3. Structural.pdf
PDF 11 MB Posted
- Attached to
- Repair B1840 Roof
- Solicitation number
- FA462626R0006
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEWIS &
CLARK
GOLDEN
VALLEY
DEER
LODGE
SILVER
BOW
LINCOLN
FLATHEAD
GLACIER TOOLE LIBERTY HILL
BLAINE
PHILLIPS VALLEY
DANIELS SHERIDAN
ROOSEVELT
RICHLAND
McCONE
DAWSON
WIBAUX
FALLON
CARTER
POWDER
RIVER
CUSTER
PRAIRIE
GARFIELD
PETROLEUM
FERGUS
CHOUTEAU
PONDERA
TETON
LAKESANDERS
MINERAL
MISSOULA
CASCADE
JUDITH
BASIN
MUSSELSHELL ROSEBUD
WHEATLAND
SWEET
GRASS
BROADWATER
JEFFERSON
POWELL
GRANITE
RAVALLI
BEAVERHEAD
MADISON
GALLATIN
MEAGHER
YELLOWSTONE
STILLWATER
TREASURE
BIG HORN
CARBON
PARK
1. UNLESS SPECIFICALLY INDICATED BY NOTATION "NO SUBSTITUTES" THE EQUIPMENT FOR THIS PROJECT AS SCHEDULED ON THE DRAWINGS CONSTITUTES THE BASIS FOR DESIGN AND IS ELIGIBLE FOR SUBSTITUTION IN ACCORDANCE WITH THE PROVISIONS OF PROJECT
SPECIFICATIONS AND GENERAL CONDITIONS OF THE CONTRACT.
2. ALL CONSTRUCTION SHALL COMPLY WITH APPLICABLE CODES, ORDINANCES, STANDARDS AND REGULATIONS.
3. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, ETC., AND NOTIFY THE CONTRACTING OFFICER OF ANY AND
ALL DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK.
4. ALL WORK SHALL BE APPLIED AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S LATEST SPECIFICATIONS OR REQUIREMENTS.
5. MAINTAIN CLEAR ACCESS WAYS FOR CONTINUAL OPERATION AND EMERGENCY EGRESS. COORDINATE TRAFFIC DISRUPTIONS AND ROAD
BLOCKAGES WITH MALMSTROM AFB.
6. COORDINATE DOWNTIME OF ALL EQUIPMENT AND SYSTEMS IN ADVANCE WITH THE CONTRACTING OFFICER. MAKE PRIOR ARRANGEMENTS WHEN WORK INVOLVES ACCESS INTO OCCUPIED AREAS. HOLD ALL DOWNTIMES TO AN ABSOLUTE MINIMUM AND PROVIDE TEMPORARY CONNECTIONS, REROUTING, TIE-INS, ETC., AS NECESSARY TO MAINTAIN FUNCTIONS REQUIRED FOR THE FACILITY'S NORMAL OPERATION.
7. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF THE OCCUPANTS AND WORKERS AT ALL TIMES.
8. THE CONTRACTOR IS RESPONSIBLE FOR SECURITY IN THOSE AREAS ASSOCIATED WITH THIS WORK.
9. THE CONTRACTOR SHALL MINIMIZE DISRUPTIONS TO OCCUPIED AREAS DUE TO NOISE, ODOR, SMOKE, VIBRATIONS, ETC. COMMON AREAS
SHALL BE KEPT FREE OF DUST, DEBRIS, CONSTRUCTION MATERIALS, ETC., AT ALL TIMES.
10. THE CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL HOLES OR DAMAGE ENCOUNTERED IN WORK DONE BY HIMSELF OR ANY OTHER
TRADE OR CONTRACTOR.
11. ALL SURFACES IN REMODELED AREAS DAMAGED DURING REMODELING OR CONSTRUCTION PROCESSES ARE TO BE PATCHED FLUSH WITH
EXISTING. MATCH EXISTING ADJACENT FINISH, OR APPLY NEW FINISH AS NOTED.
12. TAKE CARE NOT TO DAMAGE ANY OF THE BASE'S PROPERTY, FINISHED SURFACES, PRODUCTS, FURNISHINGS OR OTHER MATERIALS. ANY AND ALL ITEMS DAMAGED SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE GOVERNMENT AT NO EXPENSE TO THE
GOVERNMENT.
13. OBTAIN AF 103 WORK CLEARANCE REQUEST FORM, ALL PERMIT SIGNATURES AND UTILITY LOCATES PRIOR TO EXCAVATION. ALL UNDERGROUND UTILITIES SHOWN ARE REPRESENTATIVE ONLY. THE CONTRACTOR SHALL OBTAIN A DIGGING PERMIT FROM MALMSTROM AFB AND SHALL BE RESPONSIBLE FOR SECURING THE LOCATION OF ALL UTILITIES BEFORE BEGINNING EXCAVATION. THE CONTRACTOR
SHALL REMOVE ALL UTILITY FLAGS AFTER EXCAVATION OF THAT PORTION IS COMPLETE.
14. AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER.
15. ALL CONTRACTORS PERFORMING THE WORK ENCLOSED IN THIS PLANS SET SHALL BE SOLELY RESPONSIBLE FOR THE COORDINATION OF
THIS WORK BETWEEN ALL DISCIPLINES.
16. THIS FACILITY IS LOCATED IN THE WEAPONS STORAGE AREA OF THE BASE, THEREFORE ACCESS TO THE PROJECT SITE IS LIMITED.
REFERENCE DIVISION 1 SPECIFICATIONS FOR DETAILED ACCOUNTING OF ACCESS REQUIREMENTS TO COMPLY WITH.
17. THE FACILITY ITSELF IS ALSO SECURE AND ALARMED/MONITORED 24H/7D/365D, AND THE CONTRACTOR SHALL TAKE THAT WORK OPENING THE ENVELOPE OF THE BUILDING AT THE ROOF WILL REQUIRE CAREFUL COORDINATION WITH THE GOVERNMENT. REFERENCE DIVISION 1
SPECIFICATION REQUIREMENTS FOR COORDINATION NOTICE TO THE CONTRACTING OFFICER.
18. RESTRICTED AREA ACCESS: ACCESS TO PORTIONS OF THE ROOF WILL BE RESTRICTED AT CERTAIN TIMES DUE TO OPERATIONS WITHIN THE FACILITY. CONSTRUCTION PERSONNEL MUST REMAIN WITHIN THE DESIGNATED CONSTRUCTION LIMITS AT ALL TIMES, AS DETERMINED BY THE GOVERNMENT, AND MUST NOT ENTER INTO OR ABOVE RESTRICTED AREAS. MOVEMENT OUTSIDE APPROVED WORK ZONES IS PROHIBITED UNLESS AUTHORIZED AND ESCORTED BY GOVERNMENT PERSONNEL. VIOLATIONS OF THIS REQUIREMENT MAY RESULT IN IMMEDIATE REMOVAL FROM THE PROJECT SITE. REGULARLY OCCURRING PROJECT SCHEDULE MEETINGS WILL BE HELD IN ORDER TO
COORDINATE WORK AREAS AND RESTRICTED AREAS.
GLOBAL STRIKE COMMAND
MALMSTROM AIR FORCE BASE, MONTANA
NF
N
SE
OIS LA
IGNE
N
OR
P
M
O AT
EE
AN
R
AutoCAD SHX Text
PROJECT SITE BUILDING 1840
AutoCAD SHX Text
PROJECT LOCATION MALMSTROM AFB, MT
AutoCAD SHX Text G E N E R A L N O T E S
AutoCAD SHX Text
REPAIR BLDG 1840 ROOF
AutoCAD SHX Text
ITEMS SHOWN BOLD AND SOLID ARE NEW
AutoCAD SHX Text
ITEMS SHOWN LIGHT ARE EXISTING AND TO REMAIN
AutoCAD SHX Text
ITEMS SHOWN BOLD AND DASHED ARE TO BE REMOVED
AutoCAD SHX Text L I N E W E I G H T S
AutoCAD SHX Text
NZAS 23-0059
AutoCAD SHX Text
MALMSTROM AIR FORCE BASE, MONTANA
AutoCAD SHX Text L O C A T I O N M A P
AutoCAD SHX Text M A L M S T R O M A. F. B. , M T.
AutoCAD SHX Text V I C I N I T Y M A P
AutoCAD SHX Text I N D E X O F D R A W I N G S
AutoCAD SHX Text
ATTACHMENT:
AutoCAD SHX Text
FA4626-XX-X-XXXX
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
APPR'D
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
REVIEWED BY
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PLATE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
OF
AutoCAD SHX Text
PROJECT NUMBERS
AutoCAD SHX Text
ACAD DRAWING NUMBER
AutoCAD SHX Text
RECORD FILE NUMBER
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
AutoCAD SHX Text
NZAS 23-0059
AutoCAD SHX Text
REPAIR BLDG 1840 ROOF
AutoCAD SHX Text 10/09/25
AutoCAD SHX Text
RRB
AutoCAD SHX Text
RRB
AutoCAD SHX Text
RLT
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text
15168 PE
AutoCAD SHX Text
BLAKE
AutoCAD SHX Text
RODNEY R.
