6. Submittal Schedule.pdf
PDF 543 KB Posted
- Attached to
- Repair B1840 Roof
- Solicitation number
- FA462626R0006
About this file
This document is a Schedule of Materials Submittals for federal construction contract FA4626-26-R-0006 at Malmstrom Air Force Base, Montana, for the repair of Building 1840 Roof (Project NZAS 23-0059). The schedule establishes required contractor submissions across 105 line items organized by construction divisions, specifying submission deadlines, approval requirements, and document types.
The submittal schedule covers General Requirements (Division 01) including as-built documentation, O&M manuals, equipment lists, work notifications, quality control plans, and project schedules due within 5 to 30 days prior to start of work or prior to final inspection. Environmental and asbestos remediation submittals (Divisions 01 and 02) require certifications, work plans, safety plans, testing results, and training documentation within 2 to 10 days of various triggering events. Division 03 through 26 submittals address concrete repair, carpentry, thermal and moisture protection (roof recoating, flashing, counterflashing, gutters, sealants), HVAC systems (duct insulation, ducts, accessories, air outlets, identification), and electrical work (conductors, cables, hangers, raceways, deicing systems, identification). Submission timeframes range from 3 days after testing to 30 days prior to start of work. Each submittal line identifies required documentation type (product data, shop drawings, certifications, warranties, test reports), number of copies, and routing destination. The schedule uses abbreviations for timing (PTSW, ANP, ATT, PTFI, PPC) and recipient codes (PSW, ANP, PPC, AE, PTSW).
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MALMSTROM AFB, MONTANA
Solicitation/Contract No.
FA4626-26-R-0006
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
FA
C
T U
R E
R 'S
E C
O M
M E
N D
A T
IO
N
S
M A
N U
FA
C
T U
R E
W
A R
R A
N T
Y
C A
T A
L O
G D
A T
A
O
PE
R A
T
IN
G
ST
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
D
SU
B
M
IS
SI
O
N D
A T
(B Y
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
C
O N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
N
G
IN
E E
R
IN
G
R E
T U
R N
S U
SP
E
SE
T
E
SU
B
M
IT
T A
L N
U M
B E
R S
C O
N T
R A
C T
SU
B M
IT
T
L
FI
A L
A
PP
R O
V A
L
REMARKS
APPROVED
DIS-
APPROV
ED
1 DIVISION 01 - GENERAL REQUIREMENTS
2 01 00 00 General Requirements - 3.5.B As-Built Field Data 1 30d - AFI
3 01 00 00 General Requirements - 3.5.C.D & E. As-Built Field Drawings 1 30d - AFI AutoCAD CD
4 01 00 00 General Requirements - 3.7 O&M Instructions/Manual 1 2 1d - ATT 1 hardcopy, 2 CD's
5 01 00 00 General Requirements - 3.8 Equipment List & Guarantees 1 10d - PTFI
6 01 00 00 General Requirements - 3.11.A Start of Work Notification 1 5d - PTE
7 01 00 00 General Requirements - 3.12 Notice of Pre-Final and Final Inspection 1 7d - PTE Red line “As-Built” dwgs shall be provided by the Contractor at final inspection.
