Attach 2 Material Submital.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Remodel Dorm 740 Federal contract opportunity
Solicitation number
FA4626-10-R-0021
Issued by
Department of the Air Force Global Strike Command

About this file

Attachment 2 (Material Submittals)

View the file

Other files for this federal contract opportunity

Other files attached to Remodel Dorm 740, newest first.
File Type Posted
Questioins and Answers 7.docx DOCX document
Questions and Answers 6.docx DOCX document
BIRD COVE DETAIL.pdf PDF
Questions and Answers 5.docx DOCX document
Questions and Answers 4.docx DOCX document
Amendment 0002.doc DOC document
085113-revised on Sept 9 2010.doc DOC document
Amendment 0001.doc DOC document
010100-Revised.9-9-2010.doc DOC document
TOC.Revise.9-9-2010doc.doc DOC document
Question and Answers 3.docx DOCX document
Questions 2.docx DOCX document
740 Site Visit.pdf PDF
Questions 1.docx DOCX document
Attch 4 Drawings.zip ZIP file
Solicitation.doc DOC document
Attch 6 Past Performance Questionnaire.docx DOCX document
Attch 7 - Subcontractor Consent Form - 10R0027.docx DOCX document
Attach 5 Wage Determination Building.docx DOCX document
Attach 1 Specifications.zip ZIP file
Attch 3 Schedule of Drawings.DOC DOC document
Attach 5 Wage Determination Heavy.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 04-1041Remodel Dorm 740FA4626-10-R-0021
TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHERREQUIRED SUBMISSION DATE (BY A&E)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1No Work Condition Notification 01000 3.31
2As-Built Field Drawings 01000 3.5.22
3Final As-Built Record Drawings 01000 3.5.42
4Shop Drawings 01000 3.103
5Start of Work Notification 01000 3.111
6Notice of Final Inspection 01000 3.121
7Notice of Excavation Near Utilities 01000 3.13.11
8Utility Outage Notification 01000 3.141
9Schedule of (AF Form 66) Submittals 01000 3.1515 ANP
10Quality Control Plan 01001 3.18.5310 ANP
111354 Checklist 01000 3.191
12Work Schedule Change Notification 01000 3.201
13Nuclear Densometer Documentation 01000 3.211
14
15
16MPDES Stormwater Permit 01360 2.2 & 4.3.1.1 NOI Package & Notice of Termination - Draft1
17MPDES Stormwater Permit 01360 2.2 & 4.3.1.1 NOI Package & Notice of Termination - Final1
18Haz Mat Data 01360 7.1.11
19AF Form 3952 Haz Mat 01360 7.1.21
20Emergency Planning and Community Right to Know Act (EPCRA) Certification 01360 8.01
21Disposal documents and weight tickets 01360 11.5.61
22Non-Hazardous Solid Waste Division Report 01360 11.61
23Geotextile Sample 02110 1.41
24Geogrid Sample 02110 1.41
25Geogrid and Geotextile Certificate of Compliance 02110 1.41
26Native Soil Moisture Density Lab Tests 02230 1.43
27Sub-Excavation Replacement Soil Gradation and Atterberg Limits Lab Tests 02230 1.43
28Certified Gravel Gradation & Atterberg Limits 02235 1.43
29Gravel Moisture Density Lab Tests 02235 1.43
30Tack Oil Certification of Compliance 02502 1.31
31Asphalt Mix Formula 02510 1.4 A3
32Bitumen Test Reports 02510 1.4 B3
33Field Sample and Core Test Reports 02510 1.4 C3
34Pavement Marking Paint Certification 02760 1.23
35Irrigation Analysis 03284 1.5 A3
36Preliminary Irrigation Design 03284 1.5 B3
37Final Irrigation Design 03284 1.5 C3
38High-light Descripitive Literature 03284 1.5 D1
39Product Data 03284 1.5 E1
40Wiring Diagrams 03284 1.5 F1
41Wire Splicing Components 03284 1.5 G1
42Coordination Drawings 03284 1.5 H1
43Qualification Data 03284 1.5 I1
44Zoning Chart 03284 1.5 J1
45Controller Timing Schedule 03284 1.5 K1
46Field Quality - Control Reports 03284 1.5 L1
47Operation and Maintenance Data 03284 1.5 M2
48As-built Drawings 03284 1.5 N3
49Intent to Place Concrete Notification 03310 1.41
50Concrete Product Data 03310 1.6, A.3
51Concrete Testing Services Qualifications 03310 1.6, B3
52Concrete Materials Samples 03310 1.6, B3
53Concrete Mix Design 03310 1.6, C3
54Concrete Test Results 03310 1.6, D3
55Schedule of Selective Demolition 024119-1.4.C33
56Product Data Literature 042000-1.3333
57Product Data Literature 061000-1.3.B3
58Product Data Literature 064023-1.3.B, E, F333
59Shop Drawings 064023-1.3.C3
60Product Data Literature 07920033
61Product Test Reports 079200333
62Submittals for Steel Doors and Frames 081119 - 1.2333
63Submittals for Aluminum Windows 084110-1.43333
64Manufacturer Product Data Literature 087110-1.2.B3
65Final Hardware Schedule 087110-1.2.F3
66Product Data Samples 087110-1.2.E3
67Submittals for Glazing 088000-1.433
68Submittals for Gypsum Board Assemblies 092900-1.43
69Material List Literature 09900-1.3.B.13
70Product Data Manufacturers Literature 099100-1.3.B3
71Qualification Data Literature 099100-1.3.D3
Schedule of Abbreviations:
D - DaysPSW - Prior to Start WorkPFI - Prior to Final Inspection
AFI - After Final InspectionBBCW - Before Beginning Concrete WorkPPC - Prior to Project Completion
ANP - After Notice to ProceedBD - Before DeliveryPT - Prior to Testing
ATT - After Test is TakenPBC - Prior to Beginning Construction

&"Times New Roman,Regular"&12Attachment 2 &"Times New Roman,Regular"&12Title &"Times New Roman,Regular"&12FA4626-xx-R-xxxx

&"Times New Roman,Regular"&12This list is not all inclusive. If needed, additional items may be added.

AF Form 66 &D &"Times New Roman,Regular"&12

SS-&P

REQUIRED TECHNICAL SUBMITTALS