2012 MATOC Atch 3 MATOC Seed Proj Price Schedule.pdf

PDF 11 KB Posted

Attached to
Multiple Award Task Order Contract (MATOC) at Fairchild AFB WA Federal contract opportunity
Solicitation number
FA4620-12-R-B002
Issued by
Department of the Air Force Air Mobility Command

About this file

Atch 3 Seed Proj Price Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Task Order Contract (MATOC) at Fairchild AFB WA, newest first.
File Type Posted
Amendment 03 - Q A.pdf PDF
SOW REVISED 29 May 2012 Repair Fire Sprinklers Corner Tower Stairs.pdf PDF
Appendix B Haz Mat Survey Revised 29 May 2012.pdf PDF
FA4620-12-R-B002 FINAL.pdf PDF
Amendment 01 - 2012 Matoc.pdf PDF
2012 MATOC Atch 2 MATOC Seed Project TORFP Cover Ltr.pdf PDF
2012 MATOC Atch 5 Past Perf Questionnaire rev 3 May 12.pdf PDF
2012 MATOC Atch 8d WD Residential 6Apr12 - Spokane County.pdf PDF
2012 MATOC Solicitation.pdf PDF
2012 MATOC Atch 11 Fairchild AFB Operational Climatic Data Summary.pdf PDF
2012 MATOC Atch 7 Subcontractor Release.pdf PDF
2012 MATOC Atch 1 MATOC Specs Rev 3 May 12.pdf PDF
2012 MATOC Atch 4 Past Performance Info 1 May 12.pdf PDF
2012 MATOC Atch 2 Seed Proj 10-0184 SOW Repair Fire Sprinklers Dated 16 Mar 12 with Attachments.pdf PDF
2012 MATOC Atch 5 Past Perf cover letter.pdf PDF
2012 MATOC Atch 6 SOW for Orientation Seminar.pdf PDF
2012 MATOC Atch 8b WD Heavy 6Apr12 —
2012 MATOC Atch 10 Fairchild AFB Architectural Compatibility Plan.pdf PDF
2012 MATOC Atch 8c WD Highway 4May12 - Statewide.pdf PDF
2012 MATOC Atch 8a WD Building 6Apr12 - Spokane County.pdf PDF
2012 MATOC Atch 9 Base Design Standards 2012.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4620-12-R-B002

Attachment 3

Price Schedule

PRICE SCHEDULE

GJKZ 10-0184

Repair Hangar Fire Sprinklers, Corner Tower Stairs, Building 2050

Fairchild Air Force Base, Washington

CLIN DESCRIPTION QTY UNIT AMOUNT

0001 BASE PRICE ITEM:

Work includes, but is not limited to, design and construction (w/required demolition) actions at Building 2050. The repair shall provide complete fire sprinkler protection for the east and west Annex Stair Towers (four towers).

0001AA 0001AA PROJECT GJKZ 10-0184:

All labor, materials, design, and equipment necessary to accomplish the material submittal process, construction, and closeout complete, including all general requirements associated with CLIN 0001.

1 LS $

TOTAL BASE, CLIN 0001 TOTAL $

File details come from the government source that posted it. Updated .