640 HVAC_QA.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- HVAC Chillers
- Solicitation number
- FA4626-25-Q-0019
About this file
This document is a Questions and Answers (Q&A) spreadsheet for Solicitation FA4626-25-Q-0019, which seeks the procurement of four HVAC chillers for Malmstrom Air Force Base in Montana. The chillers include one 70-ton unit with a cold start and dry cooler, one 90-ton chiller, one 40-ton chiller, and one 50-ton chiller, with specific technical requirements including air-cooled outdoor units, 208V 3-phase 60 Hz power, and propylene glycol/water processing fluid. Key specifications include a chiller setpoint of 45 degrees, design flow of 210 gpm, entering temperature of 54 degrees, and leaving temperature of 44 degrees, with an ambient air temperature of 95 degrees.
The Q&A document clarifies critical details such as no installation required, delivery to 341 CES at Malmstrom AFB, factory startup needed, and no specific brand preference. Voltage, power, and technical specifications were extensively discussed, with vendors seeking clarification on equipment details. The solicitation is for comfort cooling purposes, with a delivery deadline that allows for current market lead times. The procurement is managed by the Department of the Air Force Global Strike Command, with questions due by April 27th and an emphasis on meeting the specified technical requirements for the HVAC units.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment2 HVAC Chillers_Combo.pdf | ||
| 40T HVAC_QA.xlsx | XLSX spreadsheet | |
| 4100 HVAC_QA.xlsx | XLSX spreadsheet | |
| Amendment2 HVAC Chillers.pdf | ||
| 330 HVAC_QA.xlsx | XLSX spreadsheet | |
| Amendment 001 Ack.pdf | ||
| Amendment 001 HVAC Chillers_Combo.pdf | ||
| Attch 1_Salient Characteristics_HVAC Chillers.pdf | ||
| HVAC Chillers Combo.pdf | ||
| Attch 2_Clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| HVAC Units/ FA4626-25-Q-0019 | |||
| Questions and Answers | |||
| Question # | Question | Answer | |
| 1 | |||
| Air-cooled / Water-cooled? | Air Cooled | ||
| 2 | Indoor/Outdoor? | Outdoor | |
| 3 | Chiller setpoint? | 45 | |
| 4 | Process return temperature? | 54 | |
| 5 | Is pumping and/or tank required? | No | |
| 6 | Process fluid (water / propylene glycol) | Propylene glycol and water | |
| 7 | How much power do you have to tie into these chillers? (If you need power we can bring in generators) | Power is on site | |
| 8 | We would need to know your hose/cable runs. | Awaiting clarification of question. | |
| 9 | Can you please provide the complete specs required in the chillers? | 90Ton Design flow 210 gpm entering temperature 54 leaving temperature 44 Ambient Air 95 | |
| 10 | Can you provide any model number for the reference? | 90Ton Design flow 210 gpm entering temperature 54 leaving temperature 44 Ambient Air 95 | |
| 11 | Can you confirm that this is Buy American? | N/A | |
| 12 | Please confirm the voltage? | 208V 3 PH 60 Hz | |
| 13 | Please confirm that these are air cooled chillers? | Yes | |
| 14 | Is this existing equipment and if so can you please provide pics of the tags? | Awaiting clarification of question. | |
| 15 | What are the voltage requirements? | 208V 3 PH 60 Hz | |
| 16 | Are the chillers indoor or packaged outdoor units? | Outdoor | |
| 17 | Are the units self-contained with pumps, tanks etc.? | no | |
| 18 | Where would you need them to be delivered to? | 341 CES Malmstrom AFB Montana | |
| 19 | Will you require factory startups? | Yes | |
| 20 | Could you please provide the complete specifications of the Chillers? | 90Ton Design flow 210 gpm entering temperature 54 leaving temperature 44 Ambient Air 95 | |
| 21 | Incoming and Leaving Water Temperatures – Could you please provide the desired entering and leaving water | ||
| temperatures for each chiller unit? | 45 55 | ||
| 22 | Power Requirements – Please confirm the electrical specifications required for each unit (e.g., voltage, phase, frequency). | 208V 3 PH 60 Hz | |
| 23 | Installation Site Conditions – If available, any additional site-related data (e.g., ambient conditions, available space | ||
| for dry cooler) would also be helpful. | Ready for unit and Drycooler | ||
| 24 | Could you kindly send over specifications for each unit? | 90Ton Design flow 210 gpm entering temperature 54 leaving temperature 44 Ambient Air 95 | |
| 25 | Please advise voltage needed, what options are needed, any specific capacity requirements - | ||
| flow rates, temperature requirements etc. | 208V 3 PH 60 Hz | ||
| 26 | Would you happen to know the Pre-existing Unit info for the chillers that are being replaced? | Model = CGAM 90Ton Design flow 210 gpm entering temperature 54 leaving temperature 44 Ambient Air 95 | |
| 27 | Do you have any specs for this equipment? | 90Ton Design flow 210 gpm entering temperature 54 leaving temperature 44 Ambient Air 95 | |
| 28 | Design winter ambient temps? | 55 | |
| 29 | Design voltage? | 208V 3 PH 60 Hz | |
| 30 | Design fluid temps? | 45 | |
| 31 | Specifically looking for info on: | ||
| • | Chiller Voltage | ||
| • | Tonnages listed are nominal or at specific performance criteria? Glycol %? | ||
| • | Dry cooler capacity and change over temp for full capacity? | ||
