25R0002_Amend0003-SOWAtchH-UtilityMaps.pdf

PDF 8 MB Posted

Attached to
FA462025R0002 - Repair (Cnsld-Demo) Mission Support Group, 2245/2248/2249, Fairchild AFB, WA
Solicitation number
FA462025R0002
Issued by

About this file

The file is a utility map for a Dig Permit at Fairchild Air Force Base, showing a detailed aerial view of utility infrastructure across multiple scales (1:600 and 1:1,200). The map meticulously documents various utility systems including thermal, fuel, sewer, storm, communication, electrical, and gas lines using a color-coded legend. Key infrastructure elements annotated include a 120/208 500 kVA Electrical Transformer, Sewer Vault, a Contractor's laydown area, an 8" CI Water line valved and capped, and a 2" HDPE Natural Gas line also valved and capped. The map is part of the SOW Attachment H for contract FA462025R0002, which involves renovation of Mission Support Group buildings 2245/2248/2249 at Fairchild AFB, Washington. The document is marked as Controlled Unclassified Information (CUI) with limited distribution authorized only to the Department of Defense and DoD contractors.

View the file

Other files

File Type Posted
25R0002_Amend0006-SF30-20250623.pdf PDF
25R0002_Atch2-Amend0006-SOW20250623.pdf PDF
25R0002_Amend0006-SOWAtchB-ConceptDrawings.pdf PDF
25R0002_Amend0005-SF30-20250617.pdf PDF
25R0002_Amend0004-SF30-20250609.pdf PDF
25R0002_Atch2-Amend0003-SOW20250530.pdf PDF
25R0002_Amend0003-SF30-20250530.pdf PDF
25R0002_Amend0003-SOWAtchB-ConceptDrawings.pdf PDF
25R0002_Amend0002-SF30-20250528.pdf PDF
SOWAtchT_Amend0002-ElvtrRm.pdf PDF
25R0002_Atch2-Amend0002-SOW20250428.pdf PDF
25R0002_PreProposalSiteVisitSignIn-20250522.pdf PDF
25R0002_Amend0001-SF30-20250522.pdf PDF
25R0002_SOWAtchN-FlowTestResults.pdf PDF
25R0002_Atch8-PastPerformanceInfo.pdf PDF
25R0002_SOWAtchJ1-As-BuiltsDrawings1.pdf PDF
25R0002_SOWAtchA-SiteLocation.pdf PDF
25R0002_SOWAtchK-As-BuiltsDrawings.pdf PDF
25R0002_SOWAtchB-ConceptDrawings15APR2025.pdf PDF
25R0002_SOWAtchJ3-As-BuiltsDrawings3.pdf PDF
25R0002_Atch10-RealIDActPamphlet.pdf PDF
25R0002_SOWAtchF-HazardousMaterialsSurvey.pdf PDF
25R0002_Atch11-WA20240114-Building.pdf PDF
25R0002_Atch5-FAFBIFS.pdf PDF
25R0002_SOWAtchJ2-As-BuiltsDrawings2.pdf PDF
25R0002_Atch2-SOW20250423.pdf PDF
25R0002_Atch7-PastPerfCvrLtrQuestionnaire.pdf PDF
25R0002_SOWAtchH-UtilityMaps.pdf PDF
25R0002_Atch9-SubKTRTeamingArrngmntRelease.pdf PDF
25R0002_SOWAtchO-MechanicalCalculations.pdf PDF
25R0002_Atch1-PriceSchedule.pdf PDF
25R0002_SOWAtchI-ExistingFloorPlans.pdf PDF
25R0002_SOWAtchG-Geotech-NearbyAreas.pdf PDF
25R0002_SOWAtchM-DesignRequirements.pdf PDF
25R0002_SOWAtchE-ProgramAreasTable.pdf PDF
25R0002_SOWAtchR-BasisofDesignSolarRoadPanel.pdf PDF
25R0002_Atch3-2025BDGSpecs.pdf PDF
25R0002_SOWAtchL-As-BuiltsDrawings.pdf PDF
25R0002_SF1442-09MAY2025.pdf PDF
25R0002_SOWAtchD-RoomDataSheets.pdf PDF
25R0002_SOWAtchS-RectangularRapidFlashingBeacon.pdf PDF
25R0002_SOWAtchQ-SHPODefiningFeatures.pdf PDF
25R0002_Atch4-2025BDGDataSheets.pdf PDF
25R0002_SOWAtchC-OutlineSpecifications.pdf PDF
25R0002_SOWAtchP-StructuralCalculations.pdf PDF
25R0002_Atch6-FAFBClimateWeatherData.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI//GEO//LIMDIS

Dig Permit

Fairchild AFB

• Thermal Pump ♦ Thermal Junctions

- Thermal Line (AB)

- Chiller Line Return

- Chiller Line Supply () Fuel Filter Strainer

Fuel Fitting •-�• Fuel Hydrant

Water Storage Tank De-Icing Fluid Tank

Fuel Meter

[IJ Fuel Pump Station

Fuel Valve

Deicing Fluid Lines

♦ Sewer Fitting

■ Sewer Grease Trap

• Sewer Manhole

Fuel Line (AB) Fuel Line

• Fuel Containment Area Fuel Station Area Fuel Storage Tank Fuel Marker

A Fuel Test Station

• Fuel Rectifier

■ Fuel Anode

• Radio Transmitter

■ Sewer Oil-Water Separator • Radio Receiver E3 Buried Line Sensor D Comm Manhole D Comm Pedestal •comm Vault

