Amendment 01 - 2012 Matoc.pdf
PDF 31 KB Posted
- Attached to
- Multiple Award Task Order Contract (MATOC) at Fairchild AFB WA Federal contract opportunity
- Solicitation number
- FA4620-12-R-B002
About this file
Amendment 01
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See block 10 continuation page.
1. CONTRACT ID CODE PAGE OF PAGES
J
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-May-2012
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4620-12-R-B002
X 9B. DATED (SEE ITEM 11)
09-May-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-May-2012
CODE
92 CONTRACTING SQUADRON
BLDG 2451
110 W ENT STREET
SUITE 200
FAIRCHILD AFB WA 99011-8568
FA4620 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
1035797366A Typewritten Text
1035797366A Typewritten Text
FA4620-12-R-B002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this amendment is to make the following changes:
1. Change Item B. in Block 10 on the SF 1442 solicitation, FROM:
B. Government anticipates up to 3 awards. This acquisition is an 8(a) set-aside.
TO:
B. Government anticipates up to 3 awards. This acquisition is an 8(a) set-aside limited to construction firms with a bona fide place of business within SBA Region 10.
2. Change Section L – Instructions, Conditions and Notices, paragraph 1.11
1.11 The past performance proposal (Volume I) and price proposal (Volume II) shall include the documents required. The price proposal must be based on the offeror's own proposal for the seed project and the Government's specifications as set forth herein. The Government will evaluate the price proposal in accordance with Section M. Offerors shall submit one (1) original and two (2) paper copies of Volume I. Offerors shall submit one (1) original and two (2) paper copies of Volume II.
Volume Submission Requirements Copies (Paper) Page Limit Volume I Past Performance (P.P. Vol. is due by 25
May 2012) 3 30 Max
Volume II Price and Contract Forms 3 Unlimited
TO:
1.11 The past performance proposal (Volume I) and price proposal (Volume II) shall include the documents required. The price proposal must be based on the offeror's own proposal for the seed project and the Government's specifications as set forth herein. The Government will evaluate the price proposal in accordance with Section M. Offerors shall submit one (1) original and two (2) paper copies of Volume I. Offerors shall submit one (1) original and two (2) paper copies of Volume II.
Volume Submission Requirements Copies (Paper) Page Limit Volume I Past Performance (P.P. Vol. is due by 8 June
2012 at 3:00 pm (PDT)) 3 30 Max
Volume II Price and Contract Forms 3 Unlimited
3. Change Section L – Instructions, Conditions and Notices, paragraph 2.2.3
FA4620-12-R-B002
2.2.3 Relevant Contracts: Submit information on contracts that you consider relevant in demonstrating your ability to perform under the multiple award construction contract program.
Provide data for up to five relevant contracts held within the last three years for each entity the offeror wants the Government to consider. Performance Information Sheets for each contract is limited to three (3) pages. Include rationale supporting your assertion of relevance. Note that the Government will not consider performance on an effort that concluded more than three years prior to the issuance date of this solicitation. Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate.
Relevant past performance information must demonstrate design/build construction experience with multiple projects, such as new construction, renovation, alteration and repair, with associated architectural and engineering work, with multiple disciplines, such as airfield, pavement, renovation, repair, additions/upgrades, along with specific work in heating, ventilation and air conditioning (HVAC), electrical, mechanical and other major trades. Projects shall be similar in size, scope, and complexity as those anticipated under this contract, i.e., having a project value between at least $250,000 and include projects with the Federal Government, state and local government agencies, and commercial customers.
TO:
2.2.3 Relevant Contracts: Submit information on contracts that you consider relevant in demonstrating your ability to perform under the multiple award construction contract program.
Provide data for up to five relevant contracts held within the last three years for each entity the offeror wants the Government to consider. Performance Information Sheets for each contract is limited to three (3) pages. Include rationale supporting your assertion of relevance. Note that the Government will not consider performance on an effort that concluded more than three years prior to the issuance date of this solicitation. Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate.
Relevant past performance information must demonstrate design/build construction experience with multiple projects, such as new construction, renovation, alteration and repair, with associated architectural and engineering work, with multiple disciplines, such as airfield, pavement, renovation, repair, additions/upgrades, along with specific work in heating, ventilation and air conditioning (HVAC), electrical, mechanical and other major trades. Projects shall be similar in size, scope, and complexity as those anticipated under this contract, i.e., having a project value between $50,000 and $500,000 and include projects with the Federal Government, state and local government agencies, and commercial customers.
4. All others terms and conditions remain the same and unchanged.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .