26QA202 Amend 3 SF30.pdf

PDF 604 KB Posted

Attached to
FY26 LRS Vertical Carousels Federal contract opportunity
Solicitation number
FA462026QA202
Issued by
Department of the Air Force Air Mobility Command

About this file

This is Amendment 0003 to solicitation FA462026QA202 issued by the 92nd Contracting Squadron at Fairchild Air Force Base, Washington. The amendment is effective January 30, 2026, and addresses contractor questions raised during a site visit regarding the procurement of vertical carousels.

The amendment clarifies two key requirements: (1) each Contract Line Item Number (CLIN) for vertical carousels must include all labor, tools, equipment, parts, transportation, and supervision necessary to remove the existing carousel and to deliver, install, test, and fully integrate the new vertical carousel in accordance with the Statement of Work and salient characteristics in the solicitation; and (2) the order of delivery and installation will be coordinated with the 92 Logistics Readiness Squadron point of contact after award, and offerors are not required to propose a specific installation sequence. The amendment does not extend the offer receipt deadline. Offerors must acknowledge receipt of this amendment prior to the deadline by completing items 8 and 15, acknowledging receipt on each copy of the offer submitted, or submitting a separate letter or telegram referencing the solicitation and amendment numbers. Contractors are required to sign and return one copy of the amendment to the issuing office. Contracting Officer Kathleen L. Rauch issued this amendment, and attachments include the site visit MFR and sign-in sheet.

View the file

Other files for this federal contract opportunity

Other files attached to FY26 LRS Vertical Carousels, newest first.
File Type Posted
26QA202 COMBO REV 1.pdf PDF
26QA202 Amend 11 SF30.pdf PDF
26QA202 Amend 10 SF30.pdf PDF
26QA202 SOW (REV 4).pdf PDF
26QA202 Amend 9 SF30.pdf PDF
26QA202 SOW (REV 3).pdf PDF
26QA202 Amend 8 SF30.pdf PDF
26QA202 Amend 7 SF30.pdf PDF
26QA202 Amend 6 SF30.pdf PDF
26QA202 SOW (REV 2).pdf PDF
26QA202 Amend 5 SF30.pdf PDF
Attachment 1 - SOW (REV1).pdf PDF
26QA202 Amend 4 SF30.pdf PDF
26QA202 Site Visit Sign in Sheet.pdf PDF
26QA202 Site Visit MFR.pdf PDF
26QA202 Amend 2 SF30.pdf PDF
26QA202 Amend 1 SF30.pdf PDF
26QA202 COMBO.pdf PDF
Attachment 1 - SOW.pdf PDF
NMR Individiual Waiver Approval AF Vertical Carousels.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXCEPTION OF SF 30, APPROVED BY NARS 5/79

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

FA462026QA202

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

30 January 2026

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY

CODE

FA4620 7. ADMINISTERED BY (If other than Item 6)

CODE

92nd Contracting Sq./PKA 110 W Ent St., Suite 200 SAME AS BLOCK 6 Fairchild AFB, WA 99011 Attn: kathleen.rauch@us.af.mil

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) () 9A. AMENDMENT OF SOLICITATION NO.

X

FA462026QA202

All Offerors 9B. DATED (SEE ITEM 11)

8 January 2026

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [] is extended, [X] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning _1_ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [] is not, [X] is required to sign this document and return _1_ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE SUMMARY OF CHANGES

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10 A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

KATHLEEN L. RAUCH, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 30-105-03 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FA462026QA202

Amendment 0003 Page 2

SUMMARY OF CHANGES

1. The purpose of this amendment is to answer contractor questions and to provide a copy of the site visit MFR/Sign In Sheet.

Q1: During the site visit, an offeror asked whether each CLIN for the vertical carousel should include installation. Should the quoted price for each CLIN include all labor and materials required to remove the existing carousel and install the new one?

A1: Yes. The price for each CLIN shall include all labor, tools, equipment, parts, transportation, and supervision necessary to remove the existing vertical carousel and to deliver, install, test, and fully integrate the new vertical carousel in accordance with the Statement of Work and the salient characteristics provided in the solicitation.

Q2: During the site visit, an offeror asked whether the Government requires the vertical carousels to be delivered and installed in a specific order.

A2: The order of delivery and installation will be coordinated with the 92 LRS point of contact after award.

Offerors are not required to propose a specific installation sequence as part of their quote.

2. All other items remain unchanged

Fill out blocks 15a, 15b, and 15c and provide a copy with your proposal.

END SUMMARY OF CHANGES

Attachments:

26QA202 Site Visit MFR 26QA202 Site Visit Sign In Sheet

File details come from the government source that posted it. Updated .