This document is a mechanical and plumbing design plan set for Building 1840 Roof repair at Malmstrom Air Force Base, Montana, prepared by engineer Lawrence J. Wyatt (PE No. 39050). The project involves demolition and remodeling of existing mechanical and plumbing systems on the roof, with detailed specifications for ductwork, ventilation, and associated equipment installations. Key components include two Loren Cook gravity ventilators (GV-3 sized 31"x27" with 600 CFM for AHU-3 intake, and GV-5 sized 59"x51" with 3600 CFM for AHU-12 intake), emergency exhaust fan systems, roof curb installations, and ductwork penetrations through the existing roof structure. The plans include mechanical legends, abbreviations, installation details, and scheduling information for various HVAC components including dampers, valves, duct specialties, and piping systems for domestic hot and cold water supply.

The contractor is responsible for compliance with all applicable federal, state, and local codes; securing required permits and inspections; means and methods of construction; and coordination between all construction disciplines. All construction activities must comply with OSHA standards and safety requirements. The document specifies that only one emergency exhaust fan system may be taken offline at any time during duct repairs, with work plans coordinated with the government minimum five working days in advance. Restricted area access protocols are mandated due to ongoing facility operations, with construction personnel required to remain within designated work zones and prohibited from entering restricted areas without government authorization and escort. The plans are presented at 1/32"=1'-0" scale with detailed cross-sections, installation specifications, and coordination notes for roofing assembly repairs and sealing.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYMBOL DESCRIPTION

MECHANICAL LEGEND

DESCRIPTIONABBREVIATIONS

MECHANICAL ABBREVIATIONS

ITEMS SHOWN BOLD AND SOLID ARE NEW

ITEMS SHOWN LIGHT ARE EXISTING AND TO REMAIN

GUIDE TO LINEWEIGHTS AND LINETYPES FOR MECHANICAL ITEMS

INDICATES SPACE TO BE REMODELED UNDER THIS PROJECT

ITEMS SHOWN BOLD AND DASHED ARE TO BE REMOVED

P

R

GW

THERMOSTAT/SENSOR

THERMOMETER

HOSE BIBB

INSTRUMENT GAUGE WELL

(PETE'S PLUG)

PRESSURE GAUGE

RELIEF VALVE

GRILLE OR DIFFUSER MARK

PLUMBING FIXTURE MARK

MECHANICAL

(CONTRACTOR)

VOLUME DAMPER

WALL CLEANOUT

VENT THROUGH ROOF

VD

WCO

VTR

TYP TYPICAL

MECH.

ROOM NUMBER

XX

XXXX SECTION REFERENCE

DETAIL REFERENCE

BALANCE CFM

NOTE DESIGNATION

GENERAL MECHANICAL SYMBOLS

ARCHITECTURAL PLANS

AFF ABOVE FINISH FLOOR

FCO

CO

ARCH.

FLOOR CLEANOUT

CLEANOUT

ARCHITECT OR

(ELEVATION)

AD ACCESS DOOR

CLEANOUT TO GRADECOTG

EXHAUSTEXH

EXHAUST AIREA

SUPPLY AIRSA

OUTSIDE AIROA

RETURN AIRRA

TRANSFER AIRTA

MANUFACTURERMFR

STRAINER (W/BLOWDOWN)

PIPE FITTINGS AND SPECIALTIES

VALVE IN VERTICAL PIPE

GATE VALVE OR BALL VALVE

CHECK VALVE

BALL VALVE

CONCENTRIC REDUCER

PIPE DOWN

UNION

PIPE UP

FLOW BALANCE DEVICE

PIPE TEE UP

PIPE TEE DOWN

WATER HAMMER ARRESTOR (WHA)

DUCT WORK AND SPECIALTIES

M MOTORIZED DAMPER

TURNING VANES

RADIUSED ELBOW

RADIUSED ELBOW

W/ TURNING VANES.

FLEXIBLE DUCT CONNECTION

RECTANGULAR DUCT TAKEOFF

(FIRST FIGURE INDICATES

12"x8"

WITH VOLUME DAMPER

FACING SIDE)

CONICAL SPIN-IN WITH

ACCESS DOOR

AD

VD

VOLUME DAMPER

SHEET METAL DUCT

VOLUME DAMPER

VD

ACOUSTICALLY LINED DUCT

HIGH EFFICIENCY TAKEOFF

VD

W/ VOLUME DAMPER

VD

ROUND ELBOW

FIRE/SMOKE DAMPER

FSD

DOMESTIC HOT WATER (POTABLE)

DOMESTIC COLD WATER (POTABLE)

SPECIAL EQUIPMENT DRAIND

PIPING SYMBOLS

DHR

DHW

DOMESTIC HOT WATER

RECIRCULATION (POTABLE)

FTU FAN TERMINAL UNIT

HEATING WATER SUPPLY/RETURNHWS/R

SYMBOL DESCRIPTION

MECHANICAL LEGEND

DCW

A. ALL CONSTRUCTION ACTIVITIES SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES, ORDINANCES, STANDARDS, REGULATIONS, AND CRITERIA.

B. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL REQUIRED PERMITS AND INSPECTIONS. MECHANICAL CONTRACTOR SHALL DETERMINE METHODS, PHASING, AND

SEQUENCE OF MECHANICAL WORK TO SATISFY CONTRACT DOCUMENT REQUIREMENTS.

C. THE CONTRACTOR IS RESPONSIBLE FOR THE MEANS AND METHODS OF CONSTRUCTION AND ALL JOB RELATED SAFETY STANDARDS SUCH AS OSHA. IT IS THE CONTRACTOR'S

RESPONSIBILITY TO BE FAMILIAR WITH THE WORK REQUIRED IN THE CONSTRUCTION DOCUMENTS AND THE REQUIREMENTS FOR EXECUTING IT PROPERLY.

D. CHANGES OR DEVIATIONS FROM THE DRAWINGS MADE WITHOUT WRITTEN CONSENT OF THE GOVERNMENT ARE NOT PERMITTED. COORDINATE ANY NECESSARY MODIFICATIONS WITH

THE GOVERNMENT PRIOR TO COMMENCEMENT OF THE WORK IN QUESTION.

E. ALL CONTRACTORS PERFORMING THE WORK ENCLOSED IN THIS PLAN SET SHALL BE SOLELY RESPONSIBLE FOR THE COORDINATION OF THIS WORK BETWEEN ALL OTHER DISCIPLINES.

F. IN CASE OF DISCREPANCIES BETWEEN THE GENERAL NOTES, CONTRACT DOCUMENTS, SPECIFICATIONS AND REFERENCE STANDARDS, THE GOVERNMENT SHALL DETERMINE WHICH

SHALL GOVERN.

G. UNLESS SPECIFICALLY INDICATED BY NOTATION "NO SUBSTITUTES" THE EQUIPMENT FOR THIS PROJECT AS SCHEDULED ON THE DRAWINGS CONSTITUTES THE BASIS FOR DESIGN AND IS

ELIGIBLE FOR SUBSTITUTION IN ACCORDANCE WITH THE PROVISIONS OF PROJECT SPECIFICATIONS AND GENERAL CONDITIONS OF THE CONTRACT.

H. SUBMITTALS: SUBMIT COMPLETE MANUFACTURER'S DATA FOR ALL EQUIPMENT SCHEDULED, SPECIFICALLY INDICATING ALL PROPOSED EQUIPMENT AND OPTIONS. COMPLY WITH ALL

GENERAL SUBMITTAL REQUIREMENTS AS FOUND IN THE PROJECT SPECIFICATIONS.

I. INSTALLATION:

a. PREWORK: MECHANICAL CONTRACTOR SHALL REVIEW AND VERIFY ALL DIMENSIONS PRIOR TO WORK. REPORT ANY OBSERVED AMBIGUITY, OMISSION, OR ERROR, IN WRITING, AT

ONCE TO THE GENERAL CONTRACTOR.

b. SEQUENCING: MECHANICAL CONTRACTOR SHALL DETERMINE METHODS, PHASING, AND SEQUENCE OF MECHANICAL WORK TO SATISFY CONTRACT DOCUMENT REQUIREMENTS.

c. CLEANING: THE CONTRACTOR SHALL, AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATION OF WASTE MATERIALS OR RUBBISH CAUSED BY THEIR WORK.

SUBCONTRACTORS SHALL REMOVE ALL RUBBISH, TOOLS, SCAFFOLDING AND SURPLUS MATERIALS AND LEAVE THE JOB IN A BROOM CLEAN CONDITION. ALL FIXTURES, EQUIPMENT, GLAZING, FLOORS, ETC., SHALL BE LEFT CLEAN AND READY FOR OCCUPANCY UPON COMPLETION OF THE PROJECT.

PROJECT NOTES

STATIC PRESSURE IS IN INCHES WATER COLUMN, DATUM ELEVATION OF 3,600 FT.

HOODTHROATHOODCURB CAPTHROATTYPEMODEL

MFRNO.

SIZE - INCHES

S.P.CFM

NOTES

ALUMINUM GRAVITY RELIEF VENTILATOR OF BOLTED AND WELDED CONSTRUCTION, A RADIUS THROAT FOR OPTIMUM PERFORMANCE, LIFT LUGS, RAIN GUTTER, TO PREVENT RAIN INFILTRATION, CONTINUOUSLY WELDED CURB CAP CORNERS FOR LEAK PROTECTION. PROVIDE WITH ALUMINUM BIRDSCREEN AND ELECTROSTATICALLY APPLIED BAKED POLYESTER POWER COATING. COORDINATE CURB CAP CONSTRUCTION SIZE WITH EXISTING ROOF CURB TO BE REPAIRED UNDER THIS PROJECT.