8 01 00 00 General Requirements - 3.13 AF Form 103 1 21d - PTSW AF Form 103 Work Clearance
9 01 00 00 General Requirements - 3.13.B Tape 1 30d -
PTSW
10 01 00 00 General Requirements - 3.14 Utility Outages 1 28d - PTE
11 01 00 00 General Requirements - 3.18 Quality Control Plan and Specified Quality Control Submittals
1 30d-PTSW
12 01 00 00 General Requirements - 3.19 Progress Schedule (bi-monthly) & Reports (every two weeks)
1 14d -ANP Project Schedule Form 3064 Progress Report Form 3065
13 01 00 00 General Requirements - 3.20 Checklist 1354 1 10d-PTFI Form 1354 Checklist
14 01 00 00 General Requirements - 3.22 Nuclear Densometers 1 30d -
PTSW
15 01 10 00 Site Security - 1.1 Contractor Entry Authorization List (CEAL) 1 30d -
PTSW WSA EAL
Number of Copies Required
NZAS 23-0059 Repair BLDG 1840 Roof
DATE CONTRACTOR
NOTIFIED
Project Number Project TitleSCHEDULE OF MATERIALS SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
AF Form 66 24-035_SUBMITTAL SCHEDULE.xlsx-10/8/2025
01330a-1
REQUIRED TECHNICAL SUBMITTALS
1166505506C Inserted Text
FA4626-26-R-0006
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
FA
C
T U
R E
C
O M
M E
N D
A T
IO
N
S
M A
N U
FA
C
T U
R E
R
R A
N T
Y
C A
T A
L O
G D
A T
A
O
PE
R A
T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
M
IS
SI
O
N D
A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
N
T R
A C
T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
SP
E
T
E
SU
B
M
IT
T A
L N
U M
B E
R S
C O
N T
R A
C T
SU
B M
IT
T
A L
A
PP
R O
V A
L
REMARKS
APPROVED
DIS-
APPROV
ED
Number of Copies Required
NZAS 23-0059 Repair BLDG 1840 Roof
DATE CONTRACTOR
NOTIFIED
Project Number Project TitleSCHEDULE OF MATERIALS SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
01 36 00 Environmental Protection - 2.0.C Copies of Environmental Permit/Plans
1 5d - AE
01 36 00 Environmental Protection - 8.2 EESOH-MIS Hazardous Material List (01 36 00 Attachment 2) 1 30d -
PTSW
01 36 00 Environmental Protection 11.2.2( 01 36 00 Attachment 1) Summary of Solid Waste Disposal and Diversion 1 10d - PTFI
01 36 00 Environmental Protection - 9.0 Actual Hazardous Material Used
1 10d - PTFI
DIVISION 02 - EXISTING CONDITIONS
22 02 82 00 Asbestos Remediation - 1.4A Certificates of Compliance 1 10d -
PTSW
23 02 82 00 Asbestos Remediation - 1.4B Asbestos Work Plan 1 1 10d -
PTSW
24 02 82 00 Asbestos Remediation - 1.4C Safety Plan / Safety Data Sheets 1 1 1 10d -
PTSW
25 02 82 00 Asbestos Remediation - 1.4D Testing Laboratory 1 1 1 10d -
PTSW
26 02 82 00 Asbestos Remediation - 1.4E Compentent Person 1 10d -
PTSW
27 02 82 00 Asbestos Remediation - 1.4F Area Monitoring Results 1 1 2d - ATT
28 02 82 00 Asbestos Remediation - 1.4G Notification and Policies 1 10d -
PTSW
29 02 82 00 Asbestos Remediation - 1.4H Landfill 1 10d -
PTSW
30 02 82 00 Asbestos Remediation - 1.4I Local Exhaust System 1 1 2d - ATT
AF Form 66 24-035_SUBMITTAL SCHEDULE.xlsx-10/8/2025
01330a-2
REQUIRED TECHNICAL SUBMITTALS
FA4626-26-R-0006
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
FA
C
T U
R E
C
O M
M E
N D
A T
IO
N
S
M A
N U
FA
C
T U
R E
R
R A
N T
Y
C A
T A
L O
G D
A T
A
O
PE
R A
T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
M
IS
SI
O
N D
A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
N
T R
A C
T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
