PRICE | EXTENDED AMOUNT | ||
| CLIN 0001 | Informational Only | |||||||
| SLIN 0001AB | Mobilization: The cost of all insurance, permits, security processes, safety, fees, taxes, purchasing permits and licenses, utility location, shop drawings and samples, general administration and overhead, movement of equipment, tools, all work required for traffic control, quality control, storm water control, preparation of stormwater bypass plan, demobilization, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for Mobilization. | 1 | Job | $ - 0 | $ - 0 | |||
| SLIN 0001AB | Utility Improvements: Payment shall include all costs for labor, materials, and equipment associated with excavation, Type 1 bedding and backfill, removal and disposal of old pipe, bedding, compaction, new pipe, new valves, couplings and fittings, connection to existing mains and services, removal and replacement of new fire and yard hydrant assemblies, cleaning and disinfection, pressure testing, utility line relocation, asphalt and concrete work, cleanup, and all other incidental items necessary to complete the work. | 1 | Job | $ - 0 | $ - 0 | |||
| SLIN 0001AB | Type II Pipe Bedding: All costs for Type II Pipe Bedding to replace soft or unsuitable material is measured in cubic yards of material furnished, in-place, for the depth directed. This bid item includes furnishing, placing, and compacting the Type II Bedding material as specified and all other work necessary or incidental to complete the item. Payment quantity is based upon an excavation width of 2.0 feet plus the outside pipe diameter with a minimum payment width of 3.5 feet. If Type II Bedding is placed without the Contracting Officer’s Representative’s authorization, the Type II Bedding is a construction expedient solely for the Contractor's convenience, and no payment is made. | 362 | CY | $ - 0 | $ - 0 | |||
| SLIN 0001AB | Unlocated Utility Crossings: All costs for Unlocated Utility Crossing by numerical count of utility lines that are discovered or damaged that are not shown on the plans or field located by the utility owner during construction which price and payment constitute full compensation for all time, equipment, and labor associated with crossing over or under; notification; standby and coordination that is related to the utility | |||||||
| line. If multiple utility lines are located within 3 feet horizontally, they will be paid as one item. | 10 | EA | $ - 0 | $ - 0 | ||||
| SLIN 0001AB | Surface Repairs: All costs for labor, materials, and equipment for saw cutting (or equivalent); excavation, removal, and off-site disposal of existing surfacing; subgrade preparation and compaction; furnishing, installing, shaping, blading, compacting, and watering crushed gravel materials; furnishing and applying tack oil on adjacent vertical faces; furnishing, installing, hauling, placing, shaping and compacting asphaltic materials and | |||||||
| furnishing the paving mix design and samples of gravel and asphalt cement materials as necessary; Core and Marshall Testing; furnishing and installing expansion joint material; furnishing, installing, finishing and curing concrete and furnishing the concrete mix design as necessary for sidewalks and curb and gutter, concrete testing; furnishing and installing flowable fill material, includes existing vegetation excavation, haul and disposal; topsoil salvage and/or importing; topsoil placement; seed bed preparation; furnishing and installation of seed and sod complete in place; excavation and removal of existing gravel material; off-site disposal of existing gravel material , providing gravel landscaping to match existing surfacing; providing and installing landscape fabric, subgrade preparation and compaction; furnishing, installing, shaping, blading, and cleaning gravel materials; irrigation system repair, and all other work necessary or incidental to the item. | 1 | Job | $ - 0 | $ - 0 | ||||
| SLIN 0001AB | Bonding and Taxes | 1 | Job | $ - 0 | $ - 0 | |||
| TOTAL EVALUATED PRICE | $ - 0 |