AutoCAD SHX Text
AutoCAD SHX Text G0.0
GLOBAL STRIKE COMMAND
MALMSTROM AIR FORCE BASE, MONTANA
NF
N
SE
OIS LA
IGNE
N
OR
P
M
O AT
EE
AN
R
GENERAL NOTES MATERIALS
SHOP DRAWINGS
DEFERRED SUBMITTALS
DEMOLITION
WOOD
S1.0
LEGEND AND ABBREVIATIONS
AutoCAD SHX Text
ATTACHMENT:
AutoCAD SHX Text
FA4626-XX-X-XXXX
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
APPR'D
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
REVIEWED BY
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PLATE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
OF
AutoCAD SHX Text
PROJECT NUMBERS
AutoCAD SHX Text
ACAD DRAWING NUMBER
AutoCAD SHX Text
RECORD FILE NUMBER
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
AutoCAD SHX Text
NZAS 23-0059
AutoCAD SHX Text
REPAIR BLDG 1840 ROOF
AutoCAD SHX Text 10/09/25
AutoCAD SHX Text
RRB
AutoCAD SHX Text
RRB
AutoCAD SHX Text
RLT
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text
15168 PE
AutoCAD SHX Text
BLAKE
AutoCAD SHX Text
RODNEY R.
AutoCAD SHX Text
GENERAL STRUCTURAL NOTES
AutoCAD SHX Text
AutoCAD SHX Text 24-035-S10
AutoCAD SHX Text S1.0
AutoCAD SHX Text CODES & STANDARDS - IN EFFECT AT THE 35% DESIGN STAGE - IN EFFECT AT THE 35% DESIGN STAGE 1. INTERNATIONAL BUILDING CODE - 2021 IBC INTERNATIONAL BUILDING CODE - 2021 IBC 2. AMERICAN SOCIETY OF CIVIL ENGINEERS - ASCE 7-16 AMERICAN SOCIETY OF CIVIL ENGINEERS - ASCE 7-16 3. AMERICAN INSTITUTE OF STEEL CONSTRUCTION - AISC 360-16 AMERICAN INSTITUTE OF STEEL CONSTRUCTION - AISC 360-16 4. UNITED FACILITIES CRITERIA (UFC) 1-200-01 DoD BUILDING CODE, WITH CHANGE 3 UNITED FACILITIES CRITERIA (UFC) 1-200-01 DoD BUILDING CODE, WITH CHANGE 3 FACILITIES CRITERIA (UFC) 1-200-01 DoD BUILDING CODE, WITH CHANGE 3 FACILITIES CRITERIA (UFC) 1-200-01 DoD BUILDING CODE, WITH CHANGE 3 CRITERIA (UFC) 1-200-01 DoD BUILDING CODE, WITH CHANGE 3 CRITERIA (UFC) 1-200-01 DoD BUILDING CODE, WITH CHANGE 3 (UFC) 1-200-01 DoD BUILDING CODE, WITH CHANGE 3 (UFC) 1-200-01 DoD BUILDING CODE, WITH CHANGE 3 1-200-01 DoD BUILDING CODE, WITH CHANGE 3 1-200-01 DoD BUILDING CODE, WITH CHANGE 3 DoD BUILDING CODE, WITH CHANGE 3 DoD BUILDING CODE, WITH CHANGE 3 BUILDING CODE, WITH CHANGE 3 BUILDING CODE, WITH CHANGE 3 CODE, WITH CHANGE 3 CODE, WITH CHANGE 3 WITH CHANGE 3 WITH CHANGE 3 CHANGE 3 CHANGE 3 3 3 (GENERAL BUILDING REQUIREMENTS), 09-01-2022. 5. UFC 3-301-01 STRUCTURAL ENGINEERING, WITH CHANGE 1, 04-11-2023. UFC 3-301-01 STRUCTURAL ENGINEERING, WITH CHANGE 1, 04-11-2023. 6. UFC 4-010-01 DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, WITH CHANGE 2, UFC 4-010-01 DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, WITH CHANGE 2, 4-010-01 DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, WITH CHANGE 2, 4-010-01 DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, WITH CHANGE 2, DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, WITH CHANGE 2, DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, WITH CHANGE 2, MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, WITH CHANGE 2, MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, WITH CHANGE 2, ANTITERRORISM STANDARDS FOR BUILDINGS, WITH CHANGE 2, ANTITERRORISM STANDARDS FOR BUILDINGS, WITH CHANGE 2, STANDARDS FOR BUILDINGS, WITH CHANGE 2, STANDARDS FOR BUILDINGS, WITH CHANGE 2, FOR BUILDINGS, WITH CHANGE 2, FOR BUILDINGS, WITH CHANGE 2, BUILDINGS, WITH CHANGE 2, BUILDINGS, WITH CHANGE 2, WITH CHANGE 2, WITH CHANGE 2, CHANGE 2, CHANGE 2, 2, 2, 12-12-2018. 7. ASTM STANDARDS FOR THE MATERIALS SPECIFIED. ASTM STANDARDS FOR THE MATERIALS SPECIFIED. DESIGN & STRUCTURAL CRITERIA 1. PROJECT LOCATION/LOCAL JURISDICTION: MALMSTROM AIR FORCE BASE, GREAT FALLS, MT PROJECT LOCATION/LOCAL JURISDICTION: MALMSTROM AIR FORCE BASE, GREAT FALLS, MT 2. RISK CATEGORY: CATEGORY III - FOR DETERMINATION OF LOADING, IMPORTANCE & OTHER RISK CATEGORY: CATEGORY III - FOR DETERMINATION OF LOADING, IMPORTANCE & OTHER CATEGORY: CATEGORY III - FOR DETERMINATION OF LOADING, IMPORTANCE & OTHER CATEGORY: CATEGORY III - FOR DETERMINATION OF LOADING, IMPORTANCE & OTHER CATEGORY III - FOR DETERMINATION OF LOADING, IMPORTANCE & OTHER CATEGORY III - FOR DETERMINATION OF LOADING, IMPORTANCE & OTHER III - FOR DETERMINATION OF LOADING, IMPORTANCE & OTHER III - FOR DETERMINATION OF LOADING, IMPORTANCE & OTHER - FOR DETERMINATION OF LOADING, IMPORTANCE & OTHER - FOR DETERMINATION OF LOADING, IMPORTANCE & OTHER FOR DETERMINATION OF LOADING, IMPORTANCE & OTHER FOR DETERMINATION OF LOADING, IMPORTANCE & OTHER DETERMINATION OF LOADING, IMPORTANCE & OTHER DETERMINATION OF LOADING, IMPORTANCE & OTHER OF LOADING, IMPORTANCE & OTHER OF LOADING, IMPORTANCE & OTHER LOADING, IMPORTANCE & OTHER LOADING, IMPORTANCE & OTHER IMPORTANCE & OTHER IMPORTANCE & OTHER & OTHER & OTHER OTHER OTHER STRUCTURAL ENGINEERING DESIGN FACTORS. 3. WIND DESIGN CRITERIA WIND DESIGN CRITERIA 3.1. BASIC WIND SPEED: V = 115 MPH BASIC WIND SPEED: V = 115 MPH 3.2. EXPOSURE C EXPOSURE C 3.3. INTERNAL PRESSURE COEFFICIENT: 0.18 INTERNAL PRESSURE COEFFICIENT: ±0.184. SNOW DESIGN CRITERIA SNOW DESIGN CRITERIA 4.1. GROUND SNOW LOAD (Pg): 32 PSF GROUND SNOW LOAD (Pg): 32 PSF 4.2. DESIGN ROOF SNOW LOAD (Pf): 30 PSF DESIGN ROOF SNOW LOAD (Pf): 30 PSF 4.3. EXPOSURE FACTOR, Ce: 1.0 EXPOSURE FACTOR, Ce: 1.0 4.4. THERMAL FACTOR, Ct: 1.0 THERMAL FACTOR, Ct: 1.0 4.5. IMPORTANCE FACTOR, Is: 1.1 IMPORTANCE FACTOR, Is: 1.1 4.6. ROOF SLOPE FACTOR, Cs: 1.0 ROOF SLOPE FACTOR, Cs: 1.0 4.7. EXPOSURE C EXPOSURE C 4.8. DRIFTING: PER CODE DRIFTING: PER CODE 4.9. UNBALANCED: PER CODE UNBALANCED: PER CODE MISCELLANEOUS 1. THE CONTRACTOR AND SUB-TRADES SHALL FURNISH ALL REQUIRED MATERIAL, LABOR, THE CONTRACTOR AND SUB-TRADES SHALL FURNISH ALL REQUIRED MATERIAL, LABOR, CONTRACTOR AND SUB-TRADES SHALL FURNISH ALL REQUIRED MATERIAL, LABOR, CONTRACTOR AND SUB-TRADES SHALL FURNISH ALL REQUIRED MATERIAL, LABOR, AND SUB-TRADES SHALL FURNISH ALL REQUIRED MATERIAL, LABOR, AND SUB-TRADES SHALL FURNISH ALL REQUIRED MATERIAL, LABOR, SUB-TRADES SHALL FURNISH ALL REQUIRED MATERIAL, LABOR, SUB-TRADES SHALL FURNISH ALL REQUIRED MATERIAL, LABOR, SHALL FURNISH ALL REQUIRED MATERIAL, LABOR, SHALL FURNISH ALL REQUIRED MATERIAL, LABOR, FURNISH