SP
E
T
E
SU
B
M
IT
T A
L N
U M
B E
R S
C O
N T
R A
C T
SU
B M
IT
T
A L
A
PP
R O
V A
L
REMARKS
APPROVED
DIS-
APPROV
ED
Number of Copies Required
NZAS 23-0059 Repair BLDG 1840 Roof
DATE CONTRACTOR
NOTIFIED
Project Number Project TitleSCHEDULE OF MATERIALS SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
31 02 82 00 Asbestos Remediation - 1.4J Training 1 1 10d -
PTSW
32 02 82 00 Asbestos Remediation - 1.4K Permits 1 10d -
PTSW
33 02 82 00 Asbestos Remediation - 1.4L Schedule and Sequence 1 10d -
PTSW
34 02 82 00 Asbestos Remediation - 1.4M Glove Bag Training 1 1 10d -
PTSW
35 02 82 00 Asbestos Remediation - 1.4O Respirator Program 1 1 10d -
PTSW
36 02 82 00 Asbestos Remediation - 1.4P Personal Air Monitoring 1 1 2d - ATT
37 02 82 00 Asbestos Remediation - 1.4Q Disposal Site Records and Occupancy Permit 1 1 10d - PPC
38 02 82 00 Asbestos Remediation - 1.4R Certification of Work Completed 1 1 10d - PPC
40 DIVISION 03 - CONCRETE
41 03 01 30.71 Epoxy-injected Crack Repair - 1.05A Product Data / Safety Data Sheets 1 30d -
PTSW
42 03 01 30.71 Epoxy-injected Crack Repair - 1.06A Manufacturer's Warranty 1 30d -
PTSW
44 DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
45 06 10 00 Rough Carpentry - 1.4A Product Data 1 30d -
PTSW
AF Form 66 24-035_SUBMITTAL SCHEDULE.xlsx-10/8/2025
01330a-3
FA4626-26-R-0006
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
FA
C
T U
R E
C
O M
M E
N D
A T
IO
N
S
M A
N U
FA
C
T U
R E
R
R A
N T
Y
C A
T A
L O
G D
A T
A
O
PE
R A
T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
M
IS
SI
O
N D
A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
N
T R
A C
T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
SP
E
T
E
SU
B
M
IT
T A
L N
U M
B E
R S
C O
N T
R A
C T
SU
B M
IT
T
A L
A
PP
R O
V A
L
REMARKS
APPROVED
DIS-
APPROV
ED
Number of Copies Required
NZAS 23-0059 Repair BLDG 1840 Roof
DATE CONTRACTOR
NOTIFIED
Project Number Project TitleSCHEDULE OF MATERIALS SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
47 DIVISION 07 - THERMAL AND MOISTURE PROTECTION
48 07 01 50.61 - Roof Re-coating - 1.3A Manufacturer's Specification, Installation Instructions and General Information
1 30d -
PTSW
49 07 01 50.61 - Roof Re-coating - 1.3B Letter of Good Standing from Waterproofing Manufacturer
1 30d -
PTSW
50 07 01 50.61 - Roof Re-coating - 1.3C(1) Substrate Conditions 1 30d -
PTSW
51 07 01 50.61 - Roof Re-coating - 1.3D Warranty 1 30d-PTSW
52 07 62 00 - Sheet Metal Flashing and Trim - 1.2A Manufacturer Certificate of Compliance 1 30d -
PTSW
53 07 62 00 - Sheet metal flashing and trim - 1.2B Product data 1 30d -
PTSW
54 07 64 26 - Self-adhering Sheet Flashing - 1.3A Product Data 1 30d -
PTSW
55 07 64 26 - Self-adhering Sheet Flashing - 1.3B Samples 1 30d -
PTSW
56 07 64 26 - Self-adhering Sheet Flashing - 1.3C Installer Qualification 1 30d -
PTSW
57 07 64 26 - Self-adhering Sheet Flashing - 1.3D Warranty 1 30d -
PTSW
58 07 71 16 - Manufactured Counterflashing 1.3B - Product Data w/ Installation Instructions
1 30d -
PTSW
59 07 71 16 - Manufactured Counterflashing 1.3C - Shop Drawings 1 30d -
PTSW
60 07 71 16 - Manufactured counterflashing 1.3D - Samples 1 30d -
PTSW
AF Form 66 24-035_SUBMITTAL SCHEDULE.xlsx-10/8/2025
01330a-4
FA4626-26-R-0006
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
FA
C