| • | No installation is required, but is offloading or any other site work necessary? | 280V 50% Glycol 100 Percent capacity 45 degree change over NO | |
| 32 | I need a bit more information regarding the electrical voltages as well as the glycol cooler. Could you please confirm if you require 480V 3-phase or 208-240V 3-phase? How many CFM on glycol cooler? How many gallons per minute needed for sufficient flow? What are the entering and leaving water temps? | 208V 3 PH 60 Hz | |
| 33 | I am currently seeking to submit a bid for the respective solicitation and would like to inquire if you can provide the detailed specifications for all four chillers. | ||
| 90Ton Design flow 210 gpm entering temperature 54 leaving temperature 44 Ambient Air 95 | |||
| 34 | |||
| Are there any specifications such as the voltages and unit optimizations that can be provided? | 208V 3 PH 60 Hz | ||
| 35 | |||
| Are there any specifications such as the voltages and unit optimizations that can be provided? | 208V 3 PH 60 Hz | ||
| 36 | Could you please confirm whether the chillers should be configured as single-circuit systems or dual-circuit systems for redundancy | ||
| and operational reliability? | Either | ||
| 37 | I am currently seeking to submit a bid for the respective solicitation and would like to inquire if you can provide the detailed | ||
| specifications for all four chillers | 90Ton Design flow 210 gpm entering temperature 54 leaving temperature 44 Ambient Air 95 | ||
| 38 | Could you please clarify the voltage required for the HVAC Chillers Solicitation Notice ID FA4626-25-Q-0019 | ||
| submitted on Sam.gov? | 208V 3 PH 60 Hz | ||
| 39 | Could you please mention more specifications regarding this request? | 90Ton Design flow 210 gpm entering temperature 54 leaving temperature 44 Ambient Air 95 | |
| 40 | What process will these chillers be serving? (Comfort Cooling or Manufacturing or other Process Coolin)? | Comfort | |
| 41 | What voltage do the chillers need to be? | 208V 3 PH 60 Hz | |
| 42 | Footprint of chillers? I see the Salient Characteristic document, but want to more information with square footage of pad and thickness etc. | PAD will be poured to fit unit after unit has been delivered | |
| 43 | To quote standard units we will need electrical power supply and certainly elevation and confirm ambient conditions. | 208V 3 PH 60 Hz | |
| 44 | Is the "cold start and dry cooler" only required for the 70 ton? | Yes | |
| 45 | The solicitation states that no installation is required, but who is responsible for offloading the chillers from the truck when | ||
| they arrive on site? | 341 CES | ||
| 46 | Was there a Brand preference? | No specific brand preffered. Chiller must satisfy specifications. | |
| 47 | Are there any specifications such as the voltages and unit optimizations that can be provided? | 208V 3 PH 60 Hz | |
| 48 | Blueprints and Layout Drawings: | ||
| o | Scaled diagrams that detail the dimensions of the equipment and the pad. | ||
| o | Include placement, clearances, and any necessary anchoring points. | ||
| If there are any technical documents, specifications, or resources available, I would be grateful if you could share them. | N/A | ||
| 49 | Re the request for the (4) HVAC Chillers. Was there a Brand preference? | ||
| No specific brand preffered. Chiller must satisfy specifications. | |||
| 50 | What process will these chillers be serving? (Comfort Cooling or Manufacturing or other Process Cooling)? | Comfort | |
| 51 | What voltage do the chillers need to be? | 208V 3 PH 60 Hz | |
| 52 | Can you please provide a detailed item specification to the HVAC Chillers Solicitation Notice ID FA4626-25-Q-0019 posted on sam.gov? | 90Ton Design flow 210 gpm entering temperature 54 leaving temperature 44 Ambient Air 95 | |
| 53 | Is the "cold start and dry cooler" only required for the 70 ton? | Yes | |
| 54 | Upon review, it is evident that we need additional information, such as referenced brand, model numbers, product details such as equipment voltages, etc. in order to be able to put together a quotation. | 208V 3 PH 60 Hz | |
| 55 | Will there be a submittal and review process for the proposed chillers prior to, or after the date of contract? If so will the time in review be considered as part of the 90-days? | There is not a submittal process.The product quoted must meet the specifications within the solicitation. | |
| 56 | Are there liquidated damages or other considerations if this deadline is not met? | Considerations will be pursued if the delivery deadline is not met. | |
| 57 | Lead times on equipment can fluctuate. Do you want information of the current published lead times for the prosed chillers provided on the solicitation? | No, as long as the product arrives within the delivery deadline. | |
| 58 | We are tracking SAM.GOV but still there is no addendum for the specifications of the chillers. | ||
| Could you please let us know how long it will take you to get it published on the website. | This document is intended to clarify specifications needed for this requirement. |
| 83 |
| 84 |
| 85 |
| 86 |
| 87 |
| 88 |
| 89 |
&"Times New Roman,Regular"&P of &N
Sheet2
| remove draft stamp |
| topr may 4th 3 pm |
| questions due by the 27th of April |
| Wage Determination |
| Skim through TOPR |