ALL REQUIRED MATERIAL, LABOR, FURNISH ALL REQUIRED MATERIAL, LABOR, ALL REQUIRED MATERIAL, LABOR, ALL REQUIRED MATERIAL, LABOR, REQUIRED MATERIAL, LABOR, REQUIRED MATERIAL, LABOR, MATERIAL, LABOR, MATERIAL, LABOR, LABOR, LABOR, EQUIPMENT AND PERFORM ALL WORK AS NECESSARY, AS INDICATED ON THE PROJECT AND PERFORM ALL WORK AS NECESSARY, AS INDICATED ON THE PROJECT AND PERFORM ALL WORK AS NECESSARY, AS INDICATED ON THE PROJECT PERFORM ALL WORK AS NECESSARY, AS INDICATED ON THE PROJECT PERFORM ALL WORK AS NECESSARY, AS INDICATED ON THE PROJECT ALL WORK AS NECESSARY, AS INDICATED ON THE PROJECT ALL WORK AS NECESSARY, AS INDICATED ON THE PROJECT WORK AS NECESSARY, AS INDICATED ON THE PROJECT WORK AS NECESSARY, AS INDICATED ON THE PROJECT AS NECESSARY, AS INDICATED ON THE PROJECT AS NECESSARY, AS INDICATED ON THE PROJECT NECESSARY, AS INDICATED ON THE PROJECT NECESSARY, AS INDICATED ON THE PROJECT AS INDICATED ON THE PROJECT AS INDICATED ON THE PROJECT INDICATED ON THE PROJECT INDICATED ON THE PROJECT ON THE PROJECT ON THE PROJECT THE PROJECT THE PROJECT PROJECT PROJECT DOCUMENTS, OR AS REASONABLY INFERRED TO EXECUTE THE SCOPE OF WORK FOR A OR AS REASONABLY INFERRED TO EXECUTE THE SCOPE OF WORK FOR A OR AS REASONABLY INFERRED TO EXECUTE THE SCOPE OF WORK FOR A AS REASONABLY INFERRED TO EXECUTE THE SCOPE OF WORK FOR A AS REASONABLY INFERRED TO EXECUTE THE SCOPE OF WORK FOR A REASONABLY INFERRED TO EXECUTE THE SCOPE OF WORK FOR A REASONABLY INFERRED TO EXECUTE THE SCOPE OF WORK FOR A INFERRED TO EXECUTE THE SCOPE OF WORK FOR A INFERRED TO EXECUTE THE SCOPE OF WORK FOR A TO EXECUTE THE SCOPE OF WORK FOR A TO EXECUTE THE SCOPE OF WORK FOR A EXECUTE THE SCOPE OF WORK FOR A EXECUTE THE SCOPE OF WORK FOR A THE SCOPE OF WORK FOR A THE SCOPE OF WORK FOR A SCOPE OF WORK FOR A SCOPE OF WORK FOR A OF WORK FOR A OF WORK FOR A WORK FOR A WORK FOR A FOR A FOR A A A PROPERLY FINISHED, COMPLETE JOB. THE CONTRACTOR IS REQUIRED TO OBTAIN ALL FINISHED, COMPLETE JOB. THE CONTRACTOR IS REQUIRED TO OBTAIN ALL FINISHED, COMPLETE JOB. THE CONTRACTOR IS REQUIRED TO OBTAIN ALL COMPLETE JOB. THE CONTRACTOR IS REQUIRED TO OBTAIN ALL COMPLETE JOB. THE CONTRACTOR IS REQUIRED TO OBTAIN ALL JOB. THE CONTRACTOR IS REQUIRED TO OBTAIN ALL JOB. THE CONTRACTOR IS REQUIRED TO OBTAIN ALL THE CONTRACTOR IS REQUIRED TO OBTAIN ALL THE CONTRACTOR IS REQUIRED TO OBTAIN ALL CONTRACTOR IS REQUIRED TO OBTAIN ALL CONTRACTOR IS REQUIRED TO OBTAIN ALL IS REQUIRED TO OBTAIN ALL IS REQUIRED TO OBTAIN ALL REQUIRED TO OBTAIN ALL REQUIRED TO OBTAIN ALL TO OBTAIN ALL TO OBTAIN ALL OBTAIN ALL OBTAIN ALL ALL ALL BUILDING PERMITS REQUIRED AND PAY FEES NEEDED FOR THESE PERMITS. 2. THE QUALITY OF WORKMANSHIP SHOULD BE SET AND SUPERVISED BY THE CONTRACTOR TO THE QUALITY OF WORKMANSHIP SHOULD BE SET AND SUPERVISED BY THE CONTRACTOR TO QUALITY OF WORKMANSHIP SHOULD BE SET AND SUPERVISED BY THE CONTRACTOR TO QUALITY OF WORKMANSHIP SHOULD BE SET AND SUPERVISED BY THE CONTRACTOR TO OF WORKMANSHIP SHOULD BE SET AND SUPERVISED BY THE CONTRACTOR TO OF WORKMANSHIP SHOULD BE SET AND SUPERVISED BY THE CONTRACTOR TO WORKMANSHIP SHOULD BE SET AND SUPERVISED BY THE CONTRACTOR TO WORKMANSHIP SHOULD BE SET AND SUPERVISED BY THE CONTRACTOR TO SHOULD BE SET AND SUPERVISED BY THE CONTRACTOR TO SHOULD BE SET AND SUPERVISED BY THE CONTRACTOR TO BE SET AND SUPERVISED BY THE CONTRACTOR TO BE SET AND SUPERVISED BY THE CONTRACTOR TO SET AND SUPERVISED BY THE CONTRACTOR TO SET AND SUPERVISED BY THE CONTRACTOR TO AND SUPERVISED BY THE CONTRACTOR TO AND SUPERVISED BY THE CONTRACTOR TO SUPERVISED BY THE CONTRACTOR TO SUPERVISED BY THE CONTRACTOR TO BY THE CONTRACTOR TO BY THE CONTRACTOR TO THE CONTRACTOR TO THE CONTRACTOR TO CONTRACTOR TO CONTRACTOR TO TO TO PASS BUILDING DEPT. OR ENGINEER INSPECTION FOR ROUGH CONSTRUCTION. THE LEVEL BUILDING DEPT. OR ENGINEER INSPECTION FOR ROUGH CONSTRUCTION. THE LEVEL BUILDING DEPT. OR ENGINEER INSPECTION FOR ROUGH CONSTRUCTION. THE LEVEL DEPT. OR ENGINEER INSPECTION FOR ROUGH CONSTRUCTION. THE LEVEL DEPT. OR ENGINEER INSPECTION FOR ROUGH CONSTRUCTION. THE LEVEL OR ENGINEER INSPECTION FOR ROUGH CONSTRUCTION. THE LEVEL OR ENGINEER INSPECTION FOR ROUGH CONSTRUCTION. THE LEVEL ENGINEER INSPECTION FOR ROUGH CONSTRUCTION. THE LEVEL ENGINEER INSPECTION FOR ROUGH CONSTRUCTION. THE LEVEL INSPECTION FOR ROUGH CONSTRUCTION. THE LEVEL INSPECTION FOR ROUGH CONSTRUCTION. THE LEVEL FOR ROUGH CONSTRUCTION. THE LEVEL FOR ROUGH CONSTRUCTION. THE LEVEL ROUGH CONSTRUCTION. THE LEVEL ROUGH CONSTRUCTION. THE LEVEL CONSTRUCTION. THE LEVEL CONSTRUCTION. THE LEVEL THE LEVEL THE LEVEL THE LEVEL LEVEL LEVEL OF QUALITY AND TOLERANCE SHOULD BE APPROPRIATE FOR THE INSTALLED ELEMENT TO QUALITY AND TOLERANCE SHOULD BE APPROPRIATE FOR THE INSTALLED ELEMENT TO QUALITY AND TOLERANCE SHOULD BE APPROPRIATE FOR THE INSTALLED ELEMENT TO AND TOLERANCE SHOULD BE APPROPRIATE FOR THE INSTALLED ELEMENT TO AND TOLERANCE SHOULD BE APPROPRIATE FOR THE INSTALLED ELEMENT TO TOLERANCE SHOULD BE APPROPRIATE FOR THE INSTALLED ELEMENT TO TOLERANCE SHOULD BE APPROPRIATE FOR THE INSTALLED ELEMENT TO SHOULD BE APPROPRIATE FOR THE INSTALLED ELEMENT TO SHOULD BE APPROPRIATE FOR THE INSTALLED ELEMENT TO BE APPROPRIATE FOR THE INSTALLED ELEMENT TO BE APPROPRIATE FOR THE INSTALLED ELEMENT TO APPROPRIATE FOR THE INSTALLED ELEMENT TO APPROPRIATE FOR THE INSTALLED ELEMENT TO FOR THE INSTALLED ELEMENT TO FOR THE INSTALLED ELEMENT TO THE INSTALLED ELEMENT TO THE INSTALLED ELEMENT TO INSTALLED ELEMENT TO INSTALLED ELEMENT TO ELEMENT TO ELEMENT TO TO TO RECEIVE THE NEXT IN-LINE FINISH ASPECT OF CONSTRUCTION. . 