T U
R E
C
O M
M E
N D
A T
IO
N
S
M A
N U
FA
C
T U
R E
R
R A
N T
Y
C A
T A
L O
G D
A T
A
O
PE
R A
T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
M
IS
SI
O
N D
A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
N
T R
A C
T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
SP
E
T
E
SU
B
M
IT
T A
L N
U M
B E
R S
C O
N T
R A
C T
SU
B M
IT
T
A L
A
PP
R O
V A
L
REMARKS
APPROVED
DIS-
APPROV
ED
Number of Copies Required
NZAS 23-0059 Repair BLDG 1840 Roof
DATE CONTRACTOR
NOTIFIED
Project Number Project TitleSCHEDULE OF MATERIALS SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
61 07 71 16 - Manufactured counterflashing 1.3E - Color samples 1 30d -
PTSW
62 07 71 16 - Manufactured counterflashing 1.3F - Manufacturer's Certification 1 30d -
PTSW
63 07 71 16 - Manufactured counterflashing 1.3G - Warranty 1 30d -
PTSW
64 07 71 16 - Manufactured Gutters - 1.4B - Product data w/ installation instructions 1 30d -
PTSW
65 07 71 23 - Manufactured Gutters - 1.4C - Shop drawings 1 30d -
PTSW
66 07 71 23 - Manufactured Gutters - 1.4D - Samples 1 30d -
PTSW
67 07 71 23 - Manufactured Gutters - 1.4E - Color samples 1 30d -
PTSW
68 07 71 23 - Manufactured Gutters - 1.4F - Manufacturer's Certification 1 30d -
PTSW
69 07 71 23 - Manufactured Gutters - 1.4G - Warranty 1 30d -
PTSW
70 07 92 13.1 Elastomeric Sealant for Concrete Joints - 1.05A - Product Data Sheets & Material Saftey Data Sheets
1 30d -
PTSW
71 07 92 13.1 Elastomeric Sealant for Concrete Joints - 1.05B - Warranty 1 30d -
PTSW
72 07 92 13.2 Elastomeric Joint Sealant - 1.05A - Product Data Sheets & Material Saftey Data Sheets
1 30d -
PTSW
73 07 92 13.2 Elastomeric Joint Sealant - 1.05B - Warranty 1 30d -
PTSW
75 DIVISION 23 - HVAC
AF Form 66 24-035_SUBMITTAL SCHEDULE.xlsx-10/8/2025
01330a-5
FA4626-26-R-0006
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
FA
C
T U
R E
C
O M
M E
N D
A T
IO
N
S
M A
N U
FA
C
T U
R E
R
R A
N T
Y
C A
T A
L O
G D
A T
A
O
PE
R A
T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
M
IS
SI
O
N D
A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
N
T R
A C
T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
SP
E
T
E
SU
B
M
IT
T A
L N
U M
B E
R S
C O
N T
R A
C T
SU
B M
IT
T
A L
A
PP
R O
V A
L
REMARKS
APPROVED
DIS-
APPROV
ED
Number of Copies Required
NZAS 23-0059 Repair BLDG 1840 Roof
DATE CONTRACTOR
NOTIFIED
Project Number Project TitleSCHEDULE OF MATERIALS SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
76 23 05 53 Identification for HVAC Piping and Equipment - 1.4A List 1 30D PSW
77 23 05 53 Identification for HVAC Piping and Equipment - 1.4B Chart and Schedule 1 30D PSW
78 23 05 53 Identification for HVAC Piping and Equipment - 1.4C Product Data 1 30D ANP
79 23 05 53 Identification for HVAC Piping and Equipment - 1.4D Manufacturer's Installation Instructions 1 30D ANP
80 23 05 53 Identification for HVAC Piping and Equipment - 1.4E Project Record Documents
1 30D PPC
AF Form 66 24-035_SUBMITTAL SCHEDULE.xlsx-10/8/2025
01330a-6
FA4626-26-R-0006
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
FA
C
T U
R E
C
O M
M E
N D
A T
IO
N
S
M A
N U
FA
C
T U
R E
R
R A
N T
Y
C A
T A
L O
G D
A T
A
O
PE
R A
T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
M
IS
SI
O
N D
A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
N
T R
A C
