This document is a Questions and Answers (Q&A) file related to an electrical roof remodel project at Global Strike Command, Malmstrom Air Force Base, Montana, specifically for Repair Building 1840 Roof.

The project involves installation of heat tape in all existing gutters and downspouts connected to a new heat trace control cabinet located in the electrical room. Heat tape shall be self-regulating type, Raychem GM-2XT Series, 12 watts per foot or approved equal. Circuiting requirements include 12 anticipated circuits, each fed by 30-amp circuit breakers with 30mA GFCI protection, connected via 2#8 and #10G conductors in 3/4" conduit to avoid excessive voltage drop. Heat tape must be looped down and back up each roof drain and downspout. The electrical work requires engineered shop drawings from the heat tape manufacturer detailing circuiting requirements, zoning, moisture/thermostat locations, and wiring requirements. The project also includes disconnecting and reconnecting an exhaust fan once mechanical and roofing contractors complete their modifications, with conduit and wire extensions as required. Q&A Question 38 addresses contractor inquiries regarding the specific locations of downspouts shown on elevation views and whether heat tape is supposed to be extended to the next gutter, with yellow flag notes indicating government clarification is needed on these points.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A question 12 &13

1 ELECTRICAL ROOF REMODEL PLAN

SCALE: 1/32"=1'-0"

160 8 32 48 64 12896 N

SPECIFIC SHEET NOTES:

PROVIDE HEAT TAPE IN ALL EXISTING GUTTERS AND DOWNSPOUTS

AND CONNECT TO NEW HEAT TRACE CONTROL CABINET LOCATED

IN ELECTRICAL ROOM. PROVIDE ENGINEERED SHOP DRAWINGS

FROM HEAT TAPE MANUFACTURER NOTING CIRCUITING

REQUIREMENTS FROM CONTROL CABINET, ZONING, AND

MOISTURE/THERMOSTAT LOCATIONS AND WIRING REQUIREMENTS.

HEAT TAPE SHALL BE SELF REGULATING TYPE, RAYCHEM GM-2XT

SERIES, 12 WATTS PER FOOT, OR APPROVED EQUAL. CONNECT

HEAT TAPE CIRCUITS VIA 2#8 AND #10G IN 3/4" CONDUIT PER EACH

CIRCUIT TO AVOID EXCESSIVE VOLTAGE DROP. 12 CIRCUITS ARE

ANTICIPATED, EACH FED BY 30 AMP CIRCUIT BREAKER WITH 30mA

GFCI PROTECTION.

LOOP HEAT TAPE DOWN AND BACK UP EACH ROOF DRAIN/

DOWNSPOUT (NOTED BY "RD"). SEE STRUCTURAL ELEVATIONS FOR

ROOF HEIGHTS AND/OR DOWN SPOUT LENGTHS.

DISCONNECT EXHAUST FAN AND RECONNECT ONCE MECHANICAL

AND ROOFING CONTRACTORS HAVE MADE THEIR MODIFICATIONS.

EXTEND CONDUIT AND WIRE AS REQUIRED.

1 TYPICAL2 TYPICAL

GLOBAL STRIKE COMMAND

MALMSTROM AIR FORCE BASE, MONTANA

GENERAL NOTE:

RESTRICTED AREA ACCESS: ACCESS TO PORTIONS OF THE ROOF WILL BE RESTRICTED AT CERTAIN TIMES DUE TO OPERATIONS WITHIN THE FACILITY. CONSTRUCTION PERSONNEL MUST REMAIN WITHIN THE DESIGNATED CONSTRUCTION LIMITS AT ALL TIMES, AS DETERMINED BY THE GOVERNMENT, AND MUST NOT ENTER INTO OR ABOVE RESTRICTED AREAS. MOVEMENT OUTSIDE APPROVED WORK ZONES IS PROHIBITED UNLESS AUTHORIZED AND ESCORTED BY GOVERNMENT PERSONNEL. VIOLATIONS OF THIS REQUIREMENT MAY RESULT IN IMMEDIATE REMOVAL FROM THE PROJECT SITE. REGULARLY OCCURRING PROJECT SCHEDULE MEETINGS WILL BE HELD IN ORDER TO COORDINATE WORK AREAS AND RESTRICTED AREAS.

BRAD M.

KAUFFMAN

No. 14587 PE

Q&A Question 38

Austin Wall Type

Austin Wall Type

Austin Callout Question to the government.

Are these downspouts and heat tape supposed to be extended to the next gutter?

Austin Line

Austin Note 3/32"

Austin Callout Question to the government.

Are these downspouts locations that show on the elevation view suppose to get heat tape as well?

East Exterior Elevation

West Exterior Elevation

North Exterior Elevation

South Exterior Elevation

GLOBAL STRIKE COMMAND

MALMSTROM AIR FORCE BASE, MONTANA

NF

N

SE

OIS LA

IGNE

N

OR

P

M

O AT

EE

AN

R

FLAG NOTES

EPOXY INJECT CRACKS SEE

SPECIFICATION

32" = 1'-0"

32" = 1'-0"

32" = 1'-0"

32" = 1'-0"

Q&A Question 38

AutoCAD SHX Text 9'-9 "34"

AutoCAD SHX Text 23'-2"

AutoCAD SHX Text 11'-10"

AutoCAD SHX Text 36'-0"

AutoCAD SHX Text 8'-8"

AutoCAD SHX Text 27'-4 "14"

AutoCAD SHX Text 7'-4"

AutoCAD SHX Text 3'-2"

AutoCAD SHX Text 19'-2"

AutoCAD SHX Text 12'-6"

AutoCAD SHX Text 11'-4"

AutoCAD SHX Text 12'-5 "34"

AutoCAD SHX Text 6'-5 "12"

AutoCAD SHX Text 11'-10 "12"

AutoCAD SHX Text 14'-8"

AutoCAD SHX Text 12'-0"

AutoCAD SHX Text 20'-8"

AutoCAD SHX Text 24'-3 "12"

AutoCAD SHX Text 12'-10"

AutoCAD SHX Text 9'-9 "12"

AutoCAD SHX Text 4'-2 "78"

AutoCAD SHX Text 24'-3 "12"

AutoCAD SHX Text 22'-8"

AutoCAD SHX Text 10'-8"

AutoCAD SHX Text 13'-1 "12"

AutoCAD SHX Text 11'-3 "14"

AutoCAD SHX Text 11'-10 "12"

AutoCAD SHX Text 9'-1 "34"

AutoCAD SHX Text 27'-1"

AutoCAD SHX Text 18'-8"

AutoCAD SHX Text 12'-0"

AutoCAD SHX Text 15'-1 "34"

AutoCAD SHX Text 21'-1 "34"

AutoCAD SHX Text

ELEVATION VIEWS

AutoCAD SHX Text

AutoCAD SHX Text 24-035-S4X

AutoCAD SHX Text S4.0

AutoCAD SHX Text

ATTACHMENT:

AutoCAD SHX Text

FA4626-XX-X-XXXX

AutoCAD SHX Text

REV.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

APPR'D

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

REVIEWED BY

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PLATE

AutoCAD SHX Text

PAGE

AutoCAD SHX Text

OF

AutoCAD SHX Text

PROJECT NUMBERS

AutoCAD SHX Text

ACAD DRAWING NUMBER

AutoCAD SHX Text

RECORD FILE NUMBER

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text

AutoCAD SHX Text

NZAS 23-0059

AutoCAD SHX Text

REPAIR BLDG 1840 ROOF

AutoCAD SHX Text 10/09/25

AutoCAD SHX Text

RRB

AutoCAD SHX Text

RRB

AutoCAD SHX Text

RLT

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text

15168 PE

AutoCAD SHX Text

BLAKE

AutoCAD SHX Text

RODNEY R.

Austin Callout Question to the government.

Are these downspouts and heat tape supposed to be extended to the next gutter?

Austin Callout Question to the government.

Are these downspouts locations that don't show on E1.2 suppose to get heat tape as well?

E1.2