3. THE PURPOSE OF PROJECT DRAWINGS IS TO DEPICT THE OVERALL SCOPE OF THE THE PURPOSE OF PROJECT DRAWINGS IS TO DEPICT THE OVERALL SCOPE OF THE PURPOSE OF PROJECT DRAWINGS IS TO DEPICT THE OVERALL SCOPE OF THE PURPOSE OF PROJECT DRAWINGS IS TO DEPICT THE OVERALL SCOPE OF THE OF PROJECT DRAWINGS IS TO DEPICT THE OVERALL SCOPE OF THE OF PROJECT DRAWINGS IS TO DEPICT THE OVERALL SCOPE OF THE PROJECT DRAWINGS IS TO DEPICT THE OVERALL SCOPE OF THE PROJECT DRAWINGS IS TO DEPICT THE OVERALL SCOPE OF THE DRAWINGS IS TO DEPICT THE OVERALL SCOPE OF THE DRAWINGS IS TO DEPICT THE OVERALL SCOPE OF THE IS TO DEPICT THE OVERALL SCOPE OF THE IS TO DEPICT THE OVERALL SCOPE OF THE TO DEPICT THE OVERALL SCOPE OF THE TO DEPICT THE OVERALL SCOPE OF THE DEPICT THE OVERALL SCOPE OF THE DEPICT THE OVERALL SCOPE OF THE THE OVERALL SCOPE OF THE THE OVERALL SCOPE OF THE OVERALL SCOPE OF THE OVERALL SCOPE OF THE SCOPE OF THE SCOPE OF THE OF THE OF THE THE THE PROJECT. THE PROJECT DRAWINGS HAVE BEEN DEVELOPED TO SHOW A LEVEL OF DETAIL THE PROJECT DRAWINGS HAVE BEEN DEVELOPED TO SHOW A LEVEL OF DETAIL THE PROJECT DRAWINGS HAVE BEEN DEVELOPED TO SHOW A LEVEL OF DETAIL THE PROJECT DRAWINGS HAVE BEEN DEVELOPED TO SHOW A LEVEL OF DETAIL PROJECT DRAWINGS HAVE BEEN DEVELOPED TO SHOW A LEVEL OF DETAIL PROJECT DRAWINGS HAVE BEEN DEVELOPED TO SHOW A LEVEL OF DETAIL DRAWINGS HAVE BEEN DEVELOPED TO SHOW A LEVEL OF DETAIL DRAWINGS HAVE BEEN DEVELOPED TO SHOW A LEVEL OF DETAIL HAVE BEEN DEVELOPED TO SHOW A LEVEL OF DETAIL HAVE BEEN DEVELOPED TO SHOW A LEVEL OF DETAIL BEEN DEVELOPED TO SHOW A LEVEL OF DETAIL BEEN DEVELOPED TO SHOW A LEVEL OF DETAIL DEVELOPED TO SHOW A LEVEL OF DETAIL DEVELOPED TO SHOW A LEVEL OF DETAIL TO SHOW A LEVEL OF DETAIL TO SHOW A LEVEL OF DETAIL SHOW A LEVEL OF DETAIL SHOW A LEVEL OF DETAIL A LEVEL OF DETAIL A LEVEL OF DETAIL LEVEL OF DETAIL LEVEL OF DETAIL OF DETAIL OF DETAIL DETAIL DETAIL WITH THE OBJECTIVE OF PLAN CHECK APPROVAL AND ISSUANCE OF A BUILDING PERMIT. THE OBJECTIVE OF PLAN CHECK APPROVAL AND ISSUANCE OF A BUILDING PERMIT. THE OBJECTIVE OF PLAN CHECK APPROVAL AND ISSUANCE OF A BUILDING PERMIT. OBJECTIVE OF PLAN CHECK APPROVAL AND ISSUANCE OF A BUILDING PERMIT. OBJECTIVE OF PLAN CHECK APPROVAL AND ISSUANCE OF A BUILDING PERMIT. OF PLAN CHECK APPROVAL AND ISSUANCE OF A BUILDING PERMIT. OF PLAN CHECK APPROVAL AND ISSUANCE OF A BUILDING PERMIT. PLAN CHECK APPROVAL AND ISSUANCE OF A BUILDING PERMIT. PLAN CHECK APPROVAL AND ISSUANCE OF A BUILDING PERMIT. CHECK APPROVAL AND ISSUANCE OF A BUILDING PERMIT. CHECK APPROVAL AND ISSUANCE OF A BUILDING PERMIT. APPROVAL AND ISSUANCE OF A BUILDING PERMIT. APPROVAL AND ISSUANCE OF A BUILDING PERMIT. AND ISSUANCE OF A BUILDING PERMIT. AND ISSUANCE OF A BUILDING PERMIT. ISSUANCE OF A BUILDING PERMIT. ISSUANCE OF A BUILDING PERMIT. OF A BUILDING PERMIT. OF A BUILDING PERMIT. A BUILDING PERMIT. A BUILDING PERMIT. BUILDING PERMIT. BUILDING PERMIT. PERMIT. PERMIT. THIS MODERATE LEVEL OF DETAIL USED SHOULD ALLOW FOR A VARIETY OF STANDARD MODERATE LEVEL OF DETAIL USED SHOULD ALLOW FOR A VARIETY OF STANDARD MODERATE LEVEL OF DETAIL USED SHOULD ALLOW FOR A VARIETY OF STANDARD LEVEL OF DETAIL USED SHOULD ALLOW FOR A VARIETY OF STANDARD LEVEL OF DETAIL USED SHOULD ALLOW FOR A VARIETY OF STANDARD OF DETAIL USED SHOULD ALLOW FOR A VARIETY OF STANDARD OF DETAIL USED SHOULD ALLOW FOR A VARIETY OF STANDARD DETAIL USED SHOULD ALLOW FOR A VARIETY OF STANDARD DETAIL USED SHOULD ALLOW FOR A VARIETY OF STANDARD USED SHOULD ALLOW FOR A VARIETY OF STANDARD USED SHOULD ALLOW FOR A VARIETY OF STANDARD SHOULD ALLOW FOR A VARIETY OF STANDARD SHOULD ALLOW FOR A VARIETY OF STANDARD ALLOW FOR A VARIETY OF STANDARD ALLOW FOR A VARIETY OF STANDARD FOR A VARIETY OF STANDARD FOR A VARIETY OF STANDARD A VARIETY OF STANDARD A VARIETY OF STANDARD VARIETY OF STANDARD VARIETY OF STANDARD OF STANDARD OF STANDARD STANDARD STANDARD CONSTRUCTION METHODS AND SEQUENCES. THE PROJECT DRAWINGS ARE INTENDED TO METHODS AND SEQUENCES. THE PROJECT DRAWINGS ARE INTENDED TO METHODS AND SEQUENCES. THE PROJECT DRAWINGS ARE INTENDED TO AND SEQUENCES. THE PROJECT DRAWINGS ARE INTENDED TO AND SEQUENCES. THE PROJECT DRAWINGS ARE INTENDED TO SEQUENCES. THE PROJECT DRAWINGS ARE INTENDED TO SEQUENCES. THE PROJECT DRAWINGS ARE INTENDED TO THE PROJECT DRAWINGS ARE INTENDED TO THE PROJECT DRAWINGS ARE INTENDED TO THE PROJECT DRAWINGS ARE INTENDED TO PROJECT DRAWINGS ARE INTENDED TO PROJECT DRAWINGS ARE INTENDED TO DRAWINGS ARE INTENDED TO DRAWINGS ARE INTENDED TO ARE INTENDED TO ARE INTENDED TO INTENDED TO INTENDED TO TO TO COMPLY WITH THE ORDINANCES, RULES AND REGULATIONS OF THE JURISDICTION IN WHICH WITH THE ORDINANCES, RULES AND REGULATIONS OF THE JURISDICTION IN WHICH WITH THE ORDINANCES, RULES AND REGULATIONS OF THE JURISDICTION IN WHICH THE ORDINANCES, RULES AND REGULATIONS OF THE JURISDICTION IN WHICH THE ORDINANCES, RULES AND REGULATIONS OF THE JURISDICTION IN WHICH ORDINANCES, RULES AND REGULATIONS OF THE JURISDICTION IN WHICH ORDINANCES, RULES AND REGULATIONS OF THE JURISDICTION IN WHICH RULES AND REGULATIONS OF THE JURISDICTION IN WHICH RULES AND REGULATIONS OF THE JURISDICTION IN WHICH AND REGULATIONS OF THE JURISDICTION IN WHICH AND REGULATIONS OF THE JURISDICTION IN WHICH REGULATIONS OF THE JURISDICTION IN WHICH REGULATIONS OF THE JURISDICTION IN WHICH OF THE JURISDICTION IN WHICH OF THE JURISDICTION IN WHICH THE JURISDICTION IN WHICH THE JURISDICTION IN WHICH JURISDICTION IN WHICH JURISDICTION IN WHICH IN WHICH IN WHICH WHICH WHICH THE BUILDING IS LOCATED. 4. THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED CONDITION. THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED CONDITION. CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED CONDITION. CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED CONDITION. DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED CONDITION. DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED CONDITION. AND SPECIFICATIONS REPRESENT THE FINISHED CONDITION. AND SPECIFICATIONS REPRESENT THE FINISHED CONDITION. SPECIFICATIONS REPRESENT THE FINISHED CONDITION. SPECIFICATIONS REPRESENT THE FINISHED CONDITION. REPRESENT THE FINISHED CONDITION. REPRESENT THE FINISHED CONDITION. THE FINISHED CONDITION. THE FINISHED CONDITION. FINISHED CONDITION. FINISHED CONDITION. CONDITION. CONDITION. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR IS DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR IS DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR IS NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR IS NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR IS INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR IS INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR IS THE METHOD OF CONSTRUCTION. THE CONTRACTOR IS THE METHOD OF CONSTRUCTION. THE CONTRACTOR IS METHOD OF CONSTRUCTION. THE CONTRACTOR IS METHOD OF CONSTRUCTION. THE CONTRACTOR IS OF CONSTRUCTION. THE CONTRACTOR IS OF CONSTRUCTION. THE CONTRACTOR IS CONSTRUCTION. THE CONTRACTOR IS CONSTRUCTION. THE CONTRACTOR IS THE CONTRACTOR IS THE CONTRACTOR IS THE CONTRACTOR IS CONTRACTOR IS CONTRACTOR IS IS IS RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNOLOGIES, SEQUENCES AND FOR CONSTRUCTION MEANS, METHODS, TECHNOLOGIES, SEQUENCES AND FOR CONSTRUCTION MEANS, METHODS, TECHNOLOGIES, SEQUENCES AND CONSTRUCTION MEANS, METHODS, TECHNOLOGIES, SEQUENCES AND CONSTRUCTION MEANS, METHODS, TECHNOLOGIES, SEQUENCES AND MEANS, METHODS, TECHNOLOGIES, SEQUENCES AND MEANS, METHODS, TECHNOLOGIES, SEQUENCES AND METHODS, TECHNOLOGIES, SEQUENCES AND METHODS, TECHNOLOGIES, SEQUENCES AND TECHNOLOGIES, SEQUENCES AND TECHNOLOGIES, SEQUENCES AND SEQUENCES AND SEQUENCES AND AND AND PROCEDURES. 5. CONSTRUCTION MATERIAL SHALL BE SPREAD OUT IF PLACED ON FRAMED FLOORS OR ROOF. CONSTRUCTION MATERIAL SHALL BE SPREAD OUT IF PLACED ON FRAMED FLOORS OR ROOF. LOAD SHALL NOT EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT. 6. WHERE REFERENCE IS MADE TO VARIOUS TEST STANDARDS FOR MATERIALS, SUCH WHERE REFERENCE IS MADE TO VARIOUS TEST STANDARDS FOR MATERIALS, SUCH REFERENCE IS MADE TO VARIOUS TEST STANDARDS FOR MATERIALS, SUCH REFERENCE IS MADE TO VARIOUS TEST STANDARDS FOR MATERIALS, SUCH IS MADE TO VARIOUS TEST STANDARDS FOR MATERIALS, SUCH IS MADE TO VARIOUS TEST STANDARDS FOR MATERIALS, SUCH MADE TO VARIOUS TEST STANDARDS FOR MATERIALS, SUCH MADE TO VARIOUS TEST STANDARDS FOR MATERIALS, SUCH TO VARIOUS TEST STANDARDS FOR MATERIALS, SUCH TO VARIOUS TEST STANDARDS FOR MATERIALS, SUCH VARIOUS TEST STANDARDS FOR MATERIALS, SUCH VARIOUS TEST STANDARDS FOR MATERIALS, SUCH TEST STANDARDS FOR MATERIALS, SUCH TEST STANDARDS FOR MATERIALS, SUCH STANDARDS FOR MATERIALS, SUCH STANDARDS FOR MATERIALS, SUCH FOR MATERIALS, SUCH FOR MATERIALS, SUCH MATERIALS, SUCH MATERIALS, SUCH SUCH SUCH STANDARDS SHALL BE THE LATEST EDITION AND/OR ADDENDUM. 7. OPTIONS ARE FOR CONTRACTOR'S CONVENIENCE. THEY SHALL BE RESPONSIBLE FOR ALL OPTIONS ARE FOR CONTRACTOR'S CONVENIENCE. THEY SHALL BE RESPONSIBLE FOR ALL ARE FOR CONTRACTOR'S CONVENIENCE. THEY SHALL BE RESPONSIBLE FOR ALL ARE FOR CONTRACTOR'S CONVENIENCE. THEY SHALL BE RESPONSIBLE FOR ALL FOR CONTRACTOR'S CONVENIENCE. THEY SHALL BE RESPONSIBLE FOR ALL FOR CONTRACTOR'S CONVENIENCE. THEY SHALL BE RESPONSIBLE FOR ALL CONTRACTOR'S CONVENIENCE. THEY SHALL BE RESPONSIBLE FOR ALL CONTRACTOR'S CONVENIENCE. THEY SHALL BE RESPONSIBLE FOR ALL CONVENIENCE. THEY SHALL BE RESPONSIBLE FOR ALL CONVENIENCE. THEY SHALL BE RESPONSIBLE FOR ALL THEY SHALL BE RESPONSIBLE FOR ALL THEY SHALL BE RESPONSIBLE FOR ALL SHALL BE RESPONSIBLE FOR ALL SHALL BE RESPONSIBLE FOR ALL BE RESPONSIBLE FOR ALL BE RESPONSIBLE FOR ALL RESPONSIBLE FOR ALL RESPONSIBLE FOR ALL FOR ALL FOR ALL ALL ALL CHANGES NECESSARY IF THEY CHOOSE AN OPTION AND THEY SHALL COORDINATE ALL NECESSARY IF THEY CHOOSE AN OPTION AND THEY SHALL COORDINATE ALL NECESSARY IF THEY CHOOSE AN OPTION AND THEY SHALL COORDINATE ALL IF THEY CHOOSE AN OPTION AND THEY SHALL COORDINATE ALL IF THEY CHOOSE AN OPTION AND THEY SHALL COORDINATE ALL THEY CHOOSE AN OPTION AND THEY SHALL COORDINATE ALL THEY CHOOSE AN OPTION AND THEY SHALL COORDINATE ALL CHOOSE AN OPTION AND THEY SHALL COORDINATE ALL CHOOSE AN OPTION AND THEY SHALL COORDINATE ALL AN OPTION AND THEY SHALL COORDINATE ALL AN OPTION AND THEY SHALL COORDINATE ALL OPTION AND THEY SHALL COORDINATE ALL OPTION AND THEY SHALL COORDINATE ALL AND THEY SHALL COORDINATE ALL AND THEY SHALL COORDINATE ALL THEY SHALL COORDINATE ALL THEY SHALL COORDINATE ALL SHALL COORDINATE ALL SHALL COORDINATE ALL COORDINATE ALL COORDINATE ALL ALL ALL DETAILS. 8. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL STRUCTURAL NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL STRUCTURAL AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL STRUCTURAL AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL STRUCTURAL DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL STRUCTURAL DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL STRUCTURAL ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL STRUCTURAL ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL STRUCTURAL DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL STRUCTURAL DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL STRUCTURAL SHALL TAKE PRECEDENCE OVER GENERAL STRUCTURAL SHALL TAKE PRECEDENCE OVER GENERAL STRUCTURAL TAKE PRECEDENCE OVER GENERAL STRUCTURAL TAKE PRECEDENCE OVER GENERAL STRUCTURAL PRECEDENCE OVER GENERAL STRUCTURAL PRECEDENCE OVER GENERAL STRUCTURAL OVER GENERAL STRUCTURAL OVER GENERAL STRUCTURAL GENERAL STRUCTURAL GENERAL STRUCTURAL STRUCTURAL STRUCTURAL NOTES AND TYPICAL DETAILS. WHERE NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION AND TYPICAL DETAILS. WHERE NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION AND TYPICAL DETAILS. WHERE NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION TYPICAL DETAILS. WHERE NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION TYPICAL DETAILS. WHERE NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION DETAILS. WHERE NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION DETAILS. WHERE NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION WHERE NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION WHERE NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION WHERE NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION DETAILS ARE SHOWN, CONSTRUCTION DETAILS ARE SHOWN, CONSTRUCTION ARE SHOWN, CONSTRUCTION ARE SHOWN, CONSTRUCTION SHOWN, CONSTRUCTION SHOWN, CONSTRUCTION CONSTRUCTION CONSTRUCTION SHALL CONFORM TO SIMILAR WORK ON THE PROJECT. 9. TYPICAL DETAILS ARE NOT CUT ON DRAWINGS, BUT APPLY UNLESS NOTED OTHERWISE. TYPICAL DETAILS ARE NOT CUT ON DRAWINGS, BUT APPLY UNLESS NOTED OTHERWISE. 10. IN THE CASE OF DISCREPANCIES BETWEEN THE GENERAL NOTES, SPECIFICATIONS, IN THE CASE OF DISCREPANCIES BETWEEN THE GENERAL NOTES, SPECIFICATIONS, THE CASE OF DISCREPANCIES BETWEEN THE GENERAL NOTES, SPECIFICATIONS, THE CASE OF DISCREPANCIES BETWEEN THE GENERAL NOTES, SPECIFICATIONS, CASE OF DISCREPANCIES BETWEEN THE GENERAL NOTES, SPECIFICATIONS, CASE OF DISCREPANCIES BETWEEN THE GENERAL NOTES, SPECIFICATIONS, OF DISCREPANCIES BETWEEN THE GENERAL NOTES, SPECIFICATIONS, OF DISCREPANCIES BETWEEN THE GENERAL NOTES, SPECIFICATIONS, DISCREPANCIES BETWEEN THE GENERAL NOTES, SPECIFICATIONS, DISCREPANCIES BETWEEN THE GENERAL NOTES, SPECIFICATIONS, BETWEEN THE GENERAL NOTES, SPECIFICATIONS, BETWEEN THE GENERAL NOTES, SPECIFICATIONS, THE GENERAL NOTES, SPECIFICATIONS, THE GENERAL NOTES, SPECIFICATIONS, GENERAL NOTES, SPECIFICATIONS, GENERAL NOTES, SPECIFICATIONS, NOTES, SPECIFICATIONS, NOTES, SPECIFICATIONS, SPECIFICATIONS, SPECIFICATIONS, PLANS/DETAILS OR REFERENCE STANDARDS, THE ENGINEER SHALL DETERMINE WHICH SHALL OR REFERENCE STANDARDS, THE ENGINEER SHALL DETERMINE WHICH SHALL OR REFERENCE STANDARDS, THE ENGINEER SHALL DETERMINE WHICH SHALL REFERENCE STANDARDS, THE ENGINEER SHALL DETERMINE WHICH SHALL REFERENCE STANDARDS, THE ENGINEER SHALL DETERMINE WHICH SHALL STANDARDS, THE ENGINEER SHALL DETERMINE WHICH SHALL STANDARDS, THE ENGINEER SHALL DETERMINE WHICH SHALL THE ENGINEER SHALL DETERMINE WHICH SHALL THE ENGINEER SHALL DETERMINE WHICH SHALL ENGINEER SHALL DETERMINE WHICH SHALL ENGINEER SHALL DETERMINE WHICH SHALL SHALL DETERMINE WHICH SHALL SHALL DETERMINE WHICH SHALL DETERMINE WHICH SHALL DETERMINE WHICH SHALL WHICH SHALL WHICH SHALL SHALL SHALL GOVERN. DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE BROUGHT TO THE IMMEDIATE ATTENTION OF THE BROUGHT TO THE IMMEDIATE ATTENTION OF THE TO THE IMMEDIATE ATTENTION OF THE TO THE IMMEDIATE ATTENTION OF THE THE IMMEDIATE ATTENTION OF THE THE IMMEDIATE ATTENTION OF THE IMMEDIATE ATTENTION OF THE IMMEDIATE ATTENTION OF THE ATTENTION OF THE ATTENTION OF THE OF THE OF THE THE THE ENGINEER BEFORE PROCEEDING WITH THE WORK. SHOULD ANY DISCREPANCY BE FOUND IN BEFORE PROCEEDING WITH THE WORK. SHOULD ANY DISCREPANCY BE FOUND IN BEFORE PROCEEDING WITH THE WORK. SHOULD ANY DISCREPANCY BE FOUND IN PROCEEDING WITH THE WORK. SHOULD ANY DISCREPANCY BE FOUND IN PROCEEDING WITH THE WORK. SHOULD ANY DISCREPANCY BE FOUND IN WITH THE WORK. SHOULD ANY DISCREPANCY BE FOUND IN WITH THE WORK. SHOULD ANY DISCREPANCY BE FOUND IN THE WORK. SHOULD ANY DISCREPANCY BE FOUND IN THE WORK. SHOULD ANY DISCREPANCY BE FOUND IN WORK. SHOULD ANY DISCREPANCY BE FOUND IN WORK. SHOULD ANY DISCREPANCY BE FOUND IN SHOULD ANY DISCREPANCY BE FOUND IN SHOULD ANY DISCREPANCY BE FOUND IN ANY DISCREPANCY BE FOUND IN ANY DISCREPANCY BE FOUND IN DISCREPANCY BE FOUND IN DISCREPANCY BE FOUND IN BE FOUND IN BE FOUND IN FOUND IN FOUND IN IN IN THE CONTRACT DOCUMENTS, THE CONTRACTOR WILL BE DEEMED TO HAVE INCLUDED IN CONTRACT DOCUMENTS, THE CONTRACTOR WILL BE DEEMED TO HAVE INCLUDED IN CONTRACT DOCUMENTS, THE CONTRACTOR WILL BE DEEMED TO HAVE INCLUDED IN DOCUMENTS, THE CONTRACTOR WILL BE DEEMED TO HAVE INCLUDED IN DOCUMENTS, THE CONTRACTOR WILL BE DEEMED TO HAVE INCLUDED IN THE CONTRACTOR WILL BE DEEMED TO HAVE INCLUDED IN THE CONTRACTOR WILL BE DEEMED TO HAVE INCLUDED IN CONTRACTOR WILL BE DEEMED TO HAVE INCLUDED IN CONTRACTOR WILL BE DEEMED TO HAVE INCLUDED IN WILL BE DEEMED TO HAVE INCLUDED IN WILL BE DEEMED TO HAVE INCLUDED IN BE DEEMED TO HAVE INCLUDED IN BE DEEMED TO HAVE INCLUDED IN DEEMED TO HAVE INCLUDED IN DEEMED TO HAVE INCLUDED IN TO HAVE INCLUDED IN TO HAVE INCLUDED IN HAVE INCLUDED IN HAVE INCLUDED IN INCLUDED IN INCLUDED IN IN IN THE PRICE THE MOST EXPENSIVE WAY OF COMPLETING THE WORK, UNLESS PRIOR TO THE PRICE THE MOST EXPENSIVE WAY OF COMPLETING THE WORK, UNLESS PRIOR TO THE PRICE THE MOST EXPENSIVE WAY OF COMPLETING THE WORK, UNLESS PRIOR TO THE THE MOST EXPENSIVE WAY OF COMPLETING THE WORK, UNLESS PRIOR TO THE THE MOST EXPENSIVE WAY OF COMPLETING THE WORK, UNLESS PRIOR TO THE MOST EXPENSIVE WAY OF COMPLETING THE WORK, UNLESS PRIOR TO THE MOST EXPENSIVE WAY OF COMPLETING THE WORK, UNLESS PRIOR TO THE EXPENSIVE WAY OF COMPLETING THE WORK, UNLESS PRIOR TO THE EXPENSIVE WAY OF COMPLETING THE WORK, UNLESS PRIOR TO THE WAY OF COMPLETING THE WORK, UNLESS PRIOR TO THE WAY OF COMPLETING THE WORK, UNLESS PRIOR TO THE OF COMPLETING THE WORK, UNLESS PRIOR TO THE OF COMPLETING THE WORK, UNLESS PRIOR TO THE COMPLETING THE WORK, UNLESS PRIOR TO THE COMPLETING THE WORK, UNLESS PRIOR TO THE THE WORK, UNLESS PRIOR TO THE THE WORK, UNLESS PRIOR TO THE WORK, UNLESS PRIOR TO THE WORK, UNLESS PRIOR TO THE UNLESS PRIOR TO THE UNLESS PRIOR TO THE PRIOR TO THE PRIOR TO THE TO THE TO THE THE THE SUBMISSION OF THE PRICE, THE CONTRACTOR ASKS FOR A DECISION FROM THE ARCHITECT OF THE PRICE, THE CONTRACTOR ASKS FOR A DECISION FROM THE ARCHITECT OF THE PRICE, THE CONTRACTOR ASKS FOR A DECISION FROM THE ARCHITECT THE PRICE, THE CONTRACTOR ASKS FOR A DECISION FROM THE ARCHITECT THE PRICE, THE CONTRACTOR ASKS FOR A DECISION FROM THE ARCHITECT PRICE, THE CONTRACTOR ASKS FOR A DECISION FROM THE ARCHITECT PRICE, THE CONTRACTOR ASKS FOR A DECISION FROM THE ARCHITECT THE CONTRACTOR ASKS FOR A DECISION FROM THE ARCHITECT THE CONTRACTOR ASKS FOR A DECISION FROM THE ARCHITECT CONTRACTOR ASKS FOR A DECISION FROM THE ARCHITECT CONTRACTOR ASKS FOR A DECISION FROM THE ARCHITECT ASKS FOR A DECISION FROM THE ARCHITECT ASKS FOR A DECISION FROM THE ARCHITECT FOR A DECISION FROM THE ARCHITECT FOR A DECISION FROM THE ARCHITECT A DECISION FROM THE ARCHITECT A DECISION FROM THE ARCHITECT DECISION FROM THE ARCHITECT DECISION FROM THE ARCHITECT FROM THE ARCHITECT FROM THE ARCHITECT THE ARCHITECT THE ARCHITECT ARCHITECT ARCHITECT AS TO WHICH SHALL GOVERN. ACCORDINGLY, ANY CONFLICT IN OR BETWEEN THE TO WHICH SHALL GOVERN. ACCORDINGLY, ANY CONFLICT IN OR BETWEEN THE TO WHICH SHALL GOVERN. ACCORDINGLY, ANY CONFLICT IN OR BETWEEN THE WHICH SHALL GOVERN. ACCORDINGLY, ANY CONFLICT IN OR BETWEEN THE WHICH SHALL GOVERN. ACCORDINGLY, ANY CONFLICT IN OR BETWEEN THE SHALL GOVERN. ACCORDINGLY, ANY CONFLICT IN OR BETWEEN THE SHALL GOVERN. ACCORDINGLY, ANY CONFLICT IN OR BETWEEN THE GOVERN. ACCORDINGLY, ANY CONFLICT IN OR BETWEEN THE GOVERN. ACCORDINGLY, ANY CONFLICT IN OR BETWEEN THE ACCORDINGLY, ANY CONFLICT IN OR BETWEEN THE ACCORDINGLY, ANY CONFLICT IN OR BETWEEN THE ANY CONFLICT IN OR BETWEEN THE ANY CONFLICT IN OR BETWEEN THE CONFLICT IN OR BETWEEN THE CONFLICT IN OR BETWEEN THE IN OR BETWEEN THE IN OR BETWEEN THE OR BETWEEN THE OR BETWEEN THE BETWEEN THE BETWEEN THE THE THE CONTRACT DOCUMENTS SHALL NOT BE A BASIS FOR ADJUSTMENT IN THE CONTRACT PRICE. 