T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
SP
E
T
E
SU
B
M
IT
T A
L N
U M
B E
R S
C O
N T
R A
C T
SU
B M
IT
T
A L
A
PP
R O
V A
L
REMARKS
APPROVED
DIS-
APPROV
ED
Number of Copies Required
NZAS 23-0059 Repair BLDG 1840 Roof
DATE CONTRACTOR
NOTIFIED
Project Number Project TitleSCHEDULE OF MATERIALS SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
81 23 07 13 Duct Insulation - 1.3A Product Data 1 30D ANP
82 23 07 13 Duct Insulation - 1.3B Manufacturer's Instructions 1 30D ANP
83 23 31 00 - HVAC Ducts and Casings - 1.4A Product Data 1 30D ANP
84 23 31 00 - HVAC Ducts and Casings - 1.4B Shop Drawings 1 30D ANP
85 23 31 00 - HVAC Ducts and Casings - 1.4C Test Reports 1 7D ATT
86 23 31 00 HVAC Ducts and Casings - 1.4D Project Record Documents 1 30D ANP
87 23 33 00 Air Duct Accessories - 1.4A Product Data 1 30D ANP
88 23 33 00 Air Duct Accessories - 1.4B Shop Drawings 1 30D ANP
89 23 33 00 Air Duct Accessories - 1.4C Project Record Drawings 1 30D PPC
90 23 37 00 Air Outlets and Inlets - 1.3B Product Data 1 30D ANP
91 23 37 00 Air Outlets and Inlets - 1.3C Project Record Documents 1 30D PPC
93 DIVISION 26 - ELECTRICAL
94 26 00 00 General Provisions for Electrical Work - 1.2.A. Qualifications 1 30 D ANP
95 26 05 19 Low-Voltage Electrical Power Conductors and Cables - 1.3.A. Product Data 1 30 D ANP
AF Form 66 24-035_SUBMITTAL SCHEDULE.xlsx-10/8/2025
01330a-7
FA4626-26-R-0006
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
FA
C
T U
R E
C
O M
M E
N D
A T
IO
N
S
M A
N U
FA
C
T U
R E
R
R A
N T
Y
C A
T A
L O
G D
A T
A
O
PE
R A
T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
M
IS
SI
O
N D
A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
N
T R
A C
T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
SP
E
T
E
SU
B
M
IT
T A
L N
U M
B E
R S
C O
N T
R A
C T
SU
B M
IT
T
A L
A
PP
R O
V A
L
REMARKS
APPROVED
DIS-
APPROV
ED
Number of Copies Required
NZAS 23-0059 Repair BLDG 1840 Roof
DATE CONTRACTOR
NOTIFIED
Project Number Project TitleSCHEDULE OF MATERIALS SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
96 26 05 19 Low-Voltage Electrical Power Conductors and Cables - 1.4.A. Qualifications 1 30 D ANP
97 26 05 19 Low-Voltage Electrical Power Conductors and Cables - 1.4.B. Field Quality Control Test Reports
1 7 D
ATT
98 26 05 19 Low-Voltage Electrical Power Conductors and Cables - 3.7.C. Test Reports 1 3 D
ATT
99 26 05 20 Roof Gutter Deicing System - 1.3.A. Product Data 1 1 30 D ANP
100 26 05 29 Hangers and Supports for Electrical Systems - 1.4.A. Product Data 1 30 D ANP
101 26 05 29 Hangers and Supports for Electrical Systems - 1.4.B. Shop Drawings 1 30 D ANP
102 26 05 33 Raceways and Boxes for Electrical Systems - 1.4.A. Product Data 1 30 D ANP
103 26 05 33 Raceways and Boxes for Electrical Systems - 1.4.B. Shop Drawings 1 30 D ANP
104 26 05 53 Identification for Electrical Systems - 1.3.A. Product Data 1 30 D ANP
Schedule of Abbreviations:
AFI = After Final Inspection PTE= Prior to Event
ANP= After Notice to Proceed PTFI= Prior to Final Inspection
ATT= After Test Taken PTSW = Prior to Start of Work
BBCW= Before Beginning Concrete Work PPC = Prior to Project Completion
BD= Before Delivery
AF Form 66 24-035_SUBMITTAL SCHEDULE.xlsx-10/8/2025
01330a-8
Sheet1
File details come from the government source that posted it. Updated .