GV

3 3-- 31"x27" INTAKE FOR EXISTING AHU-3, WEIGHT = 97LB1

GRAVITY VENTILATOR SCHEDULE

LOREN

COOK

VENTILATOR

GI DUCTED

INTAKE

FREE AREA SQ-FT AIR FLOW

600 0.015

GV

INTAKE FOR EXISTING AHU-12, WEIGHT = 186 LB1LOREN

COOK GI DUCTED

INTAKE

3600- 10.75- 0.04559"x51"

12"x12"

30"x30"

EMERGENCY EXHAUST FANEEF

GLOBAL STRIKE COMMAND

MALMSTROM AIR FORCE BASE, MONTANA

LAWRENCE J.

WYATT

No. 39050 PE

1 MECHANICAL AND PLUMBING ROOF DEMOLITION PLAN

SCALE: 1/32"=1'-0"

160 8 32 48 64 12896 N

GLOBAL STRIKE COMMAND

MALMSTROM AIR FORCE BASE, MONTANA

GENERAL NOTE:

RESTRICTED AREA ACCESS: ACCESS TO PORTIONS OF THE ROOF WILL BE RESTRICTED AT CERTAIN TIMES DUE TO OPERATIONS WITHIN THE FACILITY. CONSTRUCTION PERSONNEL MUST REMAIN WITHIN THE DESIGNATED CONSTRUCTION LIMITS AT ALL TIMES, AS DETERMINED BY THE GOVERNMENT, AND MUST NOT ENTER INTO OR ABOVE RESTRICTED AREAS. MOVEMENT OUTSIDE APPROVED WORK ZONES IS PROHIBITED UNLESS AUTHORIZED AND ESCORTED BY GOVERNMENT PERSONNEL. VIOLATIONS OF THIS REQUIREMENT MAY RESULT IN IMMEDIATE REMOVAL FROM THE PROJECT SITE. REGULARLY OCCURRING PROJECT SCHEDULE MEETINGS WILL BE HELD IN ORDER TO COORDINATE WORK AREAS AND RESTRICTED AREAS.

LAWRENCE J.

1 MECHNICAL AND PLUMBING ROOF REMODEL PLAN

SCALE: 1/32"=1'-0"

160 8 32 48 64 12896 N

GLOBAL STRIKE COMMAND

MALMSTROM AIR FORCE BASE, MONTANA

GENERAL NOTE:

RESTRICTED AREA ACCESS: ACCESS TO PORTIONS OF THE ROOF WILL BE RESTRICTED AT CERTAIN TIMES DUE TO OPERATIONS WITHIN THE FACILITY. CONSTRUCTION PERSONNEL MUST REMAIN WITHIN THE DESIGNATED CONSTRUCTION LIMITS AT ALL TIMES, AS DETERMINED BY THE GOVERNMENT, AND MUST NOT ENTER INTO OR ABOVE RESTRICTED AREAS. MOVEMENT OUTSIDE APPROVED WORK ZONES IS PROHIBITED UNLESS AUTHORIZED AND ESCORTED BY GOVERNMENT PERSONNEL. VIOLATIONS OF THIS REQUIREMENT MAY RESULT IN IMMEDIATE REMOVAL FROM THE PROJECT SITE. REGULARLY OCCURRING PROJECT SCHEDULE MEETINGS WILL BE HELD IN ORDER TO COORDINATE WORK AREAS AND RESTRICTED AREAS.

LAWRENCE J.

INSULATED ROOF CURB

FOR INSTALLATION SEE

ROOF DECK

ROOF INSULATION

EXISTING ROOF STRUCTURE

EXISTING EMERGENCY EXHAUST DUCTWORK

INSULATE DECK PENETRATION TO FILL ANNULAR SPACE

EXISTING ROOFING ASSEMBLY, FOR PATCH,

SEALING AND REPAIR DETAILS SEE STRUCTURAL.

NEW SHEET METAL FLASHING - SECURE TO CURB

AND DUCTWORK, SEAL AROUND PERIMETER

REPAIRED/SEALED/NEW ROOFING

MEMBRANE, SEE STRUCTURAL DETAILING

NEW WOOD NAILER ON REUSED

CONCRETE ROOF CURB, SEE

STRUCTURAL (TYPICAL)

TRANSITION FROM

NEW TO EXISTING

DUCTWORK BELOW

CURB LINE.

NOTE:

ONLY 1X EMERGENCY EXHAUST FAN SYSTEM MAY BE TAKEN OFFLINE AT ANY ONE TIME

WHEN PERFORMING THE DUCT REPAIRS. COORDINATE WORK PLAN AND TIMING WITH

GOVERNMENT MINIMUM OF 5 WORKING DAYS AHEAD.

GLOBAL STRIKE COMMAND

MALMSTROM AIR FORCE BASE, MONTANA

LAWRENCE J.