11. VISITS TO THE JOBSITE BY THE ENGINEER TO OBSERVE CONSTRUCTION DO NOT IN ANY VISITS TO THE JOBSITE BY THE ENGINEER TO OBSERVE CONSTRUCTION DO NOT IN ANY ISITS TO THE JOBSITE BY THE ENGINEER TO OBSERVE CONSTRUCTION DO NOT IN ANY TO THE JOBSITE BY THE ENGINEER TO OBSERVE CONSTRUCTION DO NOT IN ANY TO THE JOBSITE BY THE ENGINEER TO OBSERVE CONSTRUCTION DO NOT IN ANY THE JOBSITE BY THE ENGINEER TO OBSERVE CONSTRUCTION DO NOT IN ANY THE JOBSITE BY THE ENGINEER TO OBSERVE CONSTRUCTION DO NOT IN ANY JOBSITE BY THE ENGINEER TO OBSERVE CONSTRUCTION DO NOT IN ANY JOBSITE BY THE ENGINEER TO OBSERVE CONSTRUCTION DO NOT IN ANY BY THE ENGINEER TO OBSERVE CONSTRUCTION DO NOT IN ANY BY THE ENGINEER TO OBSERVE CONSTRUCTION DO NOT IN ANY THE ENGINEER TO OBSERVE CONSTRUCTION DO NOT IN ANY THE ENGINEER TO OBSERVE CONSTRUCTION DO NOT IN ANY ENGINEER TO OBSERVE CONSTRUCTION DO NOT IN ANY ENGINEER TO OBSERVE CONSTRUCTION DO NOT IN ANY TO OBSERVE CONSTRUCTION DO NOT IN ANY TO OBSERVE CONSTRUCTION DO NOT IN ANY OBSERVE CONSTRUCTION DO NOT IN ANY OBSERVE CONSTRUCTION DO NOT IN ANY CONSTRUCTION DO NOT IN ANY CONSTRUCTION DO NOT IN ANY DO NOT IN ANY DO NOT IN ANY NOT IN ANY NOT IN ANY IN ANY IN ANY ANY ANY WAY MEAN THAT THEY ARE THE GUARANTORS OF THE CONTRACTORS WORK, NOR MEAN THAT THEY ARE THE GUARANTORS OF THE CONTRACTORS WORK, NOR MEAN THAT THEY ARE THE GUARANTORS OF THE CONTRACTORS WORK, NOR THAT THEY ARE THE GUARANTORS OF THE CONTRACTORS WORK, NOR THAT THEY ARE THE GUARANTORS OF THE CONTRACTORS WORK, NOR THEY ARE THE GUARANTORS OF THE CONTRACTORS WORK, NOR THEY ARE THE GUARANTORS OF THE CONTRACTORS WORK, NOR ARE THE GUARANTORS OF THE CONTRACTORS WORK, NOR ARE THE GUARANTORS OF THE CONTRACTORS WORK, NOR THE GUARANTORS OF THE CONTRACTORS WORK, NOR THE GUARANTORS OF THE CONTRACTORS WORK, NOR GUARANTORS OF THE CONTRACTORS WORK, NOR GUARANTORS OF THE CONTRACTORS WORK, NOR OF THE CONTRACTORS WORK, NOR OF THE CONTRACTORS WORK, NOR THE CONTRACTORS WORK, NOR THE CONTRACTORS WORK, NOR CONTRACTORS WORK, NOR CONTRACTORS WORK, NOR WORK, NOR WORK, NOR NOR NOR SUPERVISION, NOR SAFETY AT THE JOBSITE. 12. REVIEW OF SHOP DRAWINGS BY THE ENGINEER IS FOR GENERAL CONFORMANCE WITH THE REVIEW OF SHOP DRAWINGS BY THE ENGINEER IS FOR GENERAL CONFORMANCE WITH THE EVIEW OF SHOP DRAWINGS BY THE ENGINEER IS FOR GENERAL CONFORMANCE WITH THE OF SHOP DRAWINGS BY THE ENGINEER IS FOR GENERAL CONFORMANCE WITH THE OF SHOP DRAWINGS BY THE ENGINEER IS FOR GENERAL CONFORMANCE WITH THE SHOP DRAWINGS BY THE ENGINEER IS FOR GENERAL CONFORMANCE WITH THE SHOP DRAWINGS BY THE ENGINEER IS FOR GENERAL CONFORMANCE WITH THE DRAWINGS BY THE ENGINEER IS FOR GENERAL CONFORMANCE WITH THE DRAWINGS BY THE ENGINEER IS FOR GENERAL CONFORMANCE WITH THE BY THE ENGINEER IS FOR GENERAL CONFORMANCE WITH THE BY THE ENGINEER IS FOR GENERAL CONFORMANCE WITH THE THE ENGINEER IS FOR GENERAL CONFORMANCE WITH THE THE ENGINEER IS FOR GENERAL CONFORMANCE WITH THE ENGINEER IS FOR GENERAL CONFORMANCE WITH THE ENGINEER IS FOR GENERAL CONFORMANCE WITH THE IS FOR GENERAL CONFORMANCE WITH THE IS FOR GENERAL CONFORMANCE WITH THE FOR GENERAL CONFORMANCE WITH THE FOR GENERAL CONFORMANCE WITH THE GENERAL CONFORMANCE WITH THE GENERAL CONFORMANCE WITH THE CONFORMANCE WITH THE CONFORMANCE WITH THE WITH THE WITH THE THE THE DESIGN CONCEPT AND GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS. REVIEW OF CONCEPT AND GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS. REVIEW OF CONCEPT AND GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS. REVIEW OF AND GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS. REVIEW OF AND GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS. REVIEW OF GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS. REVIEW OF GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS. REVIEW OF COMPLIANCE WITH THE CONTRACT DOCUMENTS. REVIEW OF COMPLIANCE WITH THE CONTRACT DOCUMENTS. REVIEW OF WITH THE CONTRACT DOCUMENTS. REVIEW OF WITH THE CONTRACT DOCUMENTS. REVIEW OF THE CONTRACT DOCUMENTS. REVIEW OF THE CONTRACT DOCUMENTS. REVIEW OF CONTRACT DOCUMENTS. REVIEW OF CONTRACT DOCUMENTS. REVIEW OF DOCUMENTS. REVIEW OF DOCUMENTS. REVIEW OF REVIEW OF REVIEW OF OF OF SUCH SHOP DRAWINGS BY THE ENGINEER SHALL NOT RELIEVE THE CONTRACTOR FROM SHOP DRAWINGS BY THE ENGINEER SHALL NOT RELIEVE THE CONTRACTOR FROM SHOP DRAWINGS BY THE ENGINEER SHALL NOT RELIEVE THE CONTRACTOR FROM DRAWINGS BY THE ENGINEER SHALL NOT RELIEVE THE CONTRACTOR FROM DRAWINGS BY THE ENGINEER SHALL NOT RELIEVE THE CONTRACTOR FROM BY THE ENGINEER SHALL NOT RELIEVE THE CONTRACTOR FROM BY THE ENGINEER SHALL NOT RELIEVE THE CONTRACTOR FROM THE ENGINEER SHALL NOT RELIEVE THE CONTRACTOR FROM THE ENGINEER SHALL NOT RELIEVE THE CONTRACTOR FROM ENGINEER SHALL NOT RELIEVE THE CONTRACTOR FROM ENGINEER SHALL NOT RELIEVE THE CONTRACTOR FROM SHALL NOT RELIEVE THE CONTRACTOR FROM SHALL NOT RELIEVE THE CONTRACTOR FROM NOT RELIEVE THE CONTRACTOR FROM NOT RELIEVE THE CONTRACTOR FROM RELIEVE THE CONTRACTOR FROM RELIEVE THE CONTRACTOR FROM THE CONTRACTOR FROM THE CONTRACTOR FROM CONTRACTOR FROM CONTRACTOR FROM FROM FROM RESPONSIBILITY FOR CORRECTNESS OF DIMENSIONS, FABRICATION DETAILS, SPACE FOR CORRECTNESS OF DIMENSIONS, FABRICATION DETAILS, SPACE FOR CORRECTNESS OF DIMENSIONS, FABRICATION DETAILS, SPACE CORRECTNESS OF DIMENSIONS, FABRICATION DETAILS, SPACE CORRECTNESS OF DIMENSIONS, FABRICATION DETAILS, SPACE OF DIMENSIONS, FABRICATION DETAILS, SPACE OF DIMENSIONS, FABRICATION DETAILS, SPACE DIMENSIONS, FABRICATION DETAILS, SPACE DIMENSIONS, FABRICATION DETAILS, SPACE FABRICATION DETAILS, SPACE FABRICATION DETAILS, SPACE DETAILS, SPACE DETAILS, SPACE SPACE SPACE REQUIREMENTS, AND ERRORS IN THE SHOP DRAWINGS, OR FOR