FA4620-17-R-B001_Atch_1A_MACC_Seed_Project_Price_Schedule.pdf
PDF 575 KB Posted
- Attached to
- FY17 MACC Federal contract opportunity
- Solicitation number
- FA4620-17-R-B001
About this file
Attachment 1A Seed Project Price Schedule
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
CAP 1008257
FY17 Airfield Pavement Marking Fairchild Air Force Base, Washington
CLIN DESCRIPTION QTY UNIT UNIT
PRICE
AMOUNT
0001 BASE PRICE ITEM:
All labor, materials and equipment necessary to paint reflective lines/letters/markings per project drawings, Statement of Work, and all basic contract requirements associated with the above listed work, complete. (New markings counted twice)
0001AA PROJECT CAP1008257:
All labor, materials and equipment necessary for reflective painting, described in CLIN 0001 above, complete.
399,300 SF
0002 BASE PRICE ITEM:
All labor, materials and equipment necessary to paint non-reflective lines/letters/markings, excluding Warning Boxes, per project drawings, Statement of Work, and all basic contract requirements associated with the above listed work, complete. (New markings counted twice)
0002AA PROJECT CAP1008257:
All labor, materials and equipment necessary for non-reflective painting described in CLIN 0002 above, complete.
272,000 SF
0003 BASE PRICE ITEM:
All labor, materials and equipment necessary to paint non-skid lines/letters/markings per project drawings, Statement of Work, and all basic contract requirements associated with the above listed work, complete. Includes non-skid media in lieu of reflective media.
0003AA PROJECT CAP 1008257:
All labor, materials and equipment necessary for non-skid painting, described in CLIN 0003 above, complete.
546 SF
0004 BASE PRICE ITEM:
All labor, materials and equipment necessary to completely remove painted markings per project drawings, Statement of Work, and all basic contract requirements associated with the above listed work, complete.
0004AA PROJECT CAP1008257:
All labor, materials and equipment necessary for paint removal, described in CLIN 0004 above, complete.
26,700 SF
0005 BASE PRICE ITEM:
All labor, materials and equipment necessary to completely
FA4620-17-R-B001
Atch 1A MACC Seed Project Price Schedule paint Airfield Warning Boxes per project drawings, Statement of Work, and all basic contract requirements associated with the above listed work, complete. (New Boxes counted twice)
0005AA PROJECT CAP 1008257:
All labor, materials and equipment necessary to paint Airfield Warning Boxes, described in CLIN 0005 above, complete.
425 EA
0006 BASE PRICE ITEM:
All labor, materials and equipment necessary for mobilization and de-mobilization (full de-mobilization* and return on another day) for all long term unscheduled air traffic interruptions.
0006AA PROJECT CAP1008257:
Mobilization and de-mobilization for all long term unscheduled air traffic interruptions.
4 EA NTE
0007 BASE PRICE ITEM:
All labor, materials and equipment necessary for mobilization and partial de-mobilization (short term demobilization returning the same day with no cleaning out of the paint equipment) for all short term (one to two hours) unscheduled air traffic interruptions.
0007AA PROJECT CAP1008257:
Mobilization and de-mobilization for all short term (one to two hours) unscheduled air traffic interruptions.
4 EA NTE
TOTAL BASE PRICE ITEMS, CLINs 0001 through 0007 TOTAL
* CLIN 0006 -Full de-mobilization and mobilization includes de-mobilizing from the runway site and remobilizing returning to mobilize on another day.
** CLIN 0007 -Partial de-mobilization for a few hours and returning with the paint equipment and the same paint in the equipment up to a few hours later on the same day.
FA4620-17-R-B001
Atch 1A MACC Seed Project Price Schedule
| BASE PRICE ITEM: |
| PROJECT GJKZ 17-0004: |
| BASE PRICE ITEM: |
| PROJECT GJKZ 17-0004: |
| BASE PRICE ITEM: |
| PROJECT GJKZ 17-0004: |
| BASE PRICE ITEM: |
| BASE PRICE ITEM: |
| All labor, materials and equipment necessary to completely paint Airfield Warning Boxes per project drawings, Statement of Work, and all basic contract requirements associated with the above listed work, complete. (New Boxes counted twice) |
| PROJECT GJKZ 17-0004: |
| All labor, materials and equipment necessary to paint Airfield Warning Boxes, described in CLIN 0005 above, complete. |
| BASE PRICE ITEM: |
| PROJECT GJKZ 17-0004: |
| Mobilization and de-mobilization for all long term unscheduled air traffic interruptions. |
| BASE PRICE ITEM: |
| All labor, materials and equipment necessary for mobilization and partial de-mobilization (short term demobilization returning the same day with no cleaning out of the paint equipment) for all short term (one to two hours) unscheduled air traffic interruptions. |
| PROJECT GJKZ 17-0004: |
| Mobilization and de-mobilization for all short term (one to two hours) unscheduled air traffic interruptions. |