□ Comm Other

- Sewer Pump

• Sewer Septic Tank

■ Sewer Valve

- Sewer Gravity Main (AB)

..A. Storm Discharge

• Storm Drain Inlet

• Storm Manhole .Storm Pump

■ Storm Valve

- Storm Line (AB)

-+- Comm Line Abandoned -comm Line D Comcast Manhole

D Comcast Pedestal

■ Comcast Vault

□ Comcast Other co Comcast Line @ Utility Pole -<Sr Electrical Exterior Light

• Electrical Generator + Electrical Manhole

--·· Storm Open Drainage

• Electrical Meter

■ Electrical Switch

Gas Meter Propane Tank Gas Valve Gas Line Gas Line (AB)

.A. Electrical Transformer

- Electrical Overhead Transmission = Electrical Overhead Primary

- Electrical Underground Primary

- Electrical Underground Primary (AB)

- , Electrical Underground Secondary

- Electrical Underground Secondary (AB)

- - - Electrical Overhead Secondary

- Electrical Grounding

• Monitoring Well

□ ERP Sites

Magnetic Declination:

13.97°E

Scale 1 :600

1 inch = 50 feet

---=======---==::::J Feet

0 20 40 60 80

Projection: NAD83 WA State Plane North FIPS 4601 Datum & Spheroid: NAD83/NAVD88

Controlled by: Air Force Controlled by: 92 CES/CENME CUI Category: GEO, OPSEC

Distribution Statement: D Distribution authorized to the Department of Defense and DoD contractors only POC: A. Avenido, GeoBase Adm in, Fairchild AFB

92 CES/CENME, GeoBase USAF, Air Mobility Command

Fairchild AFB, WA 99011 247-9399

Print Date: 5/20/2025 DigPermit_P _ 11X17.mxd https ://maps. af. mi I/g eoporta I/ apps/sites/#/fai rch i Id

FA462025R0002

SOW Attachment H - Amend 0003 - Utility Map

CUI//GEO//LIMDIS

Dig Permit

Fairchild AFB

• Thermal Pump ♦ Thermal Junctions

- Thermal Line (AB)

- Chiller Line Return

- Chiller Line Supply () Fuel Filter Strainer

Fuel Fitting •-�• Fuel Hydrant

Water Storage Tank De-Icing Fluid Tank

Fuel Meter

[IJ Fuel Pump Station

Fuel Valve

Deicing Fluid Lines

♦ Sewer Fitting

■ Sewer Grease Trap

• Sewer Manhole

Fuel Line (AB) Fuel Line

• Fuel Containment Area Fuel Station Area Fuel Storage Tank Fuel Marker

A Fuel Test Station

• Fuel Rectifier

■ Fuel Anode

• Radio Transmitter

■ Sewer Oil-Water Separator • Radio Receiver E3 Buried Line Sensor D Comm Manhole D Comm Pedestal •comm Vault

□ Comm Other

- Sewer Pump

• Sewer Septic Tank

■ Sewer Valve

- Sewer Gravity Main (AB)

..A. Storm Discharge

• Storm Drain Inlet

• Storm Manhole .Storm Pump

■ Storm Valve

- Storm Line (AB)

-+- Comm Line Abandoned -comm Line D Comcast Manhole

D Comcast Pedestal

■ Comcast Vault

□ Comcast Other co Comcast Line @ Utility Pole -<Sr Electrical Exterior Light

• Electrical Generator + Electrical Manhole

--·· Storm Open Drainage

• Electrical Meter

■ Electrical Switch

Gas Meter Propane Tank Gas Valve Gas Line Gas Line (AB)

.A. Electrical Transformer

- Electrical Overhead Transmission = Electrical Overhead Primary

- Electrical Underground Primary

- Electrical Underground Primary (AB)

- , Electrical Underground Secondary

- Electrical Underground Secondary (AB)

- - - Electrical Overhead Secondary

- Electrical Grounding

• Monitoring Well

□ ERP Sites

Magnetic Declination:

13.98°E

Scale 1: 1,200

1 inch = 100 feet

---=======---==::::J Feet

0 40 80 120 160

Projection: NAD83 WA State Plane North FIPS 4601 Datum & Spheroid: NAD83/NAVD88

Controlled by: Air Force Controlled by: 92 CES/CENME CUI Category: GEO, OPSEC

Distribution Statement: D Distribution authorized to the Department of Defense and DoD contractors only POC: A. Avenido, GeoBase Adm in, Fairchild AFB

92 CES/CENME, GeoBase USAF, Air Mobility Command

Fairchild AFB, WA 99011 247-9399

Print Date: 5/20/2025 DigPermit_P _ 11X17.mxd https ://maps. af. mi I/g eoporta I/ apps/sites/#/fai rch i Id

FA462025R0002

FA462025R0002

1161298499C Polygonal Line

1161298499C Typewritten Text Temporary Office Facilities

1161298499C Polygonal Line

1161298499C Typewritten Text Contractor's laydown area

DigPermit_GJKZ221007PA_2.pdf
DigPermit_GJKZ221007PA_1.pdf

File details come from the government source that posted it. Updated .