DEVIATIONS FROM THE AND ERRORS IN THE SHOP DRAWINGS, OR FOR DEVIATIONS FROM THE AND ERRORS IN THE SHOP DRAWINGS, OR FOR DEVIATIONS FROM THE ERRORS IN THE SHOP DRAWINGS, OR FOR DEVIATIONS FROM THE ERRORS IN THE SHOP DRAWINGS, OR FOR DEVIATIONS FROM THE IN THE SHOP DRAWINGS, OR FOR DEVIATIONS FROM THE IN THE SHOP DRAWINGS, OR FOR DEVIATIONS FROM THE THE SHOP DRAWINGS, OR FOR DEVIATIONS FROM THE THE SHOP DRAWINGS, OR FOR DEVIATIONS FROM THE SHOP DRAWINGS, OR FOR DEVIATIONS FROM THE SHOP DRAWINGS, OR FOR DEVIATIONS FROM THE DRAWINGS, OR FOR DEVIATIONS FROM THE DRAWINGS, OR FOR DEVIATIONS FROM THE OR FOR DEVIATIONS FROM THE OR FOR DEVIATIONS FROM THE FOR DEVIATIONS FROM THE FOR DEVIATIONS FROM THE DEVIATIONS FROM THE DEVIATIONS FROM THE FROM THE FROM THE THE THE CONTRACT DRAWINGS OR SPECIFICATIONS UNLESS THE CONTRACTOR HAS SPECIFICALLY DRAWINGS OR SPECIFICATIONS UNLESS THE CONTRACTOR HAS SPECIFICALLY DRAWINGS OR SPECIFICATIONS UNLESS THE CONTRACTOR HAS SPECIFICALLY OR SPECIFICATIONS UNLESS THE CONTRACTOR HAS SPECIFICALLY OR SPECIFICATIONS UNLESS THE CONTRACTOR HAS SPECIFICALLY SPECIFICATIONS UNLESS THE CONTRACTOR HAS SPECIFICALLY SPECIFICATIONS UNLESS THE CONTRACTOR HAS SPECIFICALLY UNLESS THE CONTRACTOR HAS SPECIFICALLY UNLESS THE CONTRACTOR HAS SPECIFICALLY THE CONTRACTOR HAS SPECIFICALLY THE CONTRACTOR HAS SPECIFICALLY CONTRACTOR HAS SPECIFICALLY CONTRACTOR HAS SPECIFICALLY HAS SPECIFICALLY HAS SPECIFICALLY SPECIFICALLY SPECIFICALLY CALLED ATTENTION TO SUCH DEVIATIONS IN WRITING BY A LETTER ACCOMPANYING THE ATTENTION TO SUCH DEVIATIONS IN WRITING BY A LETTER ACCOMPANYING THE ATTENTION TO SUCH DEVIATIONS IN WRITING BY A LETTER ACCOMPANYING THE TO SUCH DEVIATIONS IN WRITING BY A LETTER ACCOMPANYING THE TO SUCH DEVIATIONS IN WRITING BY A LETTER ACCOMPANYING THE SUCH DEVIATIONS IN WRITING BY A LETTER ACCOMPANYING THE SUCH DEVIATIONS IN WRITING BY A LETTER ACCOMPANYING THE DEVIATIONS IN WRITING BY A LETTER ACCOMPANYING THE DEVIATIONS IN WRITING BY A LETTER ACCOMPANYING THE IN WRITING BY A LETTER ACCOMPANYING THE IN WRITING BY A LETTER ACCOMPANYING THE WRITING BY A LETTER ACCOMPANYING THE WRITING BY A LETTER ACCOMPANYING THE BY A LETTER ACCOMPANYING THE BY A LETTER ACCOMPANYING THE A LETTER ACCOMPANYING THE A LETTER ACCOMPANYING THE LETTER ACCOMPANYING THE LETTER ACCOMPANYING THE ACCOMPANYING THE ACCOMPANYING THE THE THE SHOP DRAWINGS AND THE ENGINEER APPROVES SUCH CHANGE OR DEVIATION IN WRITING. . 13. THE CONTRACTOR IS RESPONSIBLE FOR SAFETY PRECAUTIONS AND PROGRAMS IN THE CONTRACTOR IS RESPONSIBLE FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONTRACTOR IS RESPONSIBLE FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONTRACTOR IS RESPONSIBLE FOR SAFETY PRECAUTIONS AND PROGRAMS IN IS RESPONSIBLE FOR SAFETY PRECAUTIONS AND PROGRAMS IN IS RESPONSIBLE FOR SAFETY PRECAUTIONS AND PROGRAMS IN RESPONSIBLE FOR SAFETY PRECAUTIONS AND PROGRAMS IN RESPONSIBLE FOR SAFETY PRECAUTIONS AND PROGRAMS IN FOR SAFETY PRECAUTIONS AND PROGRAMS IN FOR SAFETY PRECAUTIONS AND PROGRAMS IN SAFETY PRECAUTIONS AND PROGRAMS IN SAFETY PRECAUTIONS AND PROGRAMS IN PRECAUTIONS AND PROGRAMS IN PRECAUTIONS AND PROGRAMS IN AND PROGRAMS IN AND PROGRAMS IN PROGRAMS IN PROGRAMS IN IN IN CONNECTION WITH THE WORK THAT CONFORMS TO THE REGULATIONS OF THE WITH THE WORK THAT CONFORMS TO THE REGULATIONS OF THE WITH THE WORK THAT CONFORMS TO THE REGULATIONS OF THE THE WORK THAT CONFORMS TO THE REGULATIONS OF THE THE WORK THAT CONFORMS TO THE REGULATIONS OF THE WORK THAT CONFORMS TO THE REGULATIONS OF THE WORK THAT CONFORMS TO THE REGULATIONS OF THE THAT CONFORMS TO THE REGULATIONS OF THE THAT CONFORMS TO THE REGULATIONS OF THE CONFORMS TO THE REGULATIONS OF THE CONFORMS TO THE REGULATIONS OF THE TO THE REGULATIONS OF THE TO THE REGULATIONS OF THE THE REGULATIONS OF THE THE REGULATIONS OF THE REGULATIONS OF THE REGULATIONS OF THE OF THE OF THE THE THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) SAFETY AND HEALTH SAFETY AND HEALTH ADMINISTRATION (OSHA) SAFETY AND HEALTH SAFETY AND HEALTH ADMINISTRATION (OSHA) SAFETY AND HEALTH AND HEALTH ADMINISTRATION (OSHA) SAFETY AND HEALTH AND HEALTH ADMINISTRATION (OSHA) SAFETY AND HEALTH HEALTH ADMINISTRATION (OSHA) SAFETY AND HEALTH HEALTH ADMINISTRATION (OSHA) SAFETY AND HEALTH ADMINISTRATION (OSHA) SAFETY AND HEALTH ADMINISTRATION (OSHA) SAFETY AND HEALTH (OSHA) SAFETY AND HEALTH (OSHA) SAFETY AND HEALTH SAFETY AND HEALTH SAFETY AND HEALTH AND HEALTH AND HEALTH HEALTH HEALTH STANDARDS FOR THE CONSTRUCTION INDUSTRY. . 14. ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL AND ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL AND STABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL AND AND VERIFY ALL OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL AND AND VERIFY ALL OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL AND VERIFY ALL OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL AND VERIFY ALL OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL AND ALL OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL AND ALL OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL AND OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL AND OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL AND AND INSERTS FOR MECHANICAL, ELECTRICAL AND AND INSERTS FOR MECHANICAL, ELECTRICAL AND INSERTS FOR MECHANICAL, ELECTRICAL AND INSERTS FOR MECHANICAL, ELECTRICAL AND FOR MECHANICAL, ELECTRICAL AND FOR MECHANICAL, ELECTRICAL AND MECHANICAL, ELECTRICAL AND MECHANICAL, ELECTRICAL AND ELECTRICAL AND ELECTRICAL AND AND AND PLUMBING WITH APPROPRIATE TRADES, DRAWINGS AND SUBCONTRACTORS PRIOR TO WITH APPROPRIATE TRADES, DRAWINGS AND SUBCONTRACTORS PRIOR TO WITH APPROPRIATE TRADES, DRAWINGS AND SUBCONTRACTORS PRIOR TO APPROPRIATE TRADES, DRAWINGS AND SUBCONTRACTORS PRIOR TO APPROPRIATE TRADES, DRAWINGS AND SUBCONTRACTORS PRIOR TO TRADES, DRAWINGS AND SUBCONTRACTORS PRIOR TO TRADES, DRAWINGS AND SUBCONTRACTORS PRIOR TO DRAWINGS AND SUBCONTRACTORS PRIOR TO DRAWINGS AND SUBCONTRACTORS PRIOR TO AND SUBCONTRACTORS PRIOR TO AND SUBCONTRACTORS PRIOR TO SUBCONTRACTORS PRIOR TO SUBCONTRACTORS PRIOR TO PRIOR TO PRIOR TO TO TO